Loading...
HomeMy WebLinkAbout36.14 - HVAC Fifth Floor Ductwork PlanGeneral Notes: 1. REBALANCE GENERAL EXHAUST AND SPECIAL EXHAUST ACCORDING TO NEW VALUES. Keyed Notes: O PresSURA ROOM PRESSURE MONITOR THROUGH - WALL PRESSURE SENSOR, 20 PresSURA ROOM PRESSURE MONITOR DIGITAL IN' MODULE. X=2(HxW)/(H+W). AIRFLOW STATION SHALL BE I WITH AS MUCH STRAIGHT DUCT RUN UPSTREAM DOWNSTREAM AS POSSIBLE, BUT NO LESS THAN UPSTREAM OF CONTROL DAMPERS, 2X DOWNSTRI TAKE—OFFS AND 1.5X DOWNSTREAM OF VANED E LINEAR SLOT DIFFUSERS SHALL EXTEND FROM W WALL WITH ONLY THE CENTER 4' SECTION BEING THE LENGTH OF INACTIVE SECTION WILL VARY WI DIFFERENT SIZE PATIENT ROOMS AND SHALL BE DETERMINED IN THE FIELD. D INACTIVE SECTIONS OF LINEAR BAR GRILLES IN I`. ROOMS SHALL BE SEALED FROM BEHIND TO PRE CONTAMINATED ROOM AIR FROM ENTERING THE C PLENUM AND TO MAINTAIN THE INTERGRITY OF D NEGATIVE COMPARTMENT. D OFFSET RETURN DUCT IN SHAFT AS NECESSARY. COORDINATE WITH RETURN DUCT ON GROUND FLI D INCORPORATE RETURN GRILLES INTO TOP OF CAC DRAW RETURN AIR OVER SIX COMPAQ CPUs (TYF GRILLES THIS FLOOR). D 15 FEET OF SUPPLY, RETURN AND EXHAUST DUC CLOSEST TO SHAFT SHALL BE 18 GAGE SHEEfME WRAPPED WITH DUCT LAGGING (SOUND STEAL B— OR EQUAL) TYPICAL FOR 5TH AND 6TH FLOORS. ACCESS TO ALL DUCT ACCESS DOORS AND CONT DEVICES. D CONFERENCE ROOM TERMINAL BOXES TO HAVE 3 FEET OF FLEXIBLE DUCTWORK BETWEEN THE TERf BOXES AND SUPPLY DIFFUSSERS (TYPICAL FOR LI AND LEVEL 6 CONFERENCE ROOMS). IARK ISSUE DATE DESCRIPTION 6 02/15/08 BULLETIN 6 2 08/22/07 ADDENDUM 2 D 06/04/07 CONSTRUCTION DOCUMENTS sue Log UGAR BUILDING 5TH & 6TH FLOORS Plan N TRO Jung lBrannen ,RCHITECTURE INTERIOR DESIGN ENGINEERING MASTER PLANNINI 80 Bridge Street, Newton, Massachusetts 02458 Tel 617.%9.9400 Fax 617.527.6753 w trojungbrennen.00m NT INFORMATION / LOGO CAPE CODHOSPITA] i ®_` 27 PARK STREET. HYANNIS, MA 02M (UGAR INPATIENT FLOORS IT -OUT Ing Title VAC rH FLOOR UCTWORK PLAN DCD I Commission No. DR Dote Issued Ie / Package Number I Sheet Number Copyright© 2007 TRO JunglBronnen 2007226