Loading...
HomeMy WebLinkAbout37.4 - Frame Work Floor System Sheet 2This layout and associated materials list has been prepared based upon project plans andfor Information provided to Falmouth Lumber Inc. It remains the responsibility of the builder, contractor, architect, designer, owner or other affiliated person to review this Information prior to starting construction In order to assure that it is appropriate, accurate and complete. xking nel DO NOT walk on joists until' braced. INTURY MAY RESULT. WARNING Joists are unstable until braced laterally Bracing Includes: " Blocking " Sheathing ! Strut Lines ! Hangers a Rim Board " RIM Joist DO NOT walk on joists that are lying flat. 0 N 10 en A complete TJ-Xpert® framing plan requires the iLevel® Framer's Pocket Guide See iLevel® Framer's Pocket Guide for Product Trademark Information 1 41 15' 4" W 1 14 12' 8" Rm1 DO NOT stack building materials on unsheathed joists. Stack only over beams or walls. WARNMV NOTES. Lack of proper bracing during construction can result in serious accidents. Observe the following guidelines: i m instal ¢,, cud roger n- kd 1. All blocking, hangers, rim boards end rim joists at ih¢ end supports of the T7I _ jo sts ust be completely p Fy 2. Establish a permanent deck (sheathing), nailed to the first 4 feet of joists at the and of the bay or braced end wall. 3. Safety bracing of 1x4 (minimum) must be nailed to a braced end well or sheathed arca and to each joist. 4. Sheathing must be properly nailed to each TJIrjoict before additional loads con be placed on the system. 5, Ends of cantilevers require safety bracing on both the fop and bottom flanges. 6. TdIRjoist flanges must remain stroiaht within 1/2" from true alignment. A Weyerhaeuser, Microllam®, Parallam®, Silent Floor®, Timber5trand0, TJI®, Trus Joist© and iLevelO are registered trademarks of Weyerhaeuser. © 2007 Weyerhaeuser Company. All rights reserved. Printed in the USA NAILING REQUIREMENTS TJIO_joists at bearings: One 8d (2'/2") box nail each side. Drive rails at an angle at least V'2" from end. Blocking ponels,_rim joist or rim board to bearin. late: TJI e blacking panels or rim joist: 10d (3") box nails at 6" o.c. ilevelf rim board Toenail with 10d (3") box nails at 6" o.c. or 16d (312") box nails at 12" o.c. Shear transfer: Connections equivalent to decking nail schedule. Rim board, rim joist or closure to TJI4Djoist: �' w dth or less: One 10d (3") box nai I into each. 2'16'thru 2712"widths: One 16d (31/2") box nail into each flange. 31' z' width. One 10d (3") box nails,one each side of TJIO joist flange. 2x4 minimum_ squash blocks: One 10d (3") box nail into each flange. FrameWorks Floor System TJ Performance Plus Panels are a required component of this Floor System. See TJ Framer's Pocket or FrameWorks guides for required Installation procedures. 28' JOB COMMENTS HARKINS 73 BAXTER AVE YARMOUTH, MA CREATED BY Falmouth Lumber 670 Teaticket Hwy East Falmouth, MA 02536 5085486868 FAX:5084570649 LEVEL COMMENTS SECOND FLOOR jR.�l- Ti-Xpert HANGER LIST - Simpson Strong -Tie Company, IncA Plot ID Qty Product Label Top Nails Face Nails Member Nails Notes H1 2 IUT9 6-N10 2-N10 Hanger Notes: SYMBOL &129ND Point Load'V — Line Load c Area Load O Detail Callout Label (See Framer's Pocket Guide) !Level® FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE TJ.Xpert 8.50 ($685) C6,50 08.50 86.50 P6.50 LEVEL NOTES JOIST AND BEAM LIST HIS-Horkins.SOB Level Name: Plot ID Length Product Plies Qty Al 27' 9 1/2" 9 1/2" TJI 110 joist 1 6 A2 18' 7 7/6" 9 1/2" TTI 110 joist 1 2 A3 15' 7 3/4" 9 1/2" TJI 110.ioist 1 20 A4 15' 2 3/4" 9 1/2" TSI 110 joist 1 6 Ml 4' 3" 13/4" x 9 1/2" 1.9E Microllam LVL 1 1 M2 4' 3" 13/4" x 9 1/2" 1.9E Microllam LVL 2 2 SYMBOL &129ND Point Load'V — Line Load c Area Load O Detail Callout Label (See Framer's Pocket Guide) !Level® FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE TJ.Xpert 8.50 ($685) C6,50 08.50 86.50 P6.50 LEVEL NOTES ACCESSORIES LIST HIS-Horkins.SOB Level Name: Plot ID Length Product Plies Qty Rml 16' 11/4" x 9 1/2" 1.3E Timber5trand LSL 1 10 Bkl 1' 2 1/4" 9 1/2" TTI 110 Blocking Panels 1 12 Shl 4' x B' 3/4" TJ Performance Plus Panels (24" Span Rating) 1 29 Bk, Blocking Panels; Rm, Rim Board Joist Deflection: L/48 SYMBOL &129ND Point Load'V — Line Load c Area Load O Detail Callout Label (See Framer's Pocket Guide) !Level® FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE TJ.Xpert 8.50 ($685) C6,50 08.50 86.50 P6.50 LEVEL NOTES File Name: HIS-Horkins.SOB Level Name: SECOND FLOOR Plotted: 11/10/2009 14:18 Design Status; FIRS FLOOR.... 11/10/200913:59 SECOND FLOOR ... 11/10/2009 13:59 POO ...........11/ 10/2009 13:59 NO :Level design times indicated above provide assurance for proper level stacking. Design N ethodology: ASD Floor Area Loading Is: 40psl Live Load and 12 psf Dead Load Maximu Joist Deflection: L/48 Live Load L/24( Total Load TJ -Pro A atinq Information: Weiqhte Average: 45 Lowest P atinq: 43 Highest atinq: 47 Glued 4 ailed Decking is Required Direct A )plied Ceiling of 1/2" Gypsum is Required Poured Flooring Overlay is Requiredl I X 4 5 appinq is Required Floor Deking: 3/4" TJ Performance Plus Panels (24" Span Ra ing) Normal- C. Spacing = 16"* *Unless oted otherwise Layou Scale: 114" = 1' SYMBOL &129ND Point Load'V — Line Load c Area Load O Detail Callout Label (See Framer's Pocket Guide) !Level® FOR THE TJ-XPERT WARRANTY SEE FRAMER'S POCKET GUIDE TJ.Xpert 8.50 ($685) C6,50 08.50 86.50 P6.50