Loading...
HomeMy WebLinkAbout96.39 - Title 5 Site PlanLEGEND ALLOWED 100.0 PROPOSED SPOT ELEVATION 100x0. EXISTING SPOT ELEVATION - 100 PROPOSED CONTOUR — 100 — EXISTING CONTOUR yWl PROPOSED WATER 02-206 (LOT 5)- PROP. TOP FNDN. AT EL. 35.0' SYSTEM PROFILE ACCESS COVER TO WITHIN 6' OF FIN. GRADE (NOT TO SCALE) ACCESS COVER TO WITHIN 30 OF FIN. GRADE ACCESS COVER (WATERTIGHT) TO I ZI MINIMUM .75' OF COVER OVER PRECAST /_ WITHIN 6- OF FIN. GRADEI 2% SLOPE REQUIRED OVER SYSTEM 32.64' { RUN PIPE FOR FIRST LEVEL' PROPOSED 1500 GALLON SEPTIC 32.37' 32.12 I/"\31.57' TANK (H— 10 ) GAS BAFFLE 31.74' MIN. ( X SLOPE) \.6' CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 (2]) MIN DEPTH OF FLOW a 4' (--L-% % SLOPE) (-!—% SLOPE) TEE SIZES: INLET DEPTH OUTLET DEPTH = 14" FOUNDATION— 11' — SEPTIC TANK 38' D' BOX 2" DOUBLE WASHED PEASTONE OR GEOTE MLE FABRIC r73' MAX. 9' 3/4" TO 1 1/2" DOUBLE WASHED STONE _ LEACHING FACILITY 29.5' 4" BOTTOM TH-2 EL. 25.5' 1 LOT 7 ADJ. WATER AT EL. 23.6' NOTES_ ALLOWED 1. DATUM IS APPROXIMATE NGVD DESIGN FLOW- 3 BEDROOMS 2. MUNICIPAL WATER IS AVAILABLE 330 GPD 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. - 4. -DESIGN LOADING FOR ALL PRECAST UNITS TO I E AASHO H– 10 B 5. PIPE JOINTS TO BE MADE WATERTIGHT. LS 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 33.5' 30" 10YR 4/6 33.5' 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER URPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC GPD 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED S.F. 1349 WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSIOP OBTAINED FROM BOARD OF HEALTH. CHAMBERS (ACME 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CA NG DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK.- 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SH LL BE REMOVED 5' BENEATH AND AROUND THE PROPOS LEACHING FACILITY. 12. ALL TRAFFIC TO BE RESTRICTED UTILIZING LANSCAPE TIES OR FENCING WITHIN 10' OF PROPOSED LEAC ANG FACILITY OR CHAMBERS -ARE TO BE MADE H2O L AD BEARING. 11 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED ELEV. ELEV. 36.3. 0" V 36:0' — 0/A/E — DESIGN FLOW- 3 BEDROOMS 0 110 GPD = 330 GPD USE A-330 GPD DESIGN FLOW - 1OYR 3/2 SEPTIC TANK: 330 GPD (2) = 660 B USE A 1500 GAL. SEPTIC TANK LS LS LEACHING: 10YR 4/6 33.5' 30" 10YR 4/6 33.5' SIDES: 2 (25 + 12.83) 2 (.74) = 112 GPD BOTTOM 25 x 12.83 (.74) = 237 GPD TOTAL: 472 S.F. 1349 GPD USE (2) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 4' STONE ALL AROUND APPROVED DATE , MA BOARD OF HEALTH Q � - A o LOCUS Route 6 LOCUS MAP SCALE 1"=2000'± ASSESSORS MAP 96 PARCEL 39 LOCUS IS WITHIN FEMA FLOOD ZONE "C" AS SHOWN ON COMMUNITY PANEL #250015 0003 C DATED JUNE 17, 1996 TEST t HOLE - LOGS ENGINEER: DAVIDFLAHERTY, R.S. WITNESS:. PHIL RENAUD, YBOH DATE: JANUARY 16, 2007 PERC. RATE < 2 MIN/INCH CLASS I SOILS- P# 0 " — V ELEV. ELEV. 36.3. 0" V 36:0' — 0/A/E — 0/A/E LS LS 9" 1OYR 3/2 35.5' " 10YR 3/2 6 35.5 B B LS LS 34" 10YR 4/6 33.5' 30" 10YR 4/6 33.5' C PERC C MS MCS 2.5Y 6/5 2.5Y 6/5 126" 1 25_8' 126" I 25.5' NO GROUNDWATER ENCOUNTERED . 'ITLE 5 SITE PLAIN OF 57 BRUSH -HILL RD. YARMOUTH_ (PORT), MA PREPARED FOR OUR FIRST HOME DATE: FEBRUARY 9, 2007 REV. DATE: SEPTEMBER 5, 2007 REV. DATE: SEPTEMBER 24, 2007 (BLDG ENVELOPE) cDle:1 "= 20' rvlt -if/K �fX tgti �� 1 0- 10 - 20 30 40 50 FEET Ax off 508-362-4541 fax 508 362-9880 DANIEL �cycdown cope en gin e erin g, in C. OJALA h. 40980 C/ VIL . ENGINEERS osR�E� P LAND SURVEYORS I DATE DANIEL A. OJALA, P.E., P.L.S. 939 Main Street — YARMOUTHPORT, MASS. 1 11 02-2060UR_FIRSTHOME TOPO LOTS 4-7.9,10.DWG (DDF)