Loading...
HomeMy WebLinkAbout36.14 - HVAC Sixth Floor Ductwork Plansral Notes: REBALANCE GENERAL EXHAUST AND SPECIAL EXHAUST ACCORDING TO NEW VALUES. red Notes: PresSURA ROOM PRESSURE MONITOR THROUGH—THE— WALL PRESSURE SENSOR. PresSURA ROOM PRESSURE MONITOR DIGITAL INTERFACE MODULE. X=2(HxW)/(H+W). AIRFLOW STATION SHALL BE INSTALLED WITH AS MUCH STRAIGHT DUCT RUN UPSTREAM AND DOWNSTREAM AS POSSIBLE, BUT NO LESS THAN 1X UPSTREAM OF CONTROL DAMPERS, 2X DOWNSTREAM OF TAKE—OFFS AND 1.5X DOWNSTREAM OF VANED ELBOWS. LINEAR SLOT DIFFUSERS SHALL EXTEND FROM WALL TO WALL WITH ONLY THE CENTER 4' SECTION BEING ACTIVE. THE LENGTH OF INACTIVE SECTION WILL VARY WITH DIFFERENT SIZE PATIENT ROOMS AND SHALL BE DETERMINED IN THE FIELD. INACTIVE SECTIONS OF LINEAR BAR GRILLES IN ISOLATION ROOMS SHALL BE SEALED FROM BEHIND TO PREVENT CONTAMINATED ROOM AIR FROM ENTERING THE CEILING PLENUM AND TO MAINTAIN THE INTERGRITY OF THE NEGATIVE COMPARTMENT. OFFSET RETURN DUCT IN SHAFT AS NECESSARY. COORDINATE WITH RETURN DUCT ON GROUND FLOOR. INCORPORATE RETURN GRILLES INTO TOP OF CASEWORK TO DRAW RETURN AIR OVER SIX COMPAQ CPUs (TYP-6 GRILLES THIS FLOOR). 15 FEET OF SUPPLY, RETURN AND EXHAUST DUCT CLOSEST TO SHAFT SHALL BE 18 GAGE SHEETMETAL WRAPPED WITH DUCT LAGGING (SOUND STEAL 8-10/QFA-3 OR EQUAL) TYPICAL FOR 5TH AND 6TH FLOORS. PROVIDE ACCESS TO ALL DUCT ACCESS DOORS AND CONTROL DEVICES. ARK ISSUE DATE DESCRIPTION BULLETIN 6 02/15/08 6 2 08/22/07 ADDENDUM 2 D 06/04/07 CONSTRUCTION DOCUMENTS sue Log MUGAR BUILDING 5TH & 6TH FLOORS ;ey Plan n M E NO TRO Jung lBrannen ARCHITECTURE INTERIOR DESIGN ENGINEERING MASTER PLANNING 80 Bridge Street, Newton, Massachusetts 02458 Tel 617.969.9400 Fzc617527.6753 wr✓w]rojungbrannen.c CLIENT INFORMATION / LOGO 50 CAPE COD HOSPITAL 27 PARK STREET, HYANNIS, MA 02801 MUGAR INPATIENT FLOORS FIT -OUT Drawing TO HVAC 6TH FLOOR DUCTWORK PLAN Drawn By DCD I Commission No. 2007226 *mad By DR Date Issued 06/04/07 Phase / Package Number I Sheet Number Copyright©2007 1R0 Aungl9 mren