HomeMy WebLinkAboutEngineered Plan - 2015a . M SOIL TEST PIT DATA NOT TO SCALE TEST PIT TP -1 GRD. EL. 12.1 SHGW EL 3.8 A / SANDY LOAM 10YR 3/2 EL. 11.4 8" B LOAMY SAND IOYR 4/6 EL 9.4 EL. 8.1 EL 3.8 EL. 2.1 EL 1.1 C MEDIUM SAND 2.5Y 6/4 ADJ. G.W. v 1 OBS G.W. - 1 32" 48- 00" 20" A7" TEST RANGE r 'I CROSS-SECTION E; DISTRIBUTION BOX DETAIL (H-10) TOWN OF YARMOUTH - oHw �=-----�. oHw-I?O�!I�D�tllf-t DISK IRON PIPE NOT TO SCALE -'- ��►`` FOUND ANPNELD OHW'--- OHW----. OHW_________ oHW D & HELD REMOVABLE r 6" MAX. �� OHW--------- OHW- I OHW----------. OHW---------- OHW ��.�•��. COVER -� -• .... � � _,,, HDPE RISER 1. THIS PLAN IN ONLY INTENDED FOR THE PERMITTING AND CONSTRUCTION OF THE ST�,F 0 RFFT SEWAGE DISPOSAL FACILITIES AND THE BUILDING ADDITION. LEACHING FIELD DETAIL 2" WALLS ----- oHw LOCUS INFORMATION 3. THERE ARE NO KNOWN OR PROPOSED PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE BRIAN Z YERGATIAN a N 9-1/2" O O NOT TO SCALE BRIAN G. YERGITL44 DATE MATERIALS. 5. IF AN OVERDIG IS SPECIFIED, REPLACE ALL EXCAVATED MATERIALS WITHIN THE LIMIT OF A •• EXCAVA11ON WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND j DELETRIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL (BARNSTABLE COUNT MIN. 2% SLOPE 2" MIN. OF 1/8" TO 1/2" 6" MINIMUM 12'0 REPRESENTATIVE SAMPLE OF FILL. UP TO 45% BY WEIGHT MAY BE RETAINED ON THE 3/4" TO 1 -1/2 - #4 SIEVE. SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF SECTION VIEW CRUSHED STONE OVER LEACHING FIELD DOUBLE WASHED STONE 10% MUST PASS #50 SIEVE CURRENT OWNER: WILLIAM A. PUNCH O5% MUST PASS #200 SIEVE 6. EXISTING U11UTIES WHERE SHOWN ON THE PLANS ARE APPROXIMATE. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. CONTRACTOf SHALL VERIFY THE SIZE, LOCATION AND ELEVATION OF INVERTS CAMILLE M. PUNCH ONSITE SOIL EVALUATION HIGH GROUNDWATER COMPUTATION 7. TITLE REFERENCE: DEED BOOK 10481, PAGE 194. PROPOSED CONSTRUCTION ACTIVITIES WITH DIG -SAFE AND THE APPLICABLE UTILITY WILLIAM PUNCH COMPANIES, AND SHALL COMPLETE THE PROPOSED WORK WITHOUT ANY INTERUPTIONS BOSTON, MA 02115 IN SERVICE. (BASED ON TP -1 CONTRACTOR IS REQUIRED TO NOTIFY DIG -SAFE, PER MASS. STATUTE CHAPTER 82, 349 Route 28, Unit D 12" MIN. COVER 02673 CONSTRUCTION. 9. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. INSTALLATION 0 5 10 20 Fw FILE: P:\prj\4986900\Civil\-Drawings\4992600-SEP.dwg DWG. NO: 6315-01 SHEET 1 OF 1 JOB. NO: 4-9926.00 PLAN REFERENCE: PLAN BOOK 222, PAGE 121. DATE: JULY 2, 2015 DEPTH TO WATER 10.0 ;;,. K; :,�;.,,:.:�: :,,,,.. .•• ;,.. .: .;, �..:. TEST BY: BSC GROUP, INC. INDEX WELL MIW-29 ASSESSORS MAP: 42 WITNESSED BY: AMY VON HONE, R.S., CHO WATER LEVEL RANGE ZONE A CONNECT ENDS PARCEL: 107 LICENSED SOIL EVALUATOR: KIERAN J. HEALY, SE, PLS DEPTH 0 INDEX WELL - JUNE 2015 8.25 4" PERFORATED OF LATERALS PERCOLATION RATE: < 2 MINS./INCH WATER LEVEL ADJUSTMENT 1.7 SCH. 40 PVC PIPE (�.) T\ \ \ \ \ \ �\\�, �\ \ T\ `\ ZONING DISTRICT: SOIL CLASS: CLASS 1 DEPTH TO HIGH WATER 8.3 �\ �\ �\ T\ LEVEL BOTTOM SETBACKS: FRONT FRONT 30' L.T.A.R.: 0.74 GPD/S.F. 1 SIDE 20' REAR 20' 30' PROFILE • MINIMUM LOT SIZE: 40,000 S.F. 3/4" TO 1-1 /2" 4" MIN. LOAM LEGEND DOUBLE WASHED STONE AND SEED EXISTING TOTAL LOT AREA: 10,542± S.F. CONTAINING NO FINES NITROGEN SENSITIVE 1 ZONE: NOT A ZONE 11 UNSUITABLE �_ ESTIMATED 5' OVERDIG TO BOTTOM FEMA FLOOD MATERIALS = SEASONAL HIGH GROUNDWATER ;` ;;� ~ OF LEACHING FIELD ZONE DISTRICT: "X -OTHER" DATED 7-16-14 (TO BE REMOVED) GEOTEX11LE FABRIC MAY ;.,�' .," . '' L '^ �' PANEL #25001 CO589 J -� OBSERVED BE SUBSTITUTED FOR 2" PEASTONE LAYER OVERLAY DISTRICT: NONE $: ,C.,C.�,,C�� ,C�� D04D04 PERCOLATION S'GROUNDWATER 4' 4' 4' 4'5' TEST RANGE r 'I CROSS-SECTION E; DISTRIBUTION BOX DETAIL (H-10) TOWN OF YARMOUTH - oHw �=-----�. oHw-I?O�!I�D�tllf-t DISK IRON PIPE NOT TO SCALE -'- ��►`` FOUND ANPNELD OHW'--- OHW----. OHW_________ oHW D & HELD REMOVABLE r 6" MAX. �� OHW--------- OHW- I OHW----------. OHW---------- OHW ��.�•��. COVER -� -• .... � � _,,, HDPE RISER 1. THIS PLAN IN ONLY INTENDED FOR THE PERMITTING AND CONSTRUCTION OF THE ST�,F 0 RFFT SEWAGE DISPOSAL FACILITIES AND THE BUILDING ADDITION. OHW- Fi 2. 2" WALLS ----- oHw 3" 3. THERE ARE NO KNOWN OR PROPOSED PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE BRIAN Z YERGATIAN a N 9-1/2" O O IF AN OVERDIG IS SPECIFIED, REMOVE ALL TOPSOIL, SUBSOIL AND OTHER UNSUITABLE BRIAN G. YERGITL44 DATE MATERIALS. 5. IF AN OVERDIG IS SPECIFIED, REPLACE ALL EXCAVATED MATERIALS WITHIN THE LIMIT OF A •• EXCAVA11ON WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND 2" DELETRIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL (BARNSTABLE COUNT SHALL NOT BE USED.' FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2 BOTTOM ON LEVEL STABLE BASE 6" MINIMUM 12'0 REPRESENTATIVE SAMPLE OF FILL. UP TO 45% BY WEIGHT MAY BE RETAINED ON THE 3/4" TO 1 -1/2 - #4 SIEVE. SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF SECTION VIEW CRUSHED STONE 12.4 a20 �-�• 21 " � 12.1 SUNSET DR/VE (5) 5" DIA. (40'W/DE) 13" KNOCKOUTS „ TYP. 12.1 12.0 I��,• ��.�- - ----x--- -----�-------- .� PLAN VIEW �� O \ 0 NOTES: 1. PROVIDE INLET TEE OR BAFFLE WHERE SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR IN PUMPED SYSTEM. 2. FIRST TWO FEET OF PIPE OUT OF DIST. BOX TO BE LAID LEVEL 3. ALL PIPE CONNECTIONS AND CONCRETE CONSTRUCTION SHALL BE WATERTIGHT. 4. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. 5. CONCRETE COVER SHALL BE RAISED TO WITHIN 6 INCHES OF FINISHED GRADE. DESIGN CALCULATIONS EXISTING 3 BEDROOM DWELLING LK1�17/� Z. b6& 3 BEDROOMS @ 110 GPD/BEDROOM = 330 GPD 1 REQUIRED SEPTIC TANK 330 GPD X 200% = 660 GALLONS USE 1,500 GALLON SEPTIC TANK SIZE OF REQUIRED CACHING FACILITY DESIGN PERC. RATE: <2 MIN/INCH LONG TERM APPL RATE. 0.74 GPD/SF 330 GPD _ 0.74 GPD/SF = 446 SF SIZE OF LEACHING FACILITY PROVIDED USE A 30' X 16' LEACHING FIELD BOTTOM AREA: 30' X 16' = 480 S.F. EFFECTIVE LEACHING AREA = 480 S.F. 480 S.F. X 0.74 GPD/S.F. = 355 GPD (INSTALLED CAPACITY) 355 GPD > 330 GPD (25 GPD RESERVE CAPACITY PROVIDED) 1,500 GAL NOT TO SCALE NOTES: 1. SEPTIC TANK SHALL BE STEEL REINFORCED CONCRETE. 2. SEPTIC TANK SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING. 3. ALL PIPE CONNECTIONS AND CONCRETE CONSTRUCTION SHALL BE WATERTIGHT. 4. TEES SHALL BE SCH. 40 PVC AND SHALL BE LOCATED WITHIN 12" OF TANK WALL AND ACCESSIBLE FROM TANK COVER. 5. FILL ALL UNUSED KNOCKOUTS WITH HYDRAULIC CEMENT. 10'-0" 5'-8"LI - - - L� PLAN VIEW O O / O O O O 0- 0-0 O O O_\' / 12.4 / S87'32'35"E (-0-0- O 0-0-0-0-0-02L 103.20' r O TOWN OF YARMOUTH I I �! BOUND WITH DISK ` \ FOUND AND HELD i o O ` RESERVE AREA 480 S.F. 1 0 x .. 12.0 x 12.3 PARCEL A II O L_.. __ --k 12.2 / \ � 1 90,542± S.F. x 1 PUMP, CRUSH AND DISPOSE + ! 12.3 O / OF EXISTING LEACHING PITS I me \ 12.4 x IN ACCORDANCE WITH TITLE 5 i PROPOSED I o 10 _ 1 SEPTIC TA,500 NK E 1 GENERAL NOTES - --- 2.0 1. THIS PLAN IN ONLY INTENDED FOR THE PERMITTING AND CONSTRUCTION OF THE ST�,F 0 RFFT SEWAGE DISPOSAL FACILITIES AND THE BUILDING ADDITION. OHW- Fi 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO 310 CMR 15.000 ----- oHw AND YARMOUTH BOARD OF HEALTH REGULATIONS. 3. THERE ARE NO KNOWN OR PROPOSED PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE BRIAN Z YERGATIAN a N PROPOSED LEACHING FACILITY. 4. IF AN OVERDIG IS SPECIFIED, REMOVE ALL TOPSOIL, SUBSOIL AND OTHER UNSUITABLE BRIAN G. YERGITL44 DATE MATERIALS. 5. IF AN OVERDIG IS SPECIFIED, REPLACE ALL EXCAVATED MATERIALS WITHIN THE LIMIT OF 38 SOUTH STREET EXCAVA11ON WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND SOUTH YARMOUTH DELETRIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL (BARNSTABLE COUNT SHALL NOT BE USED.' FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2 JULY 8, 2015 INCHES. A SIEVE ANALYSIS USING A #4 SIEVE SHALL BE PERFORMED ON A . 12'0 REPRESENTATIVE SAMPLE OF FILL. UP TO 45% BY WEIGHT MAY BE RETAINED ON THE - •-� #4 SIEVE. SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF DATE THE FOLLOWING SPECIFICATIONS: 100% MUST PASS #4 SIEVE 10% MUST PASS #50 SIEVE 0-20% MUST PASS #100 SIEVE O5% MUST PASS #200 SIEVE 6. EXISTING U11UTIES WHERE SHOWN ON THE PLANS ARE APPROXIMATE. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. CONTRACTOf SHALL VERIFY THE SIZE, LOCATION AND ELEVATION OF INVERTS OF UTILITIES AND STRUCTURES, WITHIN THE LIMIT OF WORK, PRIOR TO THE START,OF CONSTRUCTION. IF AIRY DISCREPANCIES ARE DISCOVERED OR FIELD CHANGES REQUIRED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY COORDINATING THE vC 3C ViNe PROPOSED CONSTRUCTION ACTIVITIES WITH DIG -SAFE AND THE APPLICABLE UTILITY WILLIAM PUNCH COMPANIES, AND SHALL COMPLETE THE PROPOSED WORK WITHOUT ANY INTERUPTIONS BOSTON, MA 02115 IN SERVICE. 8. CONTRACTOR IS REQUIRED TO NOTIFY DIG -SAFE, PER MASS. STATUTE CHAPTER 82, 349 Route 28, Unit D SECTION 40 (1-888-344-7233) A MINIMUM OF 72 HOURS PRIOR TO THE START OF 02673 CONSTRUCTION. 9. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. INSTALLATION r E LIVINGROOM I I OR USE OF A GARBAGE GRINDER AT THIS PROPERTY IS NOT ALLOWED PER 310 CMR 1 O CO PROPOSED PARCEL B 15 )40(4) 12 4 DIST. BOX _ o _CL FIRST FLOOR at '`•' .� 00 1 ' 3 / O O �•...... y ... C9 N DEN KITC"EN ... C0 • .I to 70 ....... ..... 1 x 12.2 250...... .....:J o o O 33 4 -_ .....o . w ' F- x 12.2 OHW ... BENCHMARK PATIO PROPOSED I;:::::'. ••• • 1 LEACHING FIELD CORNER OF CONCRETE 30'x16' oHW BULKHEAD. ELEV 12.70_ I 12.1 x ..... co �" •IM1 ,'� 16.7' co x 1 12.4 RAISE AT LEAST ONE EXISTING COVER 1 /\ •�•��••��������� �•��•�. TO WITHIN 6" OF FINISHED GRADE x 12.5 �'•_ THE RISER SHALL BE 18" tPE PIPE O '4 M 12.1 6" MAX j CONC. COVER O 1 PROPOSED 4" �. 10 T 3" 4' MIN. 5'-8" LIQUID -LOCATE DEPTH •4 INLET TEE OUTLET TEE UNDER COVER W/GAS BAFFLE - 3" CROSS-SECTION VIEW 3" SECOND FLOOR BED #1 BED #2 N87 32'35"W 110.22' 12.8 INTERCONNECT END OF DISTRIBUTION LATERALS 12.8 OBSERVATION PORT SCHEDULE OF ELEVATIONS- CUT LEVATIONSCUT BACK 1REELINE AS SHOWN TOP OF FOUNDATION 13.10 A 4' INVERT AT BUILDING 10.90 B 4" INVERT AT SEPTIC ,TANK (IN) 10.45 C 4" INVERT AT SEPTIC TANK (OUT) 10.20 D 4" INVERT AT DIST. BOX (IN) 9.70 E Sof 4" INVERT AT DIST. BOX (OUT) 9.53 F °+ ELEVATIONS AT LEACHING FACILITY: CRAIGX No I3�>30.90 4" INV. AT LEACHING FIELD 9.45 G (BRKOUT 10.0) 4" INV. AT END LEACHING FIELD 9.30 H BOTTOM OF LEACHING ,FIELD 8.80 J ESTIMATED SEASONAL (HIGH GROUNDWATER 3.80 K i 7W TYPICAL J TYPICAL SYSTEM PROFILE NOT TO SCALE � 4" SCH. 40 PVC /? / I L=10± FT. EL.=A S=0.05 TOP FOUNDATION FIRST PIPE LENGTH EL= 12.4 4" SCH. 40 PVC TO BE SET LEVEL L=15t FT. FOR MIN. 2' FINISH GRADE S=0.03 EL. 12.3-12.0 4" SCH. 40 PVC � .NIL 1=D .: I=C 1=E 1=F �e jt�' 5 OUTLET i '> 3 .:•• s D --BOX NOTE• SEPTIC TANK MAGNETIC REFLECTIVE TAPE SHALL BE PROVIDED IN THE TRENCH OVER ALL PVC PIPING J f Zk 5.0' SEPARATION K i Fi , EST. HIGH GROUNDWATER 2$ 11k144 M'A,,S� ST�,F 0 RFFT FT = LOCUS N•► M N M LOCUS MAP NOT TO SCALE OF Hi48s9cy ���•��1 G. Gu'rn BRIAN Z YERGATIAN a N CIVIL No. 4620 6� .0 9 9p FOfSTEP FESS/ON AL EN BRIAN G. YERGITL44 DATE PROFESSIONAL ENGINEER SEPTIC SYSTEM REPAIR' 38 SOUTH STREET IN SOUTH YARMOUTH MASSACHUSETTS (BARNSTABLE COUNT SITE PLAN JULY 8, 2015 IEW JUL 09705 +aa 1 - •-� NO. DATE DESC. M r 777 vC 3C ViNe PREPARED FOR: WILLIAM PUNCH 358 MARLBOROUGH STREET BOSTON, MA 02115 (617) 859--0810 BSC. ' 349 Route 28, Unit D W. Yarmouth, Massachusetts 02673 508 778 8919 CO 2015 BSC Group, Inc. SCALE: 1" = 10' 0 5 10 20 Fw FILE: P:\prj\4986900\Civil\-Drawings\4992600-SEP.dwg DWG. NO: 6315-01 SHEET 1 OF 1 JOB. NO: 4-9926.00