HomeMy WebLinkAbout85 Baker Road - Septic Designr
20 FT. MINIMI
10 FT. MINIMUM FROM
CONCRETE
COVERS -'-a
4e SCHEDULE 40 PVC PIPE
MIN. PITCH 1/8e PER FT.
/ 1
BAFFLE ELEV s Eop- ' SU LELEEV. !p ✓ e
DISTRIBUTION F/
plo "I BOX g/q„b
(TO BE PLACED ON FIRM BASE) TO BE WATER TESTED
1500 GALLON IF MORE THAN ONE OUTLET
SEPTIC TANK (TO BE PLACED ON FIRM BASE)
3/4e TO 1 1/2e
WASHED STONE
SEWAGE DISPOSAL SYSTEM PROFILE
NOT TO SCALE
J
\F
rr i
-4 :> -
CLEAN SAND
A AND SEED
2e LAYER OF
1/8' TO 1/2'
WASHED STONE
IDV. L;r a,
e
HIGH CAPACITYSTONE
WTH
TRENCH FORMATIOI`
SOIL ABSORPTION
SYSTEM (SAS)
NOTREQUIRED
1 CU. FT. OF
CONCRETE
ANCHOR
USGS PROBABLE WATER TABLE ELEV. _
OBSERVED WATER TABLE ( 7/ /'+ ) ELEV =
BOTTOM OF TEST HOLE ELEV. _
.\ p�
z F�
ryJ.
'ro /
/ � k i � •.� Pr .f r`
z
` s
� ,7,�.�c✓.r Nrtc ,.:� /
SOIL TEST
DATE OF SOIL TEST
SOIL TEST DONE BY SWEE ER ENGINEERING
WITNESSED BY s, . ':• P:. ee
OBSERVATION HOI E 1 ELEV.-%�
OBSERVATION HOLE 2 EIEV= �' C
PERCOLATION RATE t_ z- MIN./INCH PERCOLATION RATE G 'z-- MIN./INCH AT 16/INCHES
DEPTH
HORIZ
TOP OF"FOUNDA'PON
COLOR
MOTT.
OTHER
Ly, . i
10 FT. MINIMUM_
FINAL CONTOUR—LQ0_J --
( 110 GAL/BR./DAY X F SR.) GAL/DAY
SOIL TEST LOCATION
REQUIRED SEPTIC TANK CAPACITY = GAL
UTIUTY POLE -0•-
fF.
TOWN WATER —W -- W
SOIL CLASSIFICATION �I_
r/
DESIGN PERCOLATION RATE < 5 MIN./IN.
4' CAST IRON PIPE
EFFLUENT LOADING RATE 0.74 GAL/DAY/S.F.
`
rn
CESSPOOL C.P.0
t-•'`
Z
(OR EQUAL) MINIMUM
�,
LEACHING CAPACITY (AREA X RATE) %% GAL/DAY
5
:i
Z
RESERVE LEACHING CAPACITY ` F` GAL/DAY
PITCH 1/4PER FT.
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
NO.
I OO, g
REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
ELEV
WITHIN 6e OF FINISHED GRADE
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLt OF
r
lui• y_
10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
ELEV. -
`
U U!D
OUTLET
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
DEEDED OP ZONING REGULATIONS. OWRlM / APPLICANT IS TO
4 FEET
14 INCHES
6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
IS TO CALL "DIG -SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS
5
19 INCHES
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
}FFEEETTT
24 INCHES
IMMEDIATELY. f; &`
8. PARCEL IS IN FLOOD ZONE
9. LOT IS SHOWN ON ASSESSORS MAP f L AS PARCEL `� 4
8 FEET
34 INCCHES
4
i'
r
20 FT. MINIMI
10 FT. MINIMUM FROM
CONCRETE
COVERS -'-a
4e SCHEDULE 40 PVC PIPE
MIN. PITCH 1/8e PER FT.
/ 1
BAFFLE ELEV s Eop- ' SU LELEEV. !p ✓ e
DISTRIBUTION F/
plo "I BOX g/q„b
(TO BE PLACED ON FIRM BASE) TO BE WATER TESTED
1500 GALLON IF MORE THAN ONE OUTLET
SEPTIC TANK (TO BE PLACED ON FIRM BASE)
3/4e TO 1 1/2e
WASHED STONE
SEWAGE DISPOSAL SYSTEM PROFILE
NOT TO SCALE
J
\F
rr i
-4 :> -
CLEAN SAND
A AND SEED
2e LAYER OF
1/8' TO 1/2'
WASHED STONE
IDV. L;r a,
e
HIGH CAPACITYSTONE
WTH
TRENCH FORMATIOI`
SOIL ABSORPTION
SYSTEM (SAS)
NOTREQUIRED
1 CU. FT. OF
CONCRETE
ANCHOR
USGS PROBABLE WATER TABLE ELEV. _
OBSERVED WATER TABLE ( 7/ /'+ ) ELEV =
BOTTOM OF TEST HOLE ELEV. _
.\ p�
z F�
ryJ.
'ro /
/ � k i � •.� Pr .f r`
z
` s
� ,7,�.�c✓.r Nrtc ,.:� /
SOIL TEST
DATE OF SOIL TEST
SOIL TEST DONE BY SWEE ER ENGINEERING
WITNESSED BY s, . ':• P:. ee
OBSERVATION HOI E 1 ELEV.-%�
OBSERVATION HOLE 2 EIEV= �' C
PERCOLATION RATE t_ z- MIN./INCH PERCOLATION RATE G 'z-- MIN./INCH AT 16/INCHES
DEPTH
HORIZ
TEXTURE
COLOR
MOTT.
OTHER
FINAL SPOT ELEVATION 0 ..
TOTAL ESTIMATED FLOW
37'r
FINAL CONTOUR—LQ0_J --
( 110 GAL/BR./DAY X F SR.) GAL/DAY
SOIL TEST LOCATION
REQUIRED SEPTIC TANK CAPACITY = GAL
UTIUTY POLE -0•-
fF.
TOWN WATER —W -- W
SOIL CLASSIFICATION �I_
CATCH BASIN�®j
DESIGN PERCOLATION RATE < 5 MIN./IN.
GAS LINE G
EFFLUENT LOADING RATE 0.74 GAL/DAY/S.F.
`
rn
CESSPOOL C.P.0
t-•'`
Z
�,
LEACHING CAPACITY (AREA X RATE) %% GAL/DAY
5
:i
Z
RESERVE LEACHING CAPACITY ` F` GAL/DAY
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
NO.
TITLE 5 AND THE TOWN OF /`5 'f �'N RULES AND
REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WITHIN 6e OF FINISHED GRADE
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLt OF
r
WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN
10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
BE MORTARED IN PLACE
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
DEEDED OP ZONING REGULATIONS. OWRlM / APPLICANT IS TO
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
IS TO CALL "DIG -SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE
ZONE
ZONE
INDEX 7, y ( t 1 P%
ADJUST L•
WATER ENCOUNTERED AT ELEV. _
�` 7'' x
DEPTH
HORIZ
TEXTURE
COLOR
MOTT.
OTHER
FINAL SPOT ELEVATION 0 ..
TOTAL ESTIMATED FLOW
37'r
FINAL CONTOUR—LQ0_J --
( 110 GAL/BR./DAY X F SR.) GAL/DAY
SOIL TEST LOCATION
REQUIRED SEPTIC TANK CAPACITY = GAL
UTIUTY POLE -0•-
ACTUAL SIZE OF SEPTIC TANK 1500 GAL
TOWN WATER —W -- W
SOIL CLASSIFICATION �I_
CATCH BASIN�®j
DESIGN PERCOLATION RATE < 5 MIN./IN.
GAS LINE G
EFFLUENT LOADING RATE 0.74 GAL/DAY/S.F.
`
rn
CESSPOOL C.P.0
t-•'`
Z
�,
LEACHING CAPACITY (AREA X RATE) %% GAL/DAY
5
:i
Z
RESERVE LEACHING CAPACITY ` F` GAL/DAY
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
NO.
TITLE 5 AND THE TOWN OF /`5 'f �'N RULES AND
REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WITHIN 6e OF FINISHED GRADE
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLt OF
REVISED
WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN
10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
14 WATER ENCOUNTERED AT I i`' ELEV. _
LEGEND:
DESIGN CALCULATIONS .-
EXISTING SPOT ELEVATION 00,0
NUMBER OF BEDROOMS
EXISTING CONTOUR -00----
GARBAGE DISPOSAL UNIT NO
FINAL SPOT ELEVATION 0 ..
TOTAL ESTIMATED FLOW
37'r
FINAL CONTOUR—LQ0_J --
( 110 GAL/BR./DAY X F SR.) GAL/DAY
SOIL TEST LOCATION
REQUIRED SEPTIC TANK CAPACITY = GAL
UTIUTY POLE -0•-
ACTUAL SIZE OF SEPTIC TANK 1500 GAL
TOWN WATER —W -- W
SOIL CLASSIFICATION �I_
CATCH BASIN�®j
DESIGN PERCOLATION RATE < 5 MIN./IN.
GAS LINE G
EFFLUENT LOADING RATE 0.74 GAL/DAY/S.F.
C.
CLEAN OUT �:-�'��
LEACHING AREA 7 :- SQ. FT.
CESSPOOL C.P.0
t-•'`
Z
�,
LEACHING CAPACITY (AREA X RATE) %% GAL/DAY
SCALE (7
�u`X f' >x e - -/
Z
RESERVE LEACHING CAPACITY ` F` GAL/DAY
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
NO.
TITLE 5 AND THE TOWN OF /`5 'f �'N RULES AND
REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WITHIN 6e OF FINISHED GRADE
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLt OF
REVISED
WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN
10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
BE MORTARED IN PLACE
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
DEEDED OP ZONING REGULATIONS. OWRlM / APPLICANT IS TO
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
IS TO CALL "DIG -SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
IMMEDIATELY. f; &`
8. PARCEL IS IN FLOOD ZONE
9. LOT IS SHOWN ON ASSESSORS MAP f L AS PARCEL `� 4
APPROVED: BOARD OF HEALTH
DATE 7 AGENT
I�
Oltl
(� "% ! ,
"�
PROPOSED SEPTIC DESIGN
FOR
PROJECT LOCATION 7
#J� G/�C=•E%G �G/w�� `/1. r�/!/�H',tJ✓T+f7
-
S14 TETSER ENGINEERING
235 GREAT WESTERN ROAD
P. 0. BOX 713
398-3922 SOUTH DENNIS, MASS. 02660
DATE ` ?!; I Z
SCALE (7
RENSEDJOB
NO.
LOCATION MAP
REVISED
SHEET / OF7']