Loading...
HomeMy WebLinkAbout95 Baker Road - Site & Sewage PlanI CLEAN SAND WASHED STONE FINAL SPOT ELEVATION 30 100.1 VENT FINAL .0CONTOUR I I I I I 4' f7� . , - CAST IRON PIP SO LOCRTION ' (OR EQUAL) MINIMUM PITCH PI TCH 1/4' PER FT. It 9.80 ELEV.- 9 GAS ELEV,- 87t9BAFFLE 777-, �17�z 7 COLOR, MOTT. unuTy POLE. TOWN WATER --w-W—�—W— T r B' LOAMY SAND 1 OYR 5/8 NO R60TS 34"-1327 it I I CATCH BASIN 9 . I GAS LINE 1 OYR 6/6 NO 97,67 10 1 CU. FT. OF CONCRETE ANCHOR CLEAN OUT C. 05 77 —200'; ------ ELEV,l 97.64 t -. t LOCATION _MAP =UTY, CESSPOOL C.P. 0 2'0' ELEV.- LEVEL _9�� 80 Ft *lINTMUM FRom*rrjU­NDATICN rl 'I1Z14/w r 6. sump� 97,54 ELEV,= 97.37 t TOP OF FOUNDATION L_j r 24" DATE OF, s61L:T5ST! 1 rn r— ELEV. 102'so 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE SOIL TEST DO NE BY; R ENGINEERING 10 FT. MINIMUM • VATNESSED BY: A, VON HONE LEGEND: -OBSERVATION HOLE: I ELEV.-100.00 CONCRETE COVERS A' SCHEDULE 40 PVC PIPE M I N. PITCH 1/9' PER rT 2' LAYER OF LOAM AND SEED= 1/8, TO 412, EXIS PNG'SPOT ELEVI oio� no o 1 EXISTING CONTOUR ---- 017 PERCOLATION RATE <2 MIN./INCH AT LLEVA:tON 95.58 - I CLEAN SAND WASHED STONE FINAL SPOT ELEVATION 30 100.1 VENT FINAL .0CONTOUR I I I I I 4' f7� . , - CAST IRON PIP SO LOCRTION ' (OR EQUAL) MINIMUM PITCH PI TCH 1/4' PER FT. It 9.80 ELEV.- 9 GAS ELEV,- 87t9BAFFLE Vl"> I MIDU I lu;ll f L ELM= VO -A f nnv I I I I DEPTH HORIZ[ TEXTURE COLOR, MOTT. unuTy POLE. TOWN WATER --w-W—�—W— T r— 34 B' LOAMY SAND 1 OYR 5/8 NO R60TS 34"-1327 it I I CATCH BASIN 9 . I GAS LINE 1 OYR 6/6 NO 97,67 10 1 CU. FT. OF CONCRETE ANCHOR CLEAN OUT C. 05 77 —200'; ------ ELEV,l 97.64 t -. t LOCATION _MAP I" CESSPOOL C.P. 0 2'0' ELEV.- LEVEL _9�� 17= rl 6. sump� 97,54 ELEV,= 97.37 t L_j r 24" rn r— C= Vl"> I MIDU I lu;ll f L ELM= VO -A f nnv I I I I DEPTH HORIZ[ TEXTURE COLOR, MOTT. OTHER r— 34 B' LOAMY SAND 1 OYR 5/8 NO R60TS 34"-1327 C MEDIUM., SAND 1 OYR 6/6 NO FIRM BA) 0 BPLACED ON SE i LIQUID OUT ET, E TO BE WATER TESTED RED AT 132" ELEV.= 89100 TEE NO WATER,ENCOUNTE EPTH (T.0 BE PLACED ON FIRM BASE) 2 LEACHING CHAMBERS WITH STONE 14 INCHES -13' X 25' TRENCH FORMATION WELL NIA' A FEET 1500 GALLON IN A 5 FEET 19 INCHES l LE ZONE 9 FEET T 24 INCHES SEPTIC TANK FEET 29 INCHES INDEX 6 FEET 34 :NCHESJ SOIL ABSORPTION, ADJUST I 3/4' TO 1 1, SYSTEM <SAS) DESfGN CALCULAT!ONS CLEAN DOUBLE WASHED STONE (H-20) 6.17 NUMBER OF BEDROOMS __3__ FREE OF FINES DtPOSAL UNIT AND SILTS - TOTAL ESTIMATED FLOW 110 GAL./8R./DAY X BR.) 330 GAL./DAY SE3�LAGE., -DISPOSAL SYSTEM PROFILE ACJ:,r REOUIRED SEPTIC TANK CAPACITY 5AL, US{5S PROBABLE WATER TABLE EL:EV.=. ACTUAL SIZE OF SEPTIC TANK _LS_C�2_ GAL, (NOT TO SCALE) SOfL.CLASSIFICATION ElBiERVrD WATER TABLE ELEV.* DESIGN PERCOLATION RATE BOTTOM OF TEST HOLE ELEV.= 89,00 EFFLUENT LOADING RATE rD !U GAL./DAY/S.F. LEACHING AREA 447_,QO So. FT. (13 X'25) + (XS'X 2 X 2) LEACHING CAPACITY -(AREA X RATE) GAL/DAY 447,00 X 0.74 RESERVE LEACHING CAPACITY ZZM GAL/DAY x 92.7 NOTES; 13. ALL UNSUITABLE MATERIAL SHALL BE REMOVE, FROM UNDER ANO 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO O.L.P. FOR A MINIMUM OF 5' AROUND SOIL,A9SORPION SYSTEM AND BE TITLE 5 AND VC TOWN OF, > YARM RULES AND REPLACED PATH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE, LL 2. ACOVERS TO SANITARY UNITS SHALL BE BROUGHT To -GRADE. WITHIN 6" OF FINISHED' E 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE Or WlN THSTANDG H-10 LOADING UNLESS THEY ARE UNDER OR V.THIN lin FO-P 00 N�; -AREAS, P -2m , SHALL 144, USEDT UNDER OROPIVES WITHINPAPKI10 FT, OF Dl�WES ORLOA�-!NfPARKING AREAS.RE 0 F- 1 4. ANY MASONARY UNITS USED TO BRING COVERS TOGRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS SEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO EX OBTAtN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. Z..:.1110 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS. TO CALL "MG -SAFE' AT 1-8138-344-7233 AT LEAST 72 HOURS I PRIOR TO COMMENCING WORK ON SITE. I x - 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS At WELL AS 09 3 EXISTING SEpIlc SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION PROPOSED SOIL ABSORSTION SYSTEM IS TO BE BROUGHT TO THE: ATTENTION OF THE DESIGN ENGINEER x 2 'IMMEDIATELY. •2 H-20 LEACHING CHA.kIBERSIVITH 4' 8. PARCEL IS IN FLOOD ZONE _§L_ 102,6 E SIDES NE ALONG TH AND 2' OF slo r 9. LOT IS SHOWN ON ASSESSORS MAP =4_- AS PARCEL P OF STONE ON THE ENDS. 10. EXISTING SEPTICS ARE TO 19E PUMPED AND REMOVED. 0 ll. TOWN WATERLINE TO BE RE=ROUTED AS SHOWN. v�LLJ L IT OF 5' OVER—EXCAVATION 12. EXISTING HOUSE, SHED, PATIO AND Urr TY CONNECTIONS -ARE TO BE W or yj SEE NOTE 13) "`4 REMOVED. 'TE PROPOSEDfad T A. OPO r c WATER LINE DUMAS PK NAL !Lco� APPROVED: ;BOARD OF ;-HEALTH ELEVATION- 10, ELEVATION- 100.00' ot e UM �(ASSUMEDN pp s"r % s N�, _Dp DATE' % Vp AY x 100.1 AGENT um Ftl PROPOSED SEPTIC DESIGN. FOR 'PHIL CURRAK JI tI 1 m+.,SffEETSER ST sutANER505_ BAY'RD. PROJECT LOCATION: LOT 79 95 BAKER ROAD %�EST YARMOUTH, Iv!A 02673 _EjVGlArEERlATG 4_,� GREAT WESTERN ROAD - , P. 0, BOX 713 SOUTH DENNIS, MASS, L398 392 02660 DATE 11_14-7 00001 REVISED f al -03-,2001 10 05 77 —200'; SHEET 1 OF 1 LOCATION _MAP