Loading...
HomeMy WebLinkAbout36.14 - Fire Protection Roof Plan, Ductwork and CO2 PlanGeneral Notes: 1. REFER TO HVAC DRAWINGS FOR DUCTWORK LAYOUT. 2. PROVIDE GALVANIZED STEEL PIPE FOR ALL EXPOSED CO2 PIPING. KEYNOTES OO HEAT DETECTOR TO BE WIRED BACK TO FIRE CONTROL PANEL IN PATHOLOGY LAB. MARK ISSUE DATE DESCRIPTION 8001 01-10-08 BULLETIN #1 CD 06/04/07 CONTRUCTION DOCUMENTS Issue Log CAPE COD HOSPITAL — FIRST FLOOR Key Plan th TRO Jung jBrannen ARCHITECTURE INTERIOR DESIGN ENGINEERING MASTER PLANNING 80 Bridge Street, Newton, Massachusetts 02458 Tel 617.969.9400 Fax 617.527.6753 w tmjungbrannen.ccm Will oB�CAPE COD HOSPITAL v 0 _� 27 PARK STREET, WANNIS, MA 02601 PATHOLOGY LAB RENOVATIONS Drawing Title FIRE PRAOTECTION ROOF PLAN 1 %r Drawn By MLT Commission No. 5077 Approved By MLT Date Issued 06/04/07 Phase / Package Number I Sheet Number Copyright © 2006 TRO JunglBrannen 5077FP3