Loading...
HomeMy WebLinkAbout30.274 - Septic System Design (Copy 3)llcC li /03.5 ACCESS COVERS MUST BE WITHIN 6. OF FINISH GRADE FIRST 2' TO BE LEV£L7 T 99.5 U\99.18 1 i 1/0 III II ° OAS 99.35 99.0 a 98.1. BAFFLE 3 OUTLET 6 HIGH CAPACITY INFILTRATOR D B0X CHAMBERS W/3.5'2 STONE AROUND 1500 GAL 2-10'• X 25'1 X 10'd SEPTIC TANK 6• CRUSHED STONE OR COMPACTED BASE PROFILE : NOT TO SCALE / CATCH BASIN RIM -99.54 9' MINIMUM. 3- MAXIMUM COVER MIN 2' OFPEASTONE 3/4' - I I/2' DIA. DOUBLE WASHED STONE / R.25.36 33.87' _V�6� Bol C8/DN FND '( EL -100.97 0^ 17 Ap LI'O_T 1 0 2.107' S.F. 0• l 4 P / 0 6 NIDN GRACITY ?q� INFILTRATOR CHAMBERS `cFFN iI II/J.5'+ STONE AROUND 0 p OurE 28 Wr` F?�L O�US i '71 �• \ ,r LOCUS MAP •i�,/wsz INVERT ELEVATIONS: DESIGN CRITERIA: GENERAL NOTES: INVERT AT BUILDING: 100.0 DESIGN FLOW: 99.75 4 BEDROOMS AT 110 G.P.D. PER !. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION INVERT IN SEPTIC TANK: 99.5 BEDROOM EQUALS 440 G.P.D. OF THE SEWAGE DISPOSAL SYSTEM ONLY. INVERT OUT SEPTIC TANK: INVERT IN DIST. BOX: 99.35 NO GARBAGE GRINDER 2. VERTICAL DATUM IS ASSUMED, FOR BENCH MARKS INVERT OUT DIST. BOX: 99.16 SET. SEE SITE PLAN. INVERT IN LEACH CHAMBER: 99.0 SEPTIC TANK REQUIRED: BOTTOM OF LEACH CHAMBER: 98.17 440 G.P.D. X 200x - 880 GAL. J. ALL CONSTRUCTION METHODS AND MATERIALS AND ADJUSTED GROUND WATER: N/A SEPTIC TANK PROVIDED: 1500 GAL. MIN. MAINTENANCE OF THE SEPTIC SYSTEM SHALL OBSERVED GROUND WATER: N/A CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOTTOM OF TEST HOLE s1. 91.4 SOIL ABSORPTION SYSTEM REOUIRED: BOARD OF HEALTH REGULATIONS. DESIGN PERC RATE ( 5 MIN/INCH SOIL TEXTURAL CLASS - I 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER EFFLUENT LOADING RATE - 0.74 GPD/SF AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER 440 GPD / 0.74 GPD/SF - 595 S.F. REOUIRED THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. PROVIDED: 6 HIGH CAPACITY INFILTRATOR CHAMBERS W/3.5't STONE AROUND. A-600 S.F. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 OR i 600 S.F. x 0.74 - 444 GPD APPROVED EOUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED SOIL TES T PIT DA TA & PRECAST CONCRETE AND WATERTIGHT, D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE INDICATES 7 INDICATES THAN ONE OUTLET. PERCOLATION OBSERVED TEST GROUNDWATER - 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. TP •1 TP f2 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. HORIZON TEXTURE COLOR HORIZON TEXTURE COLOR 101.9 0' 101.9 0' O LOAMY IOYR FILL 8. ALL UNSUITABLE MATERIAL (A 6 B HORIZONS) Q SAND 4/3 ENCOUNTERED BELOW THE INVERT OF THE LEACHING 4 • _ .............. -M ...... ...... ........ - 101.6 7---- ........... -M ............ -OYR .. 101-3 FACILITY 70 BE REMOVED FOR A DISTANCE OF 5' E A LOAMY OA IOYR LOAMY fOYR A OA A /E AROUND AND REPLACED WITH SAND IN ACCORDANCE SAND 5/1 SAND 4/2 10'- ................................ 101.0 /0 '..................................... 101.0 WI TH TI TLE 5. DLOAMY IOYR LOAMY IOYR B W HAS BEEN MADE AS TO I] W SAND 4/6 SAND 5/8 9. NO DETERMINATION • 100.2 20' 100.2 COMPLIANCE WITH DEED RESTRICTIONS OR ZONING 20• ..-.. ,.. . Z LOAMSANDY ......... LOAM - B2 REGULATIONS. HALL REMAIN THE CLIENTS L3 6/8R SANDY 6/6R RESPONSIBILITYITOSOBTAINALL PERMITS. SPECIAL 25' -. ........ 99.8 42' - 98.4 PERMITS. VARIANCES ETC. FOR THIS PROJECT. C I FINE -MED 2.5Y C I FINE -MED 2.5Y SAND 7/4 SAND 7/4 10. IT SHALL REMAIN THE CLIENT'S RESPONSIBILITY TO HAVE THE PROPOSED BUILDING FOUNDATION DESIGNED TO ACCOUNT FOR THE EXISTING GRADE NO WATER NO WATER AND SOIL CONDITIONS AT. THE LOCATION OF THE - 126. 91.4 .120 91.9 PROPOSED BUILDING. DATE: OCTOBER 4. 1997 TEST BY: DAVID MASON WITNESSED BY: RICK JUDD PERC RATE: ( 2 MIN/INCH SEPT/C SYSTEM SES /G/V 1-4 CADET LAME. MAP 30. PARCEL 274 WES T YA R MO U rig-/, MA . PREPARED F -OR : MR MRS �/OH/V /V / CKAIVOROS 220 WES T POMO S TREET . IE -AST BR / OGEWA TER - MA 02,333 SCAL E : / 20 ' NO VEMRER 9. 2001 ���dL EAGLE SURVEYING, INC D _ 923 Route 6A B 05 002 Yarmo outhpr t . MA. 02675 �� � 1 1�~� (508) 362-8132 ( 508 ) 432-5333