Loading...
HomeMy WebLinkAbout2 Bowen Lane Sewage Disposal700 OFFOUNDATfON ELEV. . 102.00_ 5.50 SLAB ELEV. _! r- LEGEND: - SOIL'. TEST -^ 20 FT, f9NIAk'Jh1 FROt! CE -LAR OR CRAN'� 5) ACE DATE OF SCIL TEST !LQA NX!l 9,2014 1C FT. ROV CE FROM SLAB SCI! TEST DONE BY ah111SER ELGIN -RING 10 FT. MINIVJIA _ i. CLEAN SAND WTNESSED By _Je_B L90_.:._' - j RSLOAAND SEED OBSERVATION H TE !NSPECT;GN PORT OLE 1 f 4" SCH_DiLE 40 PVC PPE C2 'G At - 95 9 COVE MIN PITCH 1/8" PER FT. \ 2 LAYER CF PERCOLA'ION RATE _<_c2 MIN./INCy AT 44 LACHES 0 1 T o• 4" CAST IRON PIPE (OR EQUAL) MIN!M'JM - PITCH 1/4" PER FT. -ELEV. - -96.50 - ELEV. /e 1 I ` WAS41r0 S ONE C rL-- R .FABPIC VENT A 98:80 MAX. p6,55 MIN. NOT REQUIRED 1 I[ rl0'7 TEE , LEVELERS i DEPTH HOR2 1 TTFXTL14E ICOLCR MOTT. O'HER MOTT. OTHER 0-5 AA LOAMY SAND 1OYR3/1 NO ,ROOTS _ 5-100 E MEDUM SANDS 10YR7/1 ETUCKET ROAD 0: BOX 713 'DENN'S, MASS, 02665. -� TESTHOLES BY RICK Jt,DD. R.S. 11/13/20 2 FROM A PLAN BY DOWN CAPE . "DAMP" AT ELEVATION LOAMY SAND 10186/ ROOTS 4 - -T 20-132"'C MEDUM LOAM 2.5Y7/4 955 95,E 94.23 95.80 84:9• NO WATER ENCOUNTERED AT 132 _ ELE . _ 84.9 _95.80 Ii�� �! LF' EL 0a o _� + l 95.3 c 10" a E_E,;- 84.47` ODSERVA I ION 'HOLE 2 EL 'J.=-- �_ _J GAS y 9x47 8" SUMP.LELEV. 5.3Q_ ai a r m a 0 .BAFFLE ELEV. _ -.r �''[� - DIS (itI�UTION -ELE _ o u a s c a° o c° 1•_ _93.30- .-- ooa 0.oa ° ° a° 0 0 0 4 a _ ° o °0°0 a a °o ° 0 0 00 ° a .ELEb` - BOX -8 - 4 HIGH CAPACITY INFILTRATORS WTH - (TO BE PLACED ON FIRM BASE) LTO BE WATER TESTED T STO!vE IN AN p�[ 1540 GALLON i= M03c TT1AN ONE CU -LE' 110 X 38' X 24" TRENCH FORVATION q 5 I6-0 WELL MIY DEPTH I HOR1 I TEXTURE ICOLOR TANK (T EF MOTT. O'HER 0-� �A ` LOAMY SAN- 1E: MED -UM SAND 10YR3/ -!� ^ NO ROOTS 1DYR7/ - 8-20" B LOAMY SAND- 20-1.20" C ~MEDIUM LOAM 10`R6/ 5 ROOTS SYSTEM (SAS ETUCKET ROAD 0: BOX 713 'DENN'S, MASS, 02665. SEPTIC TANK (T EF PLACED ON FIRM BASET SOIL - ABSORPTION -!� ^ I ZONE B INDEX 9.2 NO WATER ENCOUNTERED AT 1200. :ELE _ BS'.3 IC LDC. 2 B0 fiPrlY iJt9ltida, ..u�+ 1' 12QST YA OU L" MASS:. , 3/4" TO 1 1/2" CLAN DOUBLE WAS -TED STONE SYSTEM (SAS ETUCKET ROAD 0: BOX 713 'DENN'S, MASS, 02665. _ .11/2002 4 AD UST 3.5 TESTHOLES BY RICK Jt,DD. R.S. 11/13/20 2 FROM A PLAN BY DOWN CAPE . "DAMP" AT ELEVATION SCALE 1 „ _ 20' FREE OF F- -NES &SILT 4 l 1 - ENGINEERING, INC. DATED 4/21(2003 Ir.01 ATE SOILS - G h JOB N0. 7511-00 1 DEC. 10, 2014 USGS PROBABLE WA ER TABLE ELE%V-.- _.BB•L_ 84.8 (15.2 BELOW H= IN RCAD) " SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE ;11/13/2002) ELEV. =DESIGN CALC ULA ONS NOT TO SCALE BCTTO`` OF TEST HOLE ELEV. _ _84,4__ NUMBER OF BEDROOVS 4_ A : GARBAGE DISPOSAL UNIT 1vTO TOTAL ESTIMATED FLOW ( 110 GAL/BR./DAY X ..4.. BR.) --442 GAL RECuIRED SEPTIC TANK CAPACITY _8�3Q„ GAL. ACTUAL SIZE OF SEPTIC TANK 10 GAL SOIL CLASS!FICA iION 1_ DESIGN PERCOLATION RATE 5_$. MIN'/]N. _. EFFLUENT LOADING RATE 8 A- GAL.FJDAY/S.F. LEACHING AREA LEACHING (AREA X RATE)', -45&M GAT..%DAY 614.00 X 0.74 1V RESERVE LEACH':NG CAPACITY GA GAL./DAY` - I NOTES: 1 1. ALL WORKMANSHIP AND MATERIALS f,HALL CONFORM TO D.E.P. ' ' TITLE 5 AND THE TOWN'S RULES AND REGULATONS FOR o I THE- SUBSURFACE DISPOSAL, OF SEW GE. ' 2. ALL. COVERS T^ SANITARY UNI TS SI-,. ALL BE BROUGHT TO 8' 0 WITHIN 6" OF FINISHED G?ADE. \\ S01_ 3. ALL COA±PONENITS OF THF SANITARY SYSTEM SHALL BE CAPABLE OF TEST 2 WITHSTANDING H=TO LOA .NG U'NLE S THEY ARE UNDER OR VTHIJ • 94.3 A� -. 10 FT. OF DRIVES OR PARKING ARE S, N.-20 LOADING SHALL BE • fid,; � 1� ` USED UNDER CR AIT -41N 10 FT. OF RIVES OR PARKING AREAS. 1500 GALLON A �'- *Ix O 4.. ANY MASONARY UNITS U'SED'TO ER G COVERS TO GRACE SHALL - S_ acPTl:. \ o \ SCI G - r rr,^+ 1 8E-MORTARcm IN DLA -a --- put 9� TEST 1 r "J 5. N0'DETERMINATION HAS BEEN MADE AS TO COMPLIANCE YPTN DEEDED OR ZONING REGULATIONS. CWNER / APP-ICANT IS TO NN PSK o 20 OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. LOT 12 95,0' �0 0 �' \ 9°\ 1 6 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR 1C !l 'S6 sr1 IS TO CALL "DIG -SAFE" AT 1-888- 44-7233 AT LEAST 72 HOUR_ 9, 56 1 ., S.F.. s Q .• PRIOR TC COMMENCING WORK ON 57E. O \ 't 7: CONTRACTOR IS iC VERIFY' GRADES AND `ELEVATIONS AS NE_L AS Is SITE CONDITIONS PRIOR TO COMMEN NG WORK ON-SITE. ANY VARiATON �c�Cti jS:TO BE BROuGtiT TO THE AT-14TI)INN OF THE DESIGN ENGINEER 8. PARCEL IS IN c \ iM1v1`CIATELY. • 95.2 • 9 /tic Cn 41 d \\ 9. LOT IS SHDY'`N ON ASSESSORS MA 3B AS PARTE 40 ,0 6.5 \ \ 'tk J 10. ALL UNSU'TABLE MATERIAL SHALL E REMOVED FROM UNDER AND FOR W' A 'WN,JM OF 5 AROUND SOIL, A5 ORPTION SYSTEM AND BE REPLACED r`/t WTH SAND AS S'ECIFIED ItJ 310 C R '5.255 (3). �9N UMI RPGS lath HealthDepartr...;t i v� �\ �3 ;''xis=�31� AP ovEn_ APPROVED: OA o�RD OF' HEALTH J 'G �, \� ♦ p'"'fyi� ��, 1n A » .• ! ame Date 99.E - �! . t \ 0.DAT / DAT AGEN "c T 97.7 � I ^ o� ,� 0 1GaC • 99.3 ncr+nnv- raaar I psr�aJ I / f I EXISTING S30T ELEVATION 0.0.0 EX'ST1NC CONTOUR ----v,.^---- FINAL SPOT ELEVATON 00. FINAL CONTOUR S01'_ TEST LOCATION UTILITY POLE -0- TOWN WATER -6W�W CATCH BASIN®� GAS UNE CLEAN 00 _13- CESSPOOL C.P. 0 56.9 i 1 PROPOSED DAVENPOR7 SEPTIC DESIC2d FOR REALTY TRUST 117 -EST YARMOUM _103S. 1 RoaEF�A r 4-e \ m 6 0 \\\ N ' LOCUS ,P � RC'JTE 28 LDC. 2 B0 fiPrlY iJt9ltida, ..u�+ 1' 12QST YA OU L" MASS:. , as7:�ta1 203 506- P. 385-6900 SOUTH ETUCKET ROAD 0: BOX 713 'DENN'S, MASS, 02665. SCALE 1 „ _ 20' DATE ENOV. 19, 20i 4 G h JOB N0. 7511-00 1 DEC. 10, 2014 } SHEET 1 ' ' OF -1 62014 SWEETSER ENGINEER!I LOCATION MAP REV' SA'"DWC