Loading...
HomeMy WebLinkAbout39 Carrie Lane - Site Plan10 �'2 09��i V92�S 4 sT SA LOCATION MA)P PORTION OF LOT 2 (9098 SF) TOTAL AREA = 18, 23 SF ASSESSORS MAP: 51 PARCEL:2 PLAN BK: 106, PG: 41 & 2381151 CURRENT ZONING: RSAO MINIMUM BUILDING SETBACKS: FRONT: 30' SIDE: 20' REAR: 20' FLOOD ZONE: B KEY: EXISTING CONTOUR: - - - - PROPOSED CONTOUR: ............. EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE:* UTILITY POLE: -0- FENCE LINE: - HYDRANT: -6- RETAINING WALL: m M8-12 " PROPOSED 3BEDROOM DWELLING 26' 2' 14' 22' 14' PROPOSED DWELLING y1, pE C�y1913� EXISTING SHED - TO BE REMOVED SEPTIC SYSTEM DESIGN N FLOW ESTIMATE: 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY -7:1 SEPTIC TANK: 330 GAL / DAY -2L2- DAYS= 660 GAL 4' USE 1500 GALLON SEPTIC TANK N LEACHING AREA: USE 10 INFILTRATOR CHAMBERS (QUICK4 STANDARD CHAMBERS) T OF STONE AROUND SIDES AND V AT ENDS (44' x 9' x 8" DEEP) SIDE AREA: (44' + 9') x 2 x 8/12 = 71 SF (0.74) = 53 GAL/DAY BOTTOM AREA: 44' x 9' = 396 SF (0.74) =-L93 GAUDAY CAPACITY =_346 GAUDAY Z EXISTING/ GAS GATE i tP /� 1 woo\ o� / ON05F \_0 ysF 89� 99 I O0 (P 9oy1 g l 1 99 99.1 SEPTIC SYSTEM SECTION PEASTONE 3/4" - 1 112" WASHEDSTONE INSPECTION PORT ELEV.= 96.73 97.5 y 3' MAX. .,,,,T ELEV. 99.0 COVER (1' MIN) (IXISTING) 97.0 CIA HORIZON LOAMY SAND 1500 GAL ELEV. 96.82 96.65 9725 SEPTIC TANK ELEV. ELEV. " " " 95.73 ELEV. D -BOX H ELEV. H B HORIZON (6" OF STONE UNDER) TEE SIZES: LOAMY SAND a 44'x 9' INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN GAS BAFFLE 96.4 ELEV. 10 INFILTRATOR QUICK 4 STANDARD CHAMBERS AND 1OYR 5!8 AT TLET TEE 2 END CAPS WITH V OF STONE AROUND SIDES (6' OF STONE UNDER OR 30" AND VAT ENDS (44' x 9' x 8" DEEP) 5.43' MECHANICALLY COMPACTED) 96.5 PERCOLATION RATE: < 2 MINlIN ADJUSTED GROUND WATER ELEVATION = 90.3.AAA.A-i EXISTING WATER GATE BENCHMARK AT PK NAIL ELEVATION = 99.48 99.4 �0 9L F �.5 99 UTILITY 99 EXISTING DWELLING TO BE REMOVED �y1 y AND REPLACED (top fnd = 99.68) 64- BENCHMARKAT CONCRETE BOUND ELEVATION = 99.28 Lilimm `� • m NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 114" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. I 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMEN' CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. I 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3'. 11. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 12. EXISTING CESS POOLS ARE TO BE PUMPED AND REMOVED. APPROVED G3 Cmcc�;F.0WIED p HEALTH DEFT. SITE PLlAN I LOCATION: o h 39 CARRIE LANE, S. YARMOUTH, MA MICHAEL L�:,,. PREPARED FOR: PATRIOT BUILDERS �No. DATE:4-11-08 SCALE: V 20' F �T qNo ,. BASS RIVER ENGINEERING MICHAEL LADt P.L.S. P.O. BOX 1163, EAST DENNIS, MA 02641 508-385-3426 TH-1990-2 99.0 TEST HOLE LOGS ELEV. O/A HORIZON LOAMY SAND CIA HORIZON LOAMY SAND ELEV. ENGINEER: THOMAS McLELLAN, P.E. 12" 10YR 312 98.0 7" 10YR 3/3 98.3 -6 HORIZON B HORIZON WITNESS: AMY VON HONE, R.S. LOAMY SAND LOAMY SAND DATE: 4-10-08 1OYR 5!8 10YR 518 30" 96.5 30' 96.5 PERCOLATION RATE: < 2 MINlIN C HORIZON C HORIZON MEDIUM SAND MEDIUM SAND USGS GROUNDWATER ADJUSTMENT: 2.5Y 714 2.5Y 7/4 WELL: MIW-29, ZONE: A, ADJ.(MARCH): 1.3 120" OBSERVED 89.0 120" OBSERVED 89.0 ADJUSTED GROUND WATER ELEV.= 90.3 1.... GROUNDWATER I Aso 132"l GROUND WATER 88.0 NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 114" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. I 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMEN' CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. I 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3'. 11. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 12. EXISTING CESS POOLS ARE TO BE PUMPED AND REMOVED. APPROVED G3 Cmcc�;F.0WIED p HEALTH DEFT. SITE PLlAN I LOCATION: o h 39 CARRIE LANE, S. YARMOUTH, MA MICHAEL L�:,,. PREPARED FOR: PATRIOT BUILDERS �No. DATE:4-11-08 SCALE: V 20' F �T qNo ,. BASS RIVER ENGINEERING MICHAEL LADt P.L.S. P.O. BOX 1163, EAST DENNIS, MA 02641 508-385-3426