Loading...
HomeMy WebLinkAbout96.36 - Title 5 Site PlanTOP FNDN. AT EL. 34.0' SYSTEM PROFIL .� ACCESS COVER TO WITHIN 6" OF FIN. GRADE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) 48.0` MINIMUM .75' OF COVER OVER PRECAST WITHIN 6" OF FIN. GRADE UN PIPE LEVEL 31.0 FOR FIRST 2' PROPOSED 1` Q GALLON SEPTIC 75' 30.0' TANK (H— 10 ) GAS 8.28' '�` BAffLE 28.45' ( 10D % SLOPE) \_6" CRUSHED STONE OR MECHANICAL = $� COMPACTION. (15.221 [21) DEPTH OF FLOW 4' (3_4 % SLOPE) ( % SLOPE) TEE SIZES: INLET DEPTH = 10 OUTLET DEPTH 14 - FOUNDATION— 10' SEPTIC TANK 38' D' BOX — 10 FT WATER LINE EASEMENT 20 FT SLOPE EASEMENT 2% SLOPE REQUIRED OVER SYSTEM ,2" DOUBLE WASHED PEASTOi PROVIDE INSPECTION PORT 32. (Y 3' MAX. 29.0' 3/4" TO 1 1/2" DOUBLE WASHED STONE 13' BENCHMARK HYDRANT TAG BOLT'#2062 ELEV = 35.59' L/ / �— \ ✓ \ HIGH PT. YyO \\ 0;j t LOT 2 15027± SIF A LA tt PROP. DWELL. ° w 111` 0 TOP FNDN m. 34.0' ll Q PROP. 28 115 m LI DECK PROP. "�LIN` DRIVE. 32 RESERVE `�+ � TH1 0 r It TH ti 11 40.00 }N TOP FNDN TO BE AT THE ELEVATI�N OF THE HIGH POINT IN ROAD (2' VARIANCE REQUESTED) 02-206-2 L=ACHING FACILITY 1 5.47' 20.7' TEST HOLE LOGS ENGINEER: LISA LYONS, RS WITNESS: DAVE FLAHERTY DATE: 2/11/04 PERC. RATE _ < 2 MIN/INCH CLASS I SOILS P# Q ELEV. 2� p' 32_2' p" 31.2' O%L R9 21, DESIGN: (GARBAGE DISPOSER IS NOT Al 1 OWFO ) 4� 'I - - - - MUNICIPAL WATER IS AVAILABLE _ LLOCATION MAP NTS DESIGN FLOW: _3 BEDROOMS ( 110 GPD) = 330 GPD A/E A/E LS 330 GPD DESIGN FLOW 4. ASSESSORS MAP 106 PARCEL O 26 9" tOYR 3/1 t0^ LS 10YR 3/1 PIPE JOINTS TO YARD SETBACKS: B B CONSTRUCTION LS USE A FRONT = 25' CLUSTER ENVIRONMENTAL (CODE TITLE V. LEACHING: LS THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS SIDED = 12' SUBDIVISION 28" 10YR 4/6 29.8 33• 10YR 5/6 28.45' FIRM REAR = 20' PLAN REF. — 469/97 8. PIPE FOR SEPTI6 SYSTEM TO SCH. 40-4" PVC. Cl 25 x 1283 (.74) _ . BOTTOM: — 237 Cl COMPONENTS NOT TO BE BACKFILLED OR CONC\€ALED Wil CS TOTAL: LS UNSUIT. FLOOD ZONE: C USE (2) 500 GAL. LEACHING CHAMBERS (ACME OR 10YR 5/4 43" 27.6' EQUAL) WITH 4' STONE ALL AROUND'�4 10YR 5/8 s �c02 O 35" 129" C2 I MS C2 61" 2/5Y 6/3 MS C3 2/5Y 6/4 PERC F/MS 21.45' 126" 2.5Y 6/4 20.7'' NO WATER ENCOUNTERED NOTES: 1. DATUM IS ASSUMED SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT Al 1 OWFO ) 2. 'I - - - - MUNICIPAL WATER IS AVAILABLE DESIGN FLOW: _3 BEDROOMS ( 110 GPD) = 330 GPD 3. MINIMUM PIPE PITCH TO BE 1/8", PER FOOT. USE A 330 GPD DESIGN FLOW 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO — 10 SEPTIC TANK: 330 GPD ( 2 ) = 660 5. PIPE JOINTS TO BE MADE; WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. USE A .15OR GALLON SEPTIC TANK ENVIRONMENTAL (CODE TITLE V. LEACHING: 7. THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT 2(25 + 12.83) 2 (.74) = 112 TO BE USED FOR ANY OTHER PURPOSE. SIDES: 8. PIPE FOR SEPTI6 SYSTEM TO SCH. 40-4" PVC. 25 x 1283 (.74) _ . BOTTOM: — 237 9. COMPONENTS NOT TO BE BACKFILLED OR CONC\€ALED Wil HOUT TOTAL: 472 S.F. X349 GPD INSPECTION BY ABOARD OF HEALTH AND PE0`MISS N OBTAINED USE (2) 500 GAL. LEACHING CHAMBERS (ACME OR FROM BOARD OF HEALTH. EQUAL) WITH 4' STONE ALL AROUND'�4 s �c02 O LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR 0— 100 --O EXISTING CONTOUR t? TITLE 5 ,,SITE LEAN OF # 41 BR USH � HILL ROAD IN THE TOWN OF: YARMOUTH PORT PREPARED FOR: OUR FIRST HOME, INC 20 0 20 40 6 BOARD OF HEALTH APPROVED DATE off 508-362-4541 fox 508 362-9880 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675 MA SCALE: 1" = 20-1 DATE: APRIL 13, 2004 a MgSsgC OF /A4Ss9c5 ARNE H.f2N ��o ARNE 0 LA ° A. a . VIL 0. 92 0' STEG� �gNpSV s A OJALA, P. L. S DATE