Loading...
HomeMy WebLinkAbout67 Balsam Way - Site Plan 3TOP FPIDN. AT EL. 61.0 r.A SYSTEMPROFILE ACCESS COVER TO WITHIN 6" OF FIN. GRADE (NOT TO SCALE) /!- ACCESS COVER (WATERTIGHT) TO 59.0' MINIMUM .75' OF COVER OVER PRECAST / WITHIN 6" OF FIN. GRADE �� RUN PIPE LEVEL FOR FIRST 2' PROPOSED 1500. GALLON SEPTIC 55.75 ,- 56.0' TANK (H- 10 ) GAS 54.50' BAFFLE 54.67'/ SLOPE) 6" CRUSHED STONE OR MECHANICAL COMPACTION. (75.221 [21) MIN DEPTH OF FLOW = a • ( 1.7 y, SLOPE) (-L% SLOPE) TEE SIZES: INLET DEPTH - 10" OUTLET DEPTH = 14 FOUNDATION- 17' SEPTIC TANK a, + 50.3 BENCHMARK: TOP C'.)NC. BOUND AT EL. 55.7' 1 �v' 4 Al Y-% 51.3 +� 46.9(1 1 / TH2 + 64- + +64. 02-132 CP J +.64.3 6y LOT AREA \ 55,093± SQ. FT. ° a' 66 �L'166' s LINK FENGE CKA1 r» 52.2 Ln 1 � 11 / }1153.2 1 /43.9 54.6 G \11 63' MAGNOLIA ROAD 55.8 59.0 rn\0 +60.7 \_6D + 60.4 61.9 /57 + 56.3 7 + 59.6 2% SLOPE REQUIRED OVER SYSTEM 58.0' 2" DOUBLE WASHED PEASTONE �