HomeMy WebLinkAbout38 Canterberry Road - Site & Sewage Disposal Plant .) ALI CONSTRUCTION 5HALL CONFORM TO THE STATE EN VIKUNMEN I AL wuL.
TITLE5. AND THE REQUIREMENT5 OF THE LOCAL BOARD OF HEALTH.
2,) SEPTIC TANK(5). GREASE TitAP(5). D05LNG CHAMBER5(S) AND D15TRIBUTION
.. "BOX(FS) SHALL BE SET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY .
COMPACTED. OR ON A 6 INCH CRUSHED STONE BASE.
3J 5EPTIC TANKS) SHALL MEET A51M STANDARD C 1127-93 AND SHALL HAVE ,
AT LEA5TTHREE 20, DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT
TOM DF THE SEPTIC TANK TO THE FLOW UNE SHALL BE 480.
I I:JI ❑VIE. C: LLaYV-c - I I-
DEPRT QOM SOIL .... SOIL
SURFACE HORIZON TEXTURE
SD
.. CNCHF5) : `..(UA) .,
. SOtt
(MUN5
r MUN56-)
501E OTHER
MOMOTTLING-
..
0 ORGANIC
NE
13 LOAMY FINt n6ND
I MT, GM
NONE
N
15',30
3GM-1241 ED
6
N
,- e 2 IL
, OYR Q3
NONE
1t ET TDMDEES SHALL DD A MINIMUM Of 6' "A 1 nFFn nnr. lRAP979 CERT # 104733 1
4.) SCHEDUtf 40 PVC INLET AND O
ABOVE THE FLOW UNE Of THE SEPTIC TANK AND SHALL BE INSTALLED ON THE
CENTERUNE OF,THE TANK DIRECTLY UNDER 7F1E CLEANOUT MANHOLE' '
5.f RAISE COVERS OP THE 5EPTIC TANK AND DL5TRLBUTICN! BOX WITH PRECAST
CONCRETE WATER TIGHT RT5ERS OVER INLET AND OUTLET TEES TO WITHIN 6' OF
F NL5H GRADE.
G.) PIPING SMALL CON515T OF 4.5CHEDULE 40 PVC OR EQUIVALDJT. PIPE SHALL
F NOT 1f55 THAN I %
BE LAID ON A MINIMUM CONTINUOUS GRADE O
UNES FOR SOIL ABSORPTION SYSTEM (AS REauIRED) SHALL BE DATE OF TESTING: ':01/14/04 \ ,� �N\dei ac r wTING S
. 7.) DISTRIBUTION PERCOLATION RATE: LE55 THAN 5 MINRNCH IN •C I • LAYER ji �� V`I .ILS4 TING SPOT GRADE
" 4' DIAMETER SChLEDUIf 40 PVC WD AT 0.005 FT/FT. UNE SHALL BE CAPPED
W(TNF55LiI BY. MATTHEW T-PAP.RELL, E[T. BENNETT 3 ORELLLY, INC. j(L+ -
AT END OR A5 NOTED.
DAVE FLAHERTY. AGENT.: YARMOUTH HEALTH DEPARTMENT OM A . .: .• - 53. " - 24x5. PROPOSED SPOT GRADE
iSTR BLJTION BOX SHALL REMAIN LEVEL AT LEAST NO WATER ENCOUNTERED G�Z `P f N
SJ OUftt7PiPiS FROM D 5 1 48 - _ WATER SERVICE LM UNE
w
2' BEFORE PITCHLNG TO 501L AESORPTION 5YSTEM, ' WATER TEST DISTRIBUTION USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM. RQF,36 S
BOX 70 ASSURE EVEN DISTRIBUTION. -: ;. - ' Vii• - -
-o OVERHEADUTILf1Y5ERVICE
J
u UNDERGROUND UTIUIYSERVICE
9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6' MEASURED BELOW QA v --
THE OUTLET INVERT. »� « w �3 /
.. - .' r •_ - .• .B.vl• l
,- <,. GAS SERVICE UNE
e ! D.) BASE AGGREGATE FOR THE LEACHING FACILITY 5HALL CONSIST O�3/4 TO -
3. SDS 5T SEPTIC TANK ORl
NG LOCATION,
1:112' DOUBLE WASHED STONE FREE OF IRON, FINES AND DUST AND SHALL BE / NQNrn i 3 '
INSTALLED BELOW THE CROWN OF THE D15TRIBLJiION UNE TO Tl1EBOTTOM OF THE Dom;. - / DB DISTRIBUTION BOX _
(, SOIL ABSOPJ'TION SYSTEM. BASE AGGREGATE 5HALLBE COVERED WITH A 2' Q
I D
LAYER OF. I/8' TO 1/2' DOUBif WASHED STONE FREE OF IRON.'P9NE5'AND DUST. W 2 •.. , k„ 6 '� SAS : 50(L ABSORPTION SYSTEM
Reserve RESERVE"FOR FUTURE
( 1 1-J VENT SOIL ABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET; � ' � • - ' . s -'Qy 5
L 'WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAY5. PARKING AREAS. - -
CQa UTILITY LE
MATMAh OR WnEN I'RF55URE DOSED. w �� . G mht , ® `
TURNING AREAS OR OTHER IMPERVIOUS -
2 o e.eo G�pGf J n 46
t 2J SOIL ABSORPTION SSTEM SHAL- BE COVERED WITH A MINIMUM OF 9' Of f0 1WELL
� CATCH BASIN
• > »a
�p w.
CLEAN MEDIUM SAND (D(CLIJDINGTOPSOIL). v I PORCh T50.0
XL FIRE HYDRANT
t�
Cn s I "i 1� ® DRAINAGE MANHOLE
13.)FINISH GRADE SHALL BE A MAXIMUM OF 36' OVER THE TOP OF ALL SYSTEM 3�
COMPONEMS.JNCIl10tNG THE SEPTIC TANK. DISTRIBUTION BOX. DOSING CHAMBER - - A `� '3�,� Fii ` :-�� ^
,' , ■ CONCRETE BOUND, FOUND
AND SOIL ABSORPTION SYSTEM. 5EPLIC TANKS SHALL HAVE A MINIMUM COVER N - : , , 9C°� p 5 5�2` ,..� -" � • - � o � i � TOP OF BANK
14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION 5N5TEM UNTIL or 91. S' ` ••- LIMIT OF WORK
5 . s
.:RECEIPT OF A CERTIFICATE OF COMPLIANCE. THE PERIMETER OF THE SOIL AB50RP- _ B y 53. _ . xia 50' O ��,�� ...1 �' >� I
TION SYSTEM 51JALL Be STAKED AND MACGED TO PREVENT THE USE OF SUCH $Eptu� !IG \: 0 , AB
e A . was l / D'N .5\,i) li� .ia ea •�
EDGE OF CLEARING
ARTA FOR ALL ACTIVITIES THAT MIGHT DAMAGE THE SYSTEM. • ��� 1agOX
'
15.) THE BOARD OF HEALTH SMALL REQUIRE INSPECTION OF ALL CONSTRUCTION SOP
r
i
BY AN AGENT OF THE BOARD OF HEALTH (OR THE DESIGNER IF V15 SNSTEM RE- LOT 54 "`•� 1 ` i`I:II4;. 2�•E I /
QUIRES A VARIM, AND MAY REC9JIRE SUCH PERSON TO CERTIFY M WRITING PLAN V I EN/ 25.7 b
_ .......e. uAm Accu IYT.API FTM IN ACCORDANCE WITH THE TERMS OF THE Area 15 280 5F±
i
46.E (3dmm) N
r
eel
.w.to 4
�„ Y WW_:r& - •way ./. .
Cable Q . .
Ped.. -Z_ 0 r
->a L 46 ZONING TABLE
t Anne
O RESIDENTIAL P40
{
,2` )3' 5ETBACK5: - - FRONT YARD - 30' .
t ».
- - <.. ` / SIDE YARD - 2
4.- REAR YARD - 2d
�
» MAXIMUM BUILDING COVERAGE - 25%
J • nee /
BUILDING COVERAGE PROPOSED - 13%
I PLOW PROFILEPLAN
NOT TO SCALE29 63 ' '
_ SCALE f e=2(Y
i THIS AREA 15 SERVED -
24' DIAMETER CONCRETE COVERS
1 , TOP OF FOUNDATION - _ . RAISED TO WITHIN 1' OF FINISH BY TOWN WATER.:.
> EL1151.0 GRADE (OR AS NOTED) - -
1 P EL- 48.2 P d EL=47.8 (max) P EL=46.0-47.75 (max) -
j, ,� ` eENCHMARK_ Mr. and Mrs. JamC5 O'Leary
\�\� '� \'` .. - - Topof Concrete Bound _
36' Prorowd EL- 47.39 (Assumed datum) 144 Randall Street, N. Easton. MA -02356
46.9
44.75 (9' Min - 36' Max) 46
2•LAYER dF tom•- 112* STONE rs"°FAt. 51TE � 5EWAGE D15POSAL 5YSTEM
47.00 45.5 10 14' 45.50 in / 3/4'- 1-1/2. STONE VREINLI7 38 Canterbury Road, Yarmouthport, MA
CML
3•..: I- 44.32 44.15 �- _N m-
40' ! r DROP 1. BENNETT A Q REILLY, ' Inc.
GAS BAFftE 42.00 H - _�-•--� �{wF` =� Engineering. Environmental and Surveying Seraleea -
USETHREE SMOREY FRECA5T +I N O
500 GALLON 1EA01 CHAMBERS '4 � -V, IVT` ' V , -
� EL - 37.+ 8_ 1879 Ye1n Street -Route BA
Longest Ru WITH 4' OF STONE AROUND -- - Batton of C I layer in Tat Hole A2 - - P.O. Hoz 1887 _
13' (END VIEW) EL - 36.2± O. 20 40 (508)896-6890 Office 8reweter. HA 0269Y (808)898-4887 Yax
1500 GALLON 05-5
LEACHING CHAMBER Bottom of '^Test Hole N2 DATE: scALE: BN: p1ECK JOB NUMBER:
SEPTIC TANK D -SOX 33.5'x 12.153'x 2.00 SCALE V=20
03/24/04 As Noted LICA .. JMO 8003-3923
H-20
A �"2-
r
i
BE LAID ON A MINIMUM CONTINUOUS GRADE O
UNES FOR SOIL ABSORPTION SYSTEM (AS REauIRED) SHALL BE DATE OF TESTING: ':01/14/04 \ ,� �N\dei ac r wTING S
. 7.) DISTRIBUTION PERCOLATION RATE: LE55 THAN 5 MINRNCH IN •C I • LAYER ji �� V`I .ILS4 TING SPOT GRADE
" 4' DIAMETER SChLEDUIf 40 PVC WD AT 0.005 FT/FT. UNE SHALL BE CAPPED
W(TNF55LiI BY. MATTHEW T-PAP.RELL, E[T. BENNETT 3 ORELLLY, INC. j(L+ -
AT END OR A5 NOTED.
DAVE FLAHERTY. AGENT.: YARMOUTH HEALTH DEPARTMENT OM A . .: .• - 53. " - 24x5. PROPOSED SPOT GRADE
iSTR BLJTION BOX SHALL REMAIN LEVEL AT LEAST NO WATER ENCOUNTERED G�Z `P f N
SJ OUftt7PiPiS FROM D 5 1 48 - _ WATER SERVICE LM UNE
w
2' BEFORE PITCHLNG TO 501L AESORPTION 5YSTEM, ' WATER TEST DISTRIBUTION USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM. RQF,36 S
BOX 70 ASSURE EVEN DISTRIBUTION. -: ;. - ' Vii• - -
-o OVERHEADUTILf1Y5ERVICE
J
u UNDERGROUND UTIUIYSERVICE
9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6' MEASURED BELOW QA v --
THE OUTLET INVERT. »� « w �3 /
.. - .' r •_ - .• .B.vl• l
,- <,. GAS SERVICE UNE
e ! D.) BASE AGGREGATE FOR THE LEACHING FACILITY 5HALL CONSIST O�3/4 TO -
3. SDS 5T SEPTIC TANK ORl
NG LOCATION,
1:112' DOUBLE WASHED STONE FREE OF IRON, FINES AND DUST AND SHALL BE / NQNrn i 3 '
INSTALLED BELOW THE CROWN OF THE D15TRIBLJiION UNE TO Tl1EBOTTOM OF THE Dom;. - / DB DISTRIBUTION BOX _
(, SOIL ABSOPJ'TION SYSTEM. BASE AGGREGATE 5HALLBE COVERED WITH A 2' Q
I D
LAYER OF. I/8' TO 1/2' DOUBif WASHED STONE FREE OF IRON.'P9NE5'AND DUST. W 2 •.. , k„ 6 '� SAS : 50(L ABSORPTION SYSTEM
Reserve RESERVE"FOR FUTURE
( 1 1-J VENT SOIL ABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET; � ' � • - ' . s -'Qy 5
L 'WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAY5. PARKING AREAS. - -
CQa UTILITY LE
MATMAh OR WnEN I'RF55URE DOSED. w �� . G mht , ® `
TURNING AREAS OR OTHER IMPERVIOUS -
2 o e.eo G�pGf J n 46
t 2J SOIL ABSORPTION SSTEM SHAL- BE COVERED WITH A MINIMUM OF 9' Of f0 1WELL
� CATCH BASIN
• > »a
�p w.
CLEAN MEDIUM SAND (D(CLIJDINGTOPSOIL). v I PORCh T50.0
XL FIRE HYDRANT
t�
Cn s I "i 1� ® DRAINAGE MANHOLE
13.)FINISH GRADE SHALL BE A MAXIMUM OF 36' OVER THE TOP OF ALL SYSTEM 3�
COMPONEMS.JNCIl10tNG THE SEPTIC TANK. DISTRIBUTION BOX. DOSING CHAMBER - - A `� '3�,� Fii ` :-�� ^
,' , ■ CONCRETE BOUND, FOUND
AND SOIL ABSORPTION SYSTEM. 5EPLIC TANKS SHALL HAVE A MINIMUM COVER N - : , , 9C°� p 5 5�2` ,..� -" � • - � o � i � TOP OF BANK
14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION 5N5TEM UNTIL or 91. S' ` ••- LIMIT OF WORK
5 . s
.:RECEIPT OF A CERTIFICATE OF COMPLIANCE. THE PERIMETER OF THE SOIL AB50RP- _ B y 53. _ . xia 50' O ��,�� ...1 �' >� I
TION SYSTEM 51JALL Be STAKED AND MACGED TO PREVENT THE USE OF SUCH $Eptu� !IG \: 0 , AB
e A . was l / D'N .5\,i) li� .ia ea •�
EDGE OF CLEARING
ARTA FOR ALL ACTIVITIES THAT MIGHT DAMAGE THE SYSTEM. • ��� 1agOX
'
15.) THE BOARD OF HEALTH SMALL REQUIRE INSPECTION OF ALL CONSTRUCTION SOP
r
i
BY AN AGENT OF THE BOARD OF HEALTH (OR THE DESIGNER IF V15 SNSTEM RE- LOT 54 "`•� 1 ` i`I:II4;. 2�•E I /
QUIRES A VARIM, AND MAY REC9JIRE SUCH PERSON TO CERTIFY M WRITING PLAN V I EN/ 25.7 b
_ .......e. uAm Accu IYT.API FTM IN ACCORDANCE WITH THE TERMS OF THE Area 15 280 5F±
i
46.E (3dmm) N
r
eel
.w.to 4
�„ Y WW_:r& - •way ./. .
Cable Q . .
Ped.. -Z_ 0 r
->a L 46 ZONING TABLE
t Anne
O RESIDENTIAL P40
{
,2` )3' 5ETBACK5: - - FRONT YARD - 30' .
t ».
- - <.. ` / SIDE YARD - 2
4.- REAR YARD - 2d
�
» MAXIMUM BUILDING COVERAGE - 25%
J • nee /
BUILDING COVERAGE PROPOSED - 13%
I PLOW PROFILEPLAN
NOT TO SCALE29 63 ' '
_ SCALE f e=2(Y
i THIS AREA 15 SERVED -
24' DIAMETER CONCRETE COVERS
1 , TOP OF FOUNDATION - _ . RAISED TO WITHIN 1' OF FINISH BY TOWN WATER.:.
> EL1151.0 GRADE (OR AS NOTED) - -
1 P EL- 48.2 P d EL=47.8 (max) P EL=46.0-47.75 (max) -
j, ,� ` eENCHMARK_ Mr. and Mrs. JamC5 O'Leary
\�\� '� \'` .. - - Topof Concrete Bound _
36' Prorowd EL- 47.39 (Assumed datum) 144 Randall Street, N. Easton. MA -02356
46.9
44.75 (9' Min - 36' Max) 46
2•LAYER dF tom•- 112* STONE rs"°FAt. 51TE � 5EWAGE D15POSAL 5YSTEM
47.00 45.5 10 14' 45.50 in / 3/4'- 1-1/2. STONE VREINLI7 38 Canterbury Road, Yarmouthport, MA
CML
3•..: I- 44.32 44.15 �- _N m-
40' ! r DROP 1. BENNETT A Q REILLY, ' Inc.
GAS BAFftE 42.00 H - _�-•--� �{wF` =� Engineering. Environmental and Surveying Seraleea -
USETHREE SMOREY FRECA5T +I N O
500 GALLON 1EA01 CHAMBERS '4 � -V, IVT` ' V , -
� EL - 37.+ 8_ 1879 Ye1n Street -Route BA
Longest Ru WITH 4' OF STONE AROUND -- - Batton of C I layer in Tat Hole A2 - - P.O. Hoz 1887 _
13' (END VIEW) EL - 36.2± O. 20 40 (508)896-6890 Office 8reweter. HA 0269Y (808)898-4887 Yax
1500 GALLON 05-5
LEACHING CHAMBER Bottom of '^Test Hole N2 DATE: scALE: BN: p1ECK JOB NUMBER:
SEPTIC TANK D -SOX 33.5'x 12.153'x 2.00 SCALE V=20
03/24/04 As Noted LICA .. JMO 8003-3923
H-20
A �"2-