Loading...
HomeMy WebLinkAbout143.112 - Sewage Design Plan (Copy 2)G SOIL TEST PIT DATA: SEPTEMBER 29, 2005 TEST PIT #1 TEST PIT 42 TEST PIT A3 GRD. EL. 82.8 GRD. EL. 84.4 GRD. EL. 85.3 •' NA i N A MIN./INCH NA I EST. Will EL = 75.3 LOAMY SAND 10YR 7/3 L_ 90" 156" EST. HIGH GW. EST. HIGH GW. A LOAMY SAND 10YR 3/2 LOAM B SAND 10YR 5/6 EL = 82.6 MEDIUMI SAND 10YR 7/4 52" LOAMY2SAND tOYR 7/4 COARSE SAND 10YR 7/3 FILL EL = 73.4 COARSE SAND 10YR 7/3 132" 180" DATE: DATE: 9/29/05 9/29/05 TEST BY: TEST BY: THE BSC GROUP, INC. THE BSC GROUP, INC. WITNESSED BY: WITNESSED BY: AMY VON HONE AMY VON HONE PERC. RATE: PERC. RATE: i N A MIN./INCH N/A MIN./INCH SOIL EVALUATOR SOIL EVALUATOR MARK DIBB MARK DIBB SOIL CLASS: SOIL CLASS: 1 1 L.T.A.R. L.T.A.R. 0.74 G.P.D./SQ.FT. 0.74 G.P.D./SQ.FT. TEST PIT #4 TEST PIT #6 GRD. EL. 84.6 GRD. EL. 82.5 EST. HIGH GW. NA EST. HIGH GW. NO WATER TO 62 79.00 16" FILL EL = 82.6 A LOAMY SAND 10YR 3/2 52"- B LOAMYSAND 10YR 5/6 MEDIUMI SAND 10YR 7/3 162" 168" 192" EL = 69.1 186 ZONING DISTRICT: R-40 B-1 DATE: DATE: 9/29/05 10/13/05 TEST BY: TEST BY: THE BSC GROUP, INC. THE BSC GROUP, INC. WITNESSED BY: WITNESSED BY - AMY VON HONE BRUCE MURPHY PERC. RATE: PERC. RATE:N N/A MIN./INCH A MIN./INCH SOIL EVALUATOR SOIL EVALUATOR MARK DIBB MARK DIBB 16" SEPTIC TANK DETAIL: 1,500 GALLON H-20 DISTRIBUTION BOX DETAIL: NOT TO SCALE LEACHING DETAIL: H--20 NOT TO SCALE NOT TO SCALE N0. OF OUTLETS : 9 � 4, 5. INLET AND OUTLET TEES TO BE CAST IRON, 1 42.5 NO ITS: 1. SEPTIC TANK SHALL BE STEEL FINISHED GRADE 4" PVC REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. 2. SEPTIC TANK TO WITHSTAND H-20 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. PIPE REMOVABLE 3" WALLS 3. ALL PIPE CONNECTIONS AND CONCRETE COVER NOTES: CONSTRUCTION SHALL BE WATERTIGHT. y;: ,+.,; 5^ 1. DIST. BOX TO WITHSTAND H-20 LOADING 4. FILL ALL UNUSED KNOCKOUT'S WITH PVC BARRIER 2. PROVIDE INLET TEE OR BAFFLE WHERE MORTAR. W/ METAL HANDLES BROUGHT 2-24" DIA CONCRETE MANHOLES SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR TO 6 OF FINISH GRADE "`111 4• T 20" IN PUMPED SYSTEM. T56� " 12'-10" 11 p• g' I 3. FIRST TWO FEET OF PIPE OUT OF DIST. 'r- 50.5 TEE To BE UNDER 6" 9,5' OUTLETS 1 PLAN VIEW - LEACHING CHAMBERS M.H. OPENING 12" MIN. •. .• BOX TO BE LAID LEVEL. OVER L .u... A -+, •... O OY e4 OM1 �// /� � � -�/ 6 ed v�c� ��� e d1�4yo�°o �c'Eb�e L 4, RECOMMENDED MANUFACTURER-ROTONDO 32" 11'-0' RAISE M.H F6" BOTTOM ON'jE�L �/� 4" OR APPROVED EQUAL. - LOAM & SEED. DISTURBED AREAS SEWER BRICK -.�:: ::� STABLE BASE 6" MIN. 3/4" TO 5. ALL PIPE CONNECTIONS AND CONCRETE �•• 10'-0" & MORTAR 1 1/2" CRUSHED CONSTRUCTION SHALL BE WATERTIGHT. -77 NORMAL WATER LEVEL 12" CROSS-SE�3TION STONE BASE 3' MAX. COMPACTJ�Fl36" MAXIMUM,12"MINIMUM 6. FIT BREAKOUT BARRIER SNUG AROUNDPRECAST SEPTIC TANK 10" 3"14" " DnGB� SEAL. D USE EPDXY RESIN FOR WATER „ 0Q°ppQ p p 3"LAYRPEASTONE INLET TEE rS 5'_p^ O O C� O C� C� C� REMOVE __30' 7. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. 36 " 000 C� C� C� C� -_ 24 UNSUITABLE O5-0" 4 -9' ` 6'-0" PRECAST DIST.4'-1' MIN. ao• BERo ori - IEFFEC. Q7 MATERIAL FOR _ 30" BOX /'18" I DEPTH [y 0 C� � C� � C� 5' ALL AROUND z = LIQUID DEPTH 1 scA? a j 1 C4�J „ 6 -2" - DIAMETER EL = 73.6 140 CLEANoor _ _ c: I 56„ 3/4" - 1 1/2„ DATE: :��.::..i:"9,:; r :.:: _ e ,��::_F: s 1 WASHED STONE 9/29/05 ohpa BOTTOM ON LEVEL STABLE BASE �$a PLAN VIEW 6" 12'-10" TEST BY:.V/// s" MIN. 3/4' To CROSS-SECTION VIEW 22'-10' THE BSC GROUP, INC. 1 1/2' STONE WITNESSED BY: AMY VON HONE PERC. RATE: 3 MIN./INCH SOIL EVALUATOR MARK DIBB SOIL CLASS: 1 L.T.A.R. 0.74 G.P.D./SQ.FT. INDICATES V_ ESTIMATED SEASONAL HIGH GROUND NATER INDICATES g OBSERVED GROUND WATER INDICATES PERC. TEST INDICATES UNSUITABLE MATERIAL I SOIL CLASS: SOIL CLASS: 1 1 L.T.A.R. L.T.A.R. 0.74 G.P.D./SQ.FT. 0.74 G.P.D./SQ.FT. DATUM: VERTICAL DATUM: ASSUMED BENCH MARK SET: HYDRANT TAG BOLT EL = 83.84 PROFILE: NOT TO SCALE ALL COMPONENTS H-20 FIRST PIPE LENGTH TOP FOUNDATION CONCRETE COVERS TO TO BE SET LEVEL EL=85.2 FINISHED GRADE. FOR MW. 2' FINISH GRADE r_ EL = 82.1.-80 :,: 4" PVC SCH 40 4" PVC SCH 40 a: 4" PVCq• gy/ •gy .D ��� B./ I 1 rnNrPr-6- 64AMRFR .<_ 1 I=C 50UTLET DIST. BOX I=F 1 H 17' SEPARATION SEPTIC TANK { EST. HIGH GROUNDWATER I -E i MARK D. DIBB CIVIL No.45937 ,'/g/O S� 0 PLAN VI_lN CROSS-SECTION DF CHAMBER k o��o ` DESIGN CRITERIA: / gJG HYD EXIS77MG IDESIGN FLOW: BUILDING 8,490 S.F, OFFICE SPACE 75 GPD/1000 S.F, OFFICE SPACE TOTAL FLOW = 637 G,P,D. ZCIO REQUIRED SEPTIC TANK: CB •0 637 X 200% = 1274 GAL. SVeOV 9;/ SEPTIC TANK PROVIDED: = 1500 GAL. PROPOSED VENT / SIZE OF LEACHING FACILITY REQUIRED: �y5 �. a11k $ , PI d6, / '.,'" -PROPOSED . , y DESIGN PERC. RATE: 3 MIN./ INCH _ _ 50.5' X 12.8' ° _ 81 '� 2; � SOIL ABSORPTION UP / c13 o� N�6 e9 SYSTEM / LONG TERM APPL. RATE 0.74 G.P.D/S.F. - 2h 0 •_ EXlSTtNG �� _' x$Zh surtDrNc / A 637 GPD 0.74 GPD/SF = 861 S.F, D MH 0 O 14' DEAD PINE, ayh6 �� �'�, SIZE OF LEACHING FACILITY PROVIDED: USE PRE -CAST CONCRETE LEACHING CHAMBERSCS UNITS) 12,8At= X50,° / Y TION SYSTEM PROPOSED F T.- t? N SIDEWALL = 2(12.8'+50,5') X 2' = 253 -.. - `/-._ �/ 18'X' ,/(2) - - _ _ \ ! � U LEAC PI TONE O c"j 1 ti' X (F I IN 0 0' /. TEST 5 ROUN PIT 14" OAK ! PROPO D BO =7 O pA GAS AN BO YS gfi8. 2k 1 T WATER ERVI ES RESERVE UP ._ -- N OOry ` ' TESii •p, h -- INFILTRATION SYSTEM {2 O PIT DIRT P2 6 rn �6. >f7� 9k' PIT #4 W/(5) 6 42'X10' 'DIA. �� 1 ROPOSED 1,500/ LEACH PITS, 2' STONE TES 1 "i r� / r' C) $h 20 0y h GALLON SEPTIC F,P .AROUND ,Apos, d I INV IN=79 0 I 899 S.F. 899 S.F x 0.74 GPD/SF = 665 GPD 665 GPD PROVIDED > 637 GPD REQUIRED PIT 5 �oy� B� 2 STORY OFFICE y1 Zai TANK �P BOT LP=74.1 LOCUS �� F Q I\ I V 111 1 � � N \8490 F. OFFICE 5 /G00 BOT SYSTEM=72. BUILbiNG gh9 h 5 C8 CURRENT OWNER: WESTSIDE REALTY TRUST o ✓ °�� C8O�� \ J� TEST o. 1 TITLE REFERENCE: BOOK 10025, PAGE 135 PIT PLAN REFERENCE: L.C. 38339-B BOOK 206, PAGE 45 ck yh' ti FF=86.0 - \ TOF=85.87 ASSESSORS MAP: 143 oy•: DIRT PrtE PARCEL: 112 / r \� A"`moo Ps / oy >� 0TEST� X1� 1 PIT 3 0 PROPOSED ELECTRIC SERVICE �\\ GUY := WIRE wo 'o F PLAN VIEW \: �\ b • •� SCALE: 1° = 20 FEET f g � 0 10 20 40 FT, y z� 30'' �`i VARIANCES REQUESTED: NONECP �.-- � •-.� ��' 'oma $kgh 9 43 0 b p Q��; s 5, �� 9° • bo�� G \: N\ ! 1A21 /Q\ LO 2 0� BENCHMARK N G HYDRANT N. , WESTSIDE REALTY TRusr • TAG BOLT ASSESSORS MAP 143 EL=91.65 PARCEL 112 cj ASSUMED 44293tS.F. TOTAL 'A6 ZONING DISTRICT: R-40 B-1 GENERAL NOTES: INVERT ELEVATIONS: SETBACKS: FRONT 30' 30' DISPOSAL FACILITY ONLY. TOP OF FOUNDATION 85.87 A 4" INVERT AT BUILDING 83.00 B 4" INVERT AT SEPTIC TANK (IN) 82.50 C 4" INVERT AT SEPTIC TANK (OUT) 82.25 D 4" INVERT AT DIST. BOX (IN) 81.80 E 4" INVERT AT DIST. BOX (OUT) 81.63 F INVERTS AT LEACHING FACILITY: ZONE DISTRICT: 250015 0001 D DATED 7/2/92 NOT CONTAIN ANY MATERIAL LARGER THAN \T BEGINNING 4", INVERT MING CHAMBER 81.00 G BREAKOUT 81.50 OF LEACPAT BOTTOM PARTIAL: DISTRICT & ZONE II (PARTIALLY) `INFILTRA IG CHAMBER 79.00 K ELEVATION iERVED DEPTH TP#6 LOCUS PLAN: NO SCALE 10%100% MUST PASS #50 SIEVE LEACH 02.0 J OF LEACHIN (0.075 mm EFFECTIVE PARTICLE SIZE) BUT BOT SY f PPPl �c lull' � at7 6, O SIBLE FOR PROPERLY LOCATING AND MARK D. DIBB CIVIL No.45937 ,'/g/O S� 0 PLAN VI_lN CROSS-SECTION DF CHAMBER k o��o ` DESIGN CRITERIA: / gJG HYD EXIS77MG IDESIGN FLOW: BUILDING 8,490 S.F, OFFICE SPACE 75 GPD/1000 S.F, OFFICE SPACE TOTAL FLOW = 637 G,P,D. ZCIO REQUIRED SEPTIC TANK: CB •0 637 X 200% = 1274 GAL. SVeOV 9;/ SEPTIC TANK PROVIDED: = 1500 GAL. PROPOSED VENT / SIZE OF LEACHING FACILITY REQUIRED: �y5 �. a11k $ , PI d6, / '.,'" -PROPOSED . , y DESIGN PERC. RATE: 3 MIN./ INCH _ _ 50.5' X 12.8' ° _ 81 '� 2; � SOIL ABSORPTION UP / c13 o� N�6 e9 SYSTEM / LONG TERM APPL. RATE 0.74 G.P.D/S.F. - 2h 0 •_ EXlSTtNG �� _' x$Zh surtDrNc / A 637 GPD 0.74 GPD/SF = 861 S.F, D MH 0 O 14' DEAD PINE, ayh6 �� �'�, SIZE OF LEACHING FACILITY PROVIDED: USE PRE -CAST CONCRETE LEACHING CHAMBERSCS UNITS) 12,8At= X50,° / Y TION SYSTEM PROPOSED F T.- t? N SIDEWALL = 2(12.8'+50,5') X 2' = 253 -.. - `/-._ �/ 18'X' ,/(2) - - _ _ \ ! � U LEAC PI TONE O c"j 1 ti' X (F I IN 0 0' /. TEST 5 ROUN PIT 14" OAK ! PROPO D BO =7 O pA GAS AN BO YS gfi8. 2k 1 T WATER ERVI ES RESERVE UP ._ -- N OOry ` ' TESii •p, h -- INFILTRATION SYSTEM {2 O PIT DIRT P2 6 rn �6. >f7� 9k' PIT #4 W/(5) 6 42'X10' 'DIA. �� 1 ROPOSED 1,500/ LEACH PITS, 2' STONE TES 1 "i r� / r' C) $h 20 0y h GALLON SEPTIC F,P .AROUND ,Apos, d I INV IN=79 0 I 899 S.F. 899 S.F x 0.74 GPD/SF = 665 GPD 665 GPD PROVIDED > 637 GPD REQUIRED PIT 5 �oy� B� 2 STORY OFFICE y1 Zai TANK �P BOT LP=74.1 LOCUS �� F Q I\ I V 111 1 � � N \8490 F. OFFICE 5 /G00 BOT SYSTEM=72. BUILbiNG gh9 h 5 C8 CURRENT OWNER: WESTSIDE REALTY TRUST o ✓ °�� C8O�� \ J� TEST o. 1 TITLE REFERENCE: BOOK 10025, PAGE 135 PIT PLAN REFERENCE: L.C. 38339-B BOOK 206, PAGE 45 ck yh' ti FF=86.0 - \ TOF=85.87 ASSESSORS MAP: 143 oy•: DIRT PrtE PARCEL: 112 / r \� A"`moo Ps / oy >� 0TEST� X1� 1 PIT 3 0 PROPOSED ELECTRIC SERVICE �\\ GUY := WIRE wo 'o F PLAN VIEW \: �\ b • •� SCALE: 1° = 20 FEET f g � 0 10 20 40 FT, y z� 30'' �`i VARIANCES REQUESTED: NONECP �.-- � •-.� ��' 'oma $kgh 9 43 0 b p Q��; s 5, �� 9° • bo�� G \: N\ ! 1A21 /Q\ LO 2 0� BENCHMARK N G HYDRANT N. , WESTSIDE REALTY TRusr • TAG BOLT ASSESSORS MAP 143 EL=91.65 PARCEL 112 cj ASSUMED 44293tS.F. TOTAL 'A6 REVISIONS ZONING DISTRICT: R-40 B-1 GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND SETBACKS: FRONT 30' 30' DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND SIDE 20' 25' S OF HEALTH REGULATIONS, REAR 20' 20' UPL ° 40 OR EQUAL. MINIMUM LOT SIZE: 40,000 S.F. 25,000 S.F. LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR EXISTING TOTAL 44,293±S.F. 15V OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE LOT AREA: IMPERVIOUS MATERIAL 6. REPLACE ALL EXCAVATED MATERIAL WITH FEMA FLOOD ZONE "C" AS SHOWN ON PANEL MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES ZONE DISTRICT: 250015 0001 D DATED 7/2/92 NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 OVERLAY DISTRICT: AQUIFER PROTECTION OVERLAY REPRESENTATIVE SAMPLE OF FILL. UP TO 457 BY WEIGHT OF THE FILL SAMPLE MAY BE PARTIAL: DISTRICT & ZONE II (PARTIALLY) `INFILTRA OF FILL SAMPLE PASSING THE #4 SIEVE, SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING r 4 34'x1o' LOCUS PLAN: NO SCALE 10%100% MUST PASS #50 SIEVE LEACH 07-20% MUST PASS #100. SIEVE Yarrloath Ite??�tpy j2erp2rtelent E n. AROUNDy_ ILP (0.075 mm EFFECTIVE PARTICLE SIZE) BUT BOT SY f PPPl �c lull' � at7 6, O SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UPUTY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL. 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE x' LOCUS LOCATION AND INVERTS OF UnUTIES AND STRUCTURES' AS REQUIRED PRIOR' N 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER 1S NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. 9. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. „y 657 Main Street, (RT. 28) Unit 6 W. Yarmouth Massachusetts 02673 r �041kitRd<1Se-VIC.� DESIGN FOR SEWAGE DISPOSAL SYSTEM APACHE DRIVE YARMOUTH PORT MASSACHUSETTS PREPARED FOR: ' PORTSIDE DEVELOPEMENT PARTNERS C/0 �ipNta�!_ & RABER ARCHITECTS, INC. 203 WILLOW STREET f� DATE: DECEMBER 8, 2005 COMP./DESIGN: M. DIBB CHECK: K. HEALY DRAWN: M. DIBB FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 8882-SEP.DWG REVISIONS NO. DATE DESCRIPTION GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. O.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS, 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 15V OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL 6. REPLACE ALL EXCAVATED MATERIAL WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 SIEVE, SHALL 8E PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL. UP TO 457 BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE #4 SIEVE. SIEVE ANALYSES ALSO SHALL BE PERFORMED ON THE FRACTION OF FILL SAMPLE PASSING THE #4 SIEVE, SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING SPECIFICATIONS: 1007 MUST PASS #4 SIEVE (4.75 mm EFFECTIVE PARTICLE SIZE) 10%100% MUST PASS #50 SIEVE (0.30 mm EFFECTIVE PARTICLE SIZE) 07-20% MUST PASS #100. SIEVE (0.15 mm EFFECTIVE PARTICLE SIZE) 07,57 MUST PASS #200 SIEVE (0.075 mm EFFECTIVE PARTICLE SIZE) 7. EXISTING UllUnES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UPUTY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL. 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UnUTIES AND STRUCTURES' AS REQUIRED PRIOR' TO THE START. Off' CONSTRUCTION._ - 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER 1S NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. 9. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. „y 657 Main Street, (RT. 28) Unit 6 W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM APACHE DRIVE YARMOUTH PORT MASSACHUSETTS PREPARED FOR: ' PORTSIDE DEVELOPEMENT PARTNERS C/0 BROWN, LINDQUIST, FENUCCIO & RABER ARCHITECTS, INC. 203 WILLOW STREET YARMOUTH PORT, MA 02675 DATE: DECEMBER 8, 2005 COMP./DESIGN: M. DIBB CHECK: K. HEALY DRAWN: M. DIBB FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 8882-SEP.DWG DWG NO. 5662-03 SHEET 1 OF 1 JOB NO.4-8882.00