Loading...
HomeMy WebLinkAbout96.35 - Title 5 Site PlanTOP FNDN. AT EL. 43.0, SYSTEM PROFILE ACCESS COVER TO WITHIN 6" OF RNOT TO SCALE)N. GRADE ( //--- ACCESS COVER (WATERTIG T) TO 41.0' MINIMUM .75' OF COVLK ? Pr _AST / WITHIN 6" OF FIN. GRADE 2" DOUBLE WASHED PEASTONE RUN PIPE LEVEL 40.0 FOR FIRST 2' PROPOSED X00 GALLON SEPTIC 3 75 TEE 39.0' TANK (H- 10 ) GAS36.11' a o 0 0 0 0 171 o BAFFLE 36.28' o 36.0' O F-1EDo 0 D O O ED ED ED CD El (_i_0% AN % SLOPE) �6" CRUSHED STONE OR MECHICAL$ 2' Cj O I� L] COMPACTION. (15.221 (21) oo - DEPTH OF FLOW 4 ( 14 % SLOPE) (_2 7 SLOPE) 3/4" TO 1 1/2 DOUBLE WASHED STONE TEE SIZES: INLET DEPTH = 10" OUTLET DEPTH 14" LEACHhNG FOUNDATION— 10' SEPTIC TANK 17' D' BO 13' FACILITY t LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION -�- 100 PROPOSED CONTOUR 100 EXISTING CONTOUR 2% SLOPE REQUIRED OVER SYSTEM TEST HOLE LOGS PROVIDE INSPECTION PORT ENGINEER: LISA LYONS, RS 39.0' WITNESS: DAVE FLAHERTY DATE: 2/11/04 3' MAX. PERC. RATE _ < 2 MIN/INCH 36.83' CLASS I SOILS P# 34.0' 6.2' 27.8' 0" Q 39 5 p" Q 39.2' 0 0 11 4" A/E 1 'Pp µ1t1- Rp $a�vt Loess cgo2 dPSµ1N LOCATION MAP NTS LS A 6., 10YR 5/2 LS ASSESSORS MAP 106 PARCEL P/0 26 B 8., IOYR 5/2 YARD SETBACKS: LSB FRONT = 25' SIDE = 12' CLUSTER SU DIVISION 29 REAR = 20 10YR 5/4 S 37 1' t 0Yf 5/6 ' Cl 31 36.6 PLAN REF. - 469/97 ClF ONE: C CS CS 2.5Y 6/6 p 1 L 11, 42 2/5Y 66 59' / R 2004 C2 C2 ay s lCU v I 1 HIGH PT. PERC MS MS / 2/5Y 6/42.5Y 6/4 TOP FNDN TO BE AT SAME ELEVATION AS HIGH POINT IN ROAD 140" 27.8' 132" 28.2' (VARIANCE OF 2' REQUESTED) NO WATER ENCOUNTERED NOTES' 1. DATUM IS ASSUMED SEPTIC DESIGN: (GARBAGE DISPOSER IS N Q T AI r 0W'Fr, ,AVAILABLE DRAINAGE ESM oa . \ � � / 2. MUNICIPAL WATER IS SLOPE \ �j< DESIGN FLOW: _3 BEDROOMS ( 110 GPD) 330 GPD 3, MINIMUM PIPE PITCH TO BE 1%8" PER FOOT. USE A 330 GPD DESIGN FLOW 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AAS! oqO SEPTIC TANK: 330 GPD (2 ) = 660 5. PIPE JOINTS TO BE MADE WATERTIGHT. USE A 150.0. GALLON SEPTIC TANK. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH ENVIRONMENTAL CODE TITLE V. LOT 1 LEACHING: 7. THIS PLAN IS FOR PROPOSED !SEPTIC SYSTEM ONLY Al 17626± S 43 W a \� SIDES: 2(25 + 12.83) 2 (.74) - 112 TO BE USED FOR ANY OTHER PURPOSE. � 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 25 x 12.83 (.74) _Z a2 � � \\ BOTTOM: 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED TOTAL: 472 S.F. 344 GPD INSPECTION BY BOARD OF HEALTH AND PERMISSION FROM BOARD OF HEALTH. \ USE (2) 500 GAL LEACHING CHAMBERS (ACME OR a?? _ EQUAL) WITH 4' STONE ALL AROUND PROP. DWELL. \ / i \ �� >> TOP FNDN. S0, 43.0'' \\ �rrT � PROP.\TITLE L31 AiD%ry DRIVE. of # 31 BRUSIY HILL ROA1 PROP rr DECK. IN,, -THE TOWN OF: ^gem YARMO 11 TH PORT 41 6r- BENCHMARK PREPARED FOR: OUR FIRST HOME, INC HYDRANT TAG BOLT #2062 RE5 ®H21 � `� ELEV = 35.59' Fs 2rO O QO 40 H1 1 22 6e ,oti N. / / SCALE: 1" = 20' DATE: APRIL 13, 2004 38 I off 508-362-4541 \ fox 508 362-9880 - I ttt OF M,qS� . 2�4J.1.SN Or I4ass9ch down cape engineering, inc. �o�� ARNEH. `y AH"E "M o OJALA OJ ^ 37 CIVIL ENGINEERS CIVIL s s .o 0.3,07 �° ' BOARD OF HEALTH LAND SURVEYORS °o JST ORS D4UK, E MA 939 main st, yarmouth, ma 02675 A OJA P.E., P.E.S. DATE 02-206-11 APPROVED I DATE H- 10 ;S. IS NOT ED