Loading...
HomeMy WebLinkAbout19 Bass River Parkway - Proposed Septic DesignSASS RIVER PARKWAY x-•9.2 9.3 i SOIL SOIL Q 9.5 / TEST 1 TEST 2 / P I 0 0 r� 18.6 n 1 8.5 \ VENT D. BOX 6060� 4.31• � -� �. � � ; TOP OF FOUNDATION ELEV. = 12.42 ----\ FLOOD ELEV. _I11_00 - 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER FT. 20 FT. MINIMUM FR( 10 FT. MINIMUM FROM SLAB 24" HDCI MANHOLE COVERS ---;n CRAWL SPACE 4" SCHEDULE 40 PVC PIPE MIN, PITCH 1/8" PER FT. 2.93 MAX. CLEAN SAND PORT �M AND SEED 2" LAYER OF '/""To 1/2" WASHED STONE 10.88 MIN. REQUIRED TtON HORIZ FLOW LINE i- 9.93 ELEV. _ 10.00 SLAB ELEV. 9.25 ELEV. = 10.75 _ - TM N.° ELEV. 10.25_ LEVEL 8.60 40 All VINYL LOAMY SAND ELEV. _ GAS ELEV. _ 9.80_ 6" SUMP ELEV. 9.43 _ ° ° ELEV. _ _ - LINER 3-10 11• 40 L. VINYL 0 RDIG 51AB _1D.50_ _ BAFFLE - DISTRIBUTION 10YR5/1 LINERI §7,%05 GAL/DAY i ELEV. _ B LIQUID OUTLET - BOX - -43 L8 y/CF/ CAPAOTrI f7L1RATG14S W17H SW z_ B Op 4 FEET 14 INCHES TE (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED IN AN 11' X 80' X 10 ' 1RFNCH FORMAAON •27 ELEV. _ 5 FEET 6 FEET 19 INCHES 24 INCHES IF MORE THAN ONE OUTLET 1500 GALLON FIRM BASE) T1 ^ WELL MIW 9 SOIL ABSORPTION 8 34 INCHES SEPTIC TANK (TO BE PLACED ON ZONE A 8.0 5 04) FEET 3/4" TO 1 1/2" CLEANSYSTEM (SAS) INDEX (H-20) DOUBLE WASHED STONE - - FREE OF FINES & SILT 0 ADJUST 1.50 (H-2 ) , / p0 / 2 SEWAGE DISPOSAL SYSTEM PROFILE TABLE ELEV. - OBSERVED WATER TAB EUSGS PROBABLEATER (6/21/04) ELEV. = -IM NOT TO SCALE BOTTOM OF TEST HOLE ELEV. = =0.5Q_ SOIL TEST °G, DESIGN CALCULATIONS DATE OF SOIL TEST JUNE 2004 5 (6') t - SOIL TEST DONE BY SWEETSER ENGINEERING - NUMBER OF. BEDROOMS - 5 • WITNESSED BY _@-Sze ILF_FIY____J GARBAGE DISPOSAL UNIT NO _ 03SOVA110N OL HE 1 ELEV.=-_9.50 00SMAIION HOLE 2 ELEV.--2--M TOTAL ESTIMATED FLOW ( 110 GAL./BR./DAY X _S- DR.) _3.54_ CAL./DAY RATE < 2 MIN /INCH AT 72 INCHES PERCOLATION RATE -<2 - MIN./INCH IN C HORIZON REQUIRED SEPTIC TANK CAPACITY -1100_ GAL o HORIZ � P MOTT. OTHER 0-3 8. LOAMY SAND t0YR4/2 P E 3 LIMIT 01= 5' GA G Sp 3-10 11• 40 L. VINYL 0 RDIG 51AB LOAMY SAND 10YR5/1 LINERI §7,%05 GAL/DAY y B LOAMY SAND 10YR4/6 TITLE 5 AND THE TOWN'S RULES AND 8.3 i j 1500 GALLON - 1162 i SEP C'TANK a 8 � � ) 1p • 8.1 .4 r' 777:7 SLUNG , / p0 / 2 tt PRp5pBsz OCµ5 t 10 t � IV (6') t a 5 • o 5.Y 1-74 8.4 ` •x,8.6 Pp .16X24 . - 1 ' •a 11 J( Spa 1 1,250. a APRON I y0 00 / a 1 N LOT J LEGEND: ` 20,605 f S.F. EXISTING SPOT ELEVATION x0.0 1' EXISTING CONTOUR ----00---- BENCryH APr ( t / FINAL SPOT ELEVATION 00 61 0 ctwc 80 mi ar✓�maw 7.0 /I 7.4 FINAL CONTOUR (Nsvn) / , g0.00 SOIL TEST LOCATION , UTILITY POLE cIcb TOWN. WATER ®W / ,��1i�r•6 T f CATH V�) G TREE 5 GASCLINEASM C. CESSPOOL _��VE CLEANOUT I PERCOLA___- ----- DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-3 A LOAMY SAND t0YR4/2 NO 3-10 E LOAMY SAND 10YR5/1 RESERVE LEACHING CAPACITY §7,%05 GAL/DAY 10-28 B LOAMY SAND 10YR4/6 TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE 28-120 C MEDIUM SAND 2.5Y7/6 WITHIN 6" OF FINISHED GRADE. WATER ENCOUNTERED AT __32_ EL?v. = _1�.3_ DEPTH TO TEXTURE COLOR MOTT. OTHER 0-2 A LOAMY SAND 10YR4/2 NO 2-9 E LOAMY SAND 10YR5/1 RESERVE LEACHING CAPACITY §7,%05 GAL/DAY 9-27 B LOAMY SAND 10YR4/6 TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE 27-120 C MEDIUM SAND 2.5Y7/6 WITHIN 6" OF FINISHED GRADE. ACTUAL SIZE OF SEPTIC TANK 1500 GAL. SOIL CLASSIFICATION _I - DESIGN PERCOLATION RATE MIN./IN. EFFLUENT LOADING RATE_4,P}_ GAL./DAY/S.F. LEACHING AREA 778_33 S0. FT. (11X60)+(71X2X10/12) LEACHING CAPACITY (AREA X RATE) -5754$ GAL./DAY 778.33 X 0.74 RESERVE LEACHING CAPACITY §7,%05 GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3 ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WATER ENCOUNTERED AT - 92_- ELEV. _ _L83_ WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED -UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND 5. NO DETERMINATION HAS BEEN 'MADE AS TO COMPLIANCE WITH FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS. TO REPLACED WITH SAND AS SPECIFIED. IN 310 CMR 15.255:(3). OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6 11. ALL EXISTING UTILITIES ARE TO BE DISCONNECTED, REMOVED . UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION AND REPLACED WITH NEW SERVICES. CONTRACTOR IS U CALL 'DIG -SAFE' NG WOR344-7233 12. EXISTING SEPTIC SYSTEM IS TO BE PUMPED AND REMOVED ALONG AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON .SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL WITH ANY POLLUTED SOILS. 13. A 40 ML VINYL LINER IS TO BE INSTALLED WHERE SHOWN. AS SITE CONDITIONS PRIOR TO COMMENCING WORK SITE. ANY VARIATION 15 TO BE BROUGHT ?0 THE ATTENTIOIO N OF THE DESIGN ENGINEER IMMEDIATELY. DI EL 11,0) 8. PARCEL IS IN FLOOD ZONE _ 1 9. LOT IS SHOWN ON ASSESSORS MAP ---M--- AS PARCEL -2K 'i Nn, AY9nE5n1ICM. QnADn AC' Wr-A1 TI -I