Loading...
HomeMy WebLinkAbout34.228 - Sewage Disposal System DesignTYPICAL SEPTIC TANK: 1,500 GALLON TYPICAL DISTRIBUTION BOX: SOIL TEST PIT DATA: NOT To SCALE NOT TO SCALE 5. INLET AND OUTLET TEES TO BE CAST IRON, NO. OF OUTLETS: 5 NOTES: 1. SEPTIC TANK SHALL BE STEEL SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. TEST PIT 98_1 REINFORCED CONCRETE. TEES TO BE CENTERED UNDER MANHOLE COVER. GRD. EL. 11.0 INDICATES INDICATES 2. SEPTIC TANK TO WITHSTAND H-10 LOADING FINISHED GRADE INDICATES 6. RECOMMENDED ANUFACTURER-ROTON00 OR. GW. EL. 7'0 PERU. OBSERVED �- ESTIMATED UNLESS UNDER PAVEMENT, DRIVES OR APPROVED EQUAL NOTES: 0' - SEASONAL HIGH TRAVELED WAYS WHEREIN H-20 LOADING 2" WALLS 10" 16" m Ap, LOAMY SAND 2.5Y 4/1 DRY, FRIABLE Bw, SAND, 10YR 5/8 FRIABLE, MED. SAND C, SAND, 2.5Y 5/4- LOOSE /4LOOSE MED TO FINE SAND, NO STONES 31"�- 48"�_ TEST - GROUND WATER GROUND WATER SHALL APPLY. . 1=12.20 REMOVABLE COVER I NEW TOP FOUNDATION i. DIST. BOX WITHSTAND LOADING BE SET LEVEL 2' 3. ALL PIPE CONNECTIONS AND CONCRETE EL= 15.0± (BRING TO FINISH GRADE) FOR MIN. m , DRIVES OR UNLESS UNDER PAVEMENT, DRI 40 OR EQUAL CONSTRUCTION SHALL BE WATERTIGHT. a2" HIGH MIN. 2" P%CBARRR TRAVELED WAYS WHEREIN H-20 LOADING - 4. FILL ALL UNUSED KNOCKOUTS WITH 6. REPLACE WITH CLEAN WASHED SAND o 4" PVCd/^�� �d� SHALL APPLY. DATE: 9/24/98 MORTAR. 2-24" DIA C.I. MIN.) MANHOLE COVERS <5 % OF No. 4 SIEVE SHALL j x 15" 2. PROVIDE INLET TEE OR BAFFLE WHERE 3/4"-1 1/2" DOUBLE WASHED STONE TEE TO BE UNDER BROUG ISH T TO FINISH GRADE - ENGINEER SHALL LOCATE AND STAKE FOOTING a, T SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR TEST BY: M.H. OPENING 12" IN. 6" 5,5" OUTLETS t 8" IN PUMPED SYSTEM. THE BSC GROUP, INC. WITNESSED BY: 28" AMY VON HONE PERC. RATE: < 2 MIN./INCH 46" SOIL EVALUATOR JAMES ES W BURKE SOIL CLASS: I L. T. A. R. 0.74 G.P.D./SQ.FT. 3 / %--, a's" *4 �� atetoe oatof T3. FIRST TWO FEET OF PIPE OUT OF DIST. RAISE M.H W//.4d/,G�//� " '*//,C 4" $a,'��a� gaen gs`�,� �q�ae,e4° 'a L- BOX TO BE LAID LEVEL. 10'-6" SEWER BRICK<.: •= 2"d: • ' d '� BOTTOM ON LEVEL10'-0" & MORTAR 12"aSTABLE BASE 6" MIN. 3/4" TO4. RECOMMENDED MANUFACTURER-ROTONDO NORM L WATER LEVE CROSS-SECTION 1 1/2' CRUSHED OR APPROVED EQUAL. NOTE: STONE BASE s 3" _ �c PRECAST SEPTIC TANK - - 10" 2D T. ADJUSTMENT PER WELL #MIW29 = 1.4' 17'` INLET TE e 4'-9" AS OF 8/31/98, ADJUSTED ELEVATION = 8.4' - - 4,-6" 5'-4" ADJUSTMENT, = 7.7' S-2. 4'-Q" MIN. ouW E�NDON d 15 1/2 - UID 1 2 ADJU z USE - _ - EP / LI U D D F Q O• O )', �S TEE O I DATUM: VERTICAL DATUM: N.G.V.D. BENCH MARK: TOP OF WOODEN POST = 14.17' PROFILE: NOT TO SCALE or EL= 15.8 . 1=12.20 OUTLETS TO 1=12.40 NEW TOP FOUNDATION MANHOLES & COVERS AS REQUIRED BE SET LEVEL 2' Z EL= 15.0± (BRING TO FINISH GRADE) FOR MIN. m < > 40 OR EQUAL 14.D± a2" HIGH MIN. 4" PVC (PERF) o ALL TOPSOIL, SUBSOIL AND OTHER €al"6 6. REPLACE WITH CLEAN WASHED SAND o 4" PVCd/^�� �d� _ 2"-1 8"-3 8' DOUBLE WASHED CEMENT SCH 40 4"PV CH40 <5 % OF No. 4 SIEVE SHALL z m UNIFORMITY COEFFICIENT ® No. 4 FINISH GRADE �� 3/4"-1 1/2" DOUBLE WASHED STONE INSPECTION #2 - ENGINEER SHALL LOCATE AND STAKE FOOTING OF RETAINING WALL PRIOR I-1 00 1=12.65 -3 1=12.57 6" 1= 2.33 Z w . 1=12.20 I=12.8 1=12.40 z CONSTRUCTION OF THE SEWAGE 1,500 GALLON 1.500 BY THE YARMOUTH BOARD OF HEALTH. o < BOTTOM EL= PRECAST CONCRETE 5 OUTLET < > 40 OR EQUAL SEPTIC TANK DIST. BOX HIGH WATER EL.=7.7 DICAL RETAINING WALL: ALL TOPSOIL, SUBSOIL AND OTHER €al"6 6. REPLACE WITH CLEAN WASHED SAND 4,000 PSI CONFORMING TO THE FOLLOWING SIEVE ANALYSIS: .-, CEMENT CONCRETE \ <5 % OF No. 4 SIEVE SHALL I 10 I AT 28 -DAY. � UNIFORMITY COEFFICIENT ® No. 4 FINISH GRADE �� I I INSPECTION #2 2" CL. #7 @ 12" O.C. - 3" x 6" CONT. KEY #6 ® 10" E.W. � 3" CL. EXPOSED FACE SHALL. BE -#4®18" VERTICALLY STRIATED OR FLUTED TO PREVENT GRAFFITI (1"'DEEP E.W. BY 2" WIDE MIN.) 4'-8" MAX. 2" CL. EXISTING GROUND iM I N 4'-1 12" 6" LES SHALL NO E PROVIDED. BREAKOUT HQBARRIER BDETAIL NOT TO SCALE 4" LOAM ELEV. = 14.0± 3 4" LOAM & SEED 1 9" COMMON FILL 4 6" 0 ELEV. = 12.7terse! 12" 2" PEASTONE O -� . T FRS�I'F/r' pVFFO 6" OF 3/4" - 1 1/2" STONE C 6 ELEV. = 11.7 DRQ/Fj� N I CLEAN WASHED SAND o . IELEV. = 9.7 PLAN VIEW ��BI TOT c BOTTOM N LEVEL STABLE BASE O:V$ d C.�Y/h _ N 7 1/2 6" MIN. 3/4" TO / CRO S -SECTION VIEW //fid\ PLAN VIEW 1 1/2" STONE 5. ALL PIPE CONNECTIONS AND CONCRETE CONSTRUCTION SHALL BE WATERTIGHT. 6. FIT BREAKOUT BARRIER SNUG AROUND - X INF D BOX AND USE EPDXY RES OR WATER TIGHT SEAL. 7. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. I I \\ I \ ! TOP OF WOOD POST EL. / \ 14.17' NGVD I \ BREEZY p OINT�-- --� � ROAD W.G. � o PRIVATELAN \ O 40' TOWN LAYOUT .... � I t NTS AND SCHEDULE:�\ J TYPICAL LEACHING FIELD: NOT TO SCALE 36" MAX .COVER FINISHED GRADE 1^ Ono�tfa4eett-' eaD�e4Kt-a><° a 'l nO�.a1 Ofi�t SnP�at"4fO9�t P�a ,9fOtOY •°O.I \// CAP ENDS �V�-D4PVC- � of Po f a 0 o enQ°"TfPQof6' DEPTH/;r Ot OLL O'{ \ \ LEVEL BOTTOM \ r 25' PROFILE 36" MAX. - 12" MIN. COVER 2% MIN. FINISH GRADE 4" MIN. LOAM & SEED 3d MAXIMUM INN v \ J .,.. o+ac o f do��� o♦ a ¢� o t,. a .. o t� T �ip• 6• typo °t:W6 i"W°o r RP Ufiy a °tea 2" 'MIN. OF 1/8" TO r ..° t.,°o t <hepvr ° t ., eft• °o to°o t aPa °.Pa°- TPP 1/2" WASHED STONE I _ S I _ 3' 1 3' I 3' I 3' T (� T _ -3/4" TO 1 1/2" DOUBLE CROSS-SECTION WASHED ST;NE (NO FINES) INVERT ELEVATIONS: PROPOSED FINISHED FLOOR 15.8 4" INVERT AT BUILDING (PROPOSED) 13.00 (DWELLING TO RAISED 3.5') 4" INVERT AT SEPTIC TANK (IN) 12.80 4" INVERT AT SEPTIC TANK (OUT) 12.65 4" INVERT AT DIST. BOX (IN) 12.57 4" INVERT AT DIST. BOX (OUT) 12.40 INVERTS AT LEACHING FACILITY: 4" INVERT AT BEGINNING OF LEACHING FIELD 12.33 4" INVERT AT END OF LEACHING FIELD 12.20 ELEVATION AT BOTTOM OF LEACHING FIELD 11.7 ESTIMATED GROUNDWATER ELEVATION 7.7 GROUNDWATER ADJUSTED PER WELL #MIW 29, DATED 8/20/98 DESIGN CRI I Rip.%. DESIGN FLOW: ,_3- BEDROOMS AT110G.P.B./D 330 G.P.D. INSTALLATION OF THE SEWAGE DISPOSAL SYSTEM SHALL BEI SPECTED BY THE DESIGN \ 2. 12/3/98 3 -BEDROOM GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE ENGINEER AND BY THE YARMOUTH BOARD OF HEALTH. MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULA110i•iS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL T" INSPECTION # 1 _ REQUIRED - ENGINEER SHALL INSPECT WHEN THE EXCAVATION IS COMPLETE. \ ALL TOPSOIL, SUBSOIL AND OTHER €al"6 6. REPLACE WITH CLEAN WASHED SAND CONCRETE RETAINING WALL CONFORMING TO THE FOLLOWING SIEVE ANALYSIS: 10% (MAX) BY WT. SHALL PASS No. 50 SIEVE <10 % OF No. 4 SIEVE SHALL \ <5 % OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFFICIENT ® No. 4 _ TOP OF WALL - 13.0 7. EXISTING UTILITIES WHERE SHOWN INSPECTION #2 - ENGINEER SHALL LOCATE AND STAKE FOOTING OF RETAINING WALL PRIOR :a. .= AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. iG (SEE DETAIL) THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-800-322-4844. THE POURING.TO THEIR ACCURACY OR THAT ALL - UTILITIES AND SUBSURFACE STRUCTURES ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE '. BUFFER LOCATION AND INVERTS OF UTILITIES INSPECTION #3 - ENGINEER SHALL INSPECT FOOTING LOCATION AND REBAR PRIOR TO WATER SERVICE TO h 4� S. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. POURING OF WALL. < A GARBAGE GRINDER IS NOT. BE RELOCATED AND 1`I RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING INSPECTION #4 -ENGINEER SHALL INSPECT WHEN CLEAN FILLSLEEVED WITH A PERCOLATION WITH WATER TIGHT PIPING,, I s ED..L f . ~' The BSCL Group, Inc. " �A RATE OF LESS THAN TWO (2) MINUTES PE INCH HAS BEEN 293 WASHINGTON STREET I (781) 659-7981 PROJECT TITLE: ' ,/ SYSTEM DESIGN 108 BREEZY POINT ROAD PROPERLY DEPOSITED. - 5 LIMIT. OF EXCAVATION---' PREPARED FO 108 BREEZY POINT ROAD S. YARMOUTH, MA 02664 INSPECTION #5 - ENGINEER SHALL INSPECT THE COMPONENT3 OF THE SEPTIC SYSTEM BREAKOUT BARRIER DWG NO. 5113-02 SHEET 1 OF 1 JOB NO. 4-8021.00 AND THE BREAKOUT BARRIER WHEN THEY AVE BEEN INSTALLED.1 1500 GAL SEPTIC TANK THE DESIGN ENGINEER SHALL CERTIFY TO THE YARMOUTH HE LTH DEPARTMENT THAT a •,\ # 106 THE RETAINING WALL, SEPTIC SYSTEM, AND BREAKOUT BARRI R HAVE BEEN INSTALLED ACCORDING TO THE ENGINEERED PLAN. cj EROSION CONTROL # 110 NO"' BARRIER sk EXISTING CESSPOOL TO BE PUMPED, FILLED /WITH CGNn 4Nn ARGNn LOCAL UPGRADE APPROVAL REQUESTED: TITLE 5 VARIANCES: 1. 310 CMR 15.211(1): MINIMUM SETBACK DISTANCES A. A SETBACK OF 6' FROM THE PROPERTY LINE TO THE DOE OF THE SOIL ABSORPTION SYSTEM. B. A VARIANCE IS REQUESTED TO ALLOW A SETBACK OF ' FROM THE ABSORPTION FIELD TO THE WATER LINE. 2. 310 CMR 15.212: DEPTH TO GROUNDWATER PLAN VIEW - `'"ASTAL BANK A VARIANCE IS REQUESTED TO ALLOW 4' OF SEPARATION BETWEEN THE BOTTOM OF THE STONE UNDERLYING THE�{ MAP 29 PARCEL T44 LEACHING FIELD AND THE HIGH GROUNDWATER, ELEVATION SCALE: 1 20 FEET 47,400 S.F. UPLAND 6,817 S.F. 0 10. 20 40 FT, REQUIRED SEPTIC TANK: 200% @ 330 GPD 660 GAL. SEPTIC TANK PROVIDED: = 1500 GAL. SIZE OF LEACHING FACILITY REQUIRED: DESIGN PERC. RATE: 5 MIN./ INCH LONG TERM APPL. RATE 0.74 G.P.D/S.F. 330/0.74 = 446 S.F. SIZE OF LEACHING FACILITY PROVIDED: 25' X 18' LEACHING FIELD 25' X 18' = 450 S.F. > 446 S.F. 450 S.F. X 0.74 GPD/S.F. = 333 GPD LOCUS PLAN: NO SCALE 1 °8 WILLOW ST. o: LOCUS / m� REVISIONS NO. DATE DESCRIPTION 1. 10/26/98 BOH REVISIONS 2. 12/3/98 3 -BEDROOM GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULA110i•iS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 1 F 50 FT 0 THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE. ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL 6. REPLACE WITH CLEAN WASHED SAND OR OTHER CLEAN GRANULAR SOILS CONFORMING TO THE FOLLOWING SIEVE ANALYSIS: 10% (MAX) BY WT. SHALL PASS No. 50 SIEVE <10 % OF No. 4 SIEVE SHALL PASS No. 100 <5 % OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFFICIENT ® No. 4 SIEVE </=6.0 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE' AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-800-322-4844. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL - UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE '. CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. S. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. < A GARBAGE GRINDER IS NOT. RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. ED..L f . The BSCL Group, Inc. " �A +3 k 293 WASHINGTON STREET NORWELL, MA 02061 (781) 659-7981 PROJECT TITLE: SEWAGE DISPOSAL SYSTEM DESIGN 108 BREEZY POINT ROAD SOUTH YARMOUTH O JAMESW BURKE CIIAL No.38418 PREPARED FO LYNN & PETER LANDRY 108 BREEZY POINT ROAD S. YARMOUTH, MA 02664 DATE: SEPTEMBER 24, 1998 COMP./DESIGN: J. BURKE CHECK: J. BURKE DRAWN: PH/NR/MM FILE NO. 8021SEP2.DWG DWG NO. 5113-02 SHEET 1 OF 1 JOB NO. 4-8021.00 l /7 -S�_ (1595 )