Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2003DESIGN CALCULATIONS NUMBER OF BEDROOMS 9 . OFFICE SPACE 1345SF GARBAGE DISPOSAL UNIT NOT ALLOWED DESIGN FLOW 9 BEDROOMS x 110 GAL/(BR-DA)=990 GPD. 1345sf x 75 GPD/1000sf =101 GPD 4"DIA SCHED 40 MANIFOLD W/4" TEES TO 4" LATERALS TOTAL =1091 GPD 12.5-14.5± EXIS REQUIRED SEPTIC TANK CAPACITY 2182 GAL (MIN). 15.18 FINAL ACTUAL SEPTIC TANK CAPACITY 2500 GAL GRADE MIN. LEACHING AREA REQUIREMENTS --BOTTOM 0.00 GAL/(SF-DA) ----- --SIDE 0.74 GAL/(SF-DA) C LEACHING CAPACITY 13.68 ((25'x6O')xO.74 GAL/(SF-DAY)= 1110 GPD 13.18 - VARIANCES REQUIRED: 310CMR15.212 DEPTH TO GROUNDWATER, 5' REQUIRED, 4' PROPOSED, VARIANCE 1.0'. 310CMR15.211(1) DISTANCE OF CELLAR TO SOIL ABSORPTION SYSTEM, 20' REQUIRED, 16' PROPOSED VARIANCE 4'. E 310CMR15.211(1) DISTANCE OF SOIL ABSORPTION SYSTEM TO PROPERTY LINE, 10' REQUIRED, 5' PROPOSED, VARIANCE 5'. 310CMR15.252(2)f DISTANCE BETWEEN ADJACENT FIELDS, 10 FEET REQUIRED, 4 FEET PROPOSED, VARIANCE 6'. YARMOUTH REGULATION 3.7 DI TANCE SOIL ABSORPTION SYSTEM TO WATERCOURSE, 100' REQUIREDPROPOSED, VARIANCE 42'. + 26.16 STA 26 - / LIMITS- OF -5'--REMOVAL' 1 OF UNSUITABLE MATERIAL 10.00 5 I 25.00 N : 0 L Q Gr PHONE CABLE SERVICES 0 TOF 15.64 GAS & WATER SERVICE 57 +20.49 5 - 4"ID SCHED 40 LATERALS, 3/8" ORIFACES 6'O.C., (REMOVE 3" TOPSOIL/SOD BURRS), STAGGERED AS SHOWN IN PLAN VIEW, LAID LEVEL, 5' 9" CLEAN SAND SPACING BOTTOM LEVEL, PIPES LEVEL 60' x 25' x 6" FIELD PROB. HIGH GROUND WATER ELEV 9.18 WATER TABLE ADJUSTMENT INDEX WELL: MIW 29 ZONE: B DATE: 08-26-03 LEVEL: 8.06 ADJUSTMENT: 2.36' ELEV. OF WATER AT SOIL TEST: 6.82 ADJUSTED WATER TABLE ELEV.: 9.18 -- 2" PEASTONE SEE DETAIL FOR CLEANOUT 14.18 & VENT 3 40 MIL VINYL_ 1 ',T 28 SIDE - 3/4" TO 1-1 /2" )OUBLE MASHED STONE 5.00 5.00 58_ --- __ - 16.82 PROPOSED PUMP CHAMBER SITE PLAN 1" = 20' 76 542.5„e STA 27 Rpt " 4 23 28 3, 93 1 2 5 .,,� PAVED :7D DRIVE I 1.60 ?.42 X1'3.04 EXISTING VENT A EXISTING L( L 13.82 4.0a.." 2.08 13.25 SEPTIC SYSTEM PROFILE NOT TO SCALE ELEV.= 12.07 ELEV 14.18 ELEV 12.5 MIN ELEV 12.2 SOIL TEST DATE OF SOIL TEST 08-25-03 WITNESSED BY BRIAN DUDLEY SOIL EVALUATOR TODD LABARGE PERCOLATION RATE <2 MIN./INCH. OB SER VA TION HOLE ELEV. DEPTH HORIZ SOIL TEXTURE COLOR MOTTLING 6.82; - _ FILL ----- 5.65 63-77 C COARSE SAND 10YR 6/6^ 0 N E WATER AT 63" EL.= 6.82 2g3 g4 VERIFY 4' OF SUITABLE MATERIAL PRIOR TO CONSTERUCTION 9 UNI TS PLUS OFFICE, TOF 15.71 (FACILITY BEING SERVED BY PROPOSED REPAIR SAS) j INSTALL DIVERTER VALVE EXISTING FIELD TO BE ABANDONED 0.53 INVERT 13.79 1.881 'i • DEED BK 13706 PG 65 ASSESSORS MAP 37 PARCEL 76 AREA 3.94 AC± OWNER: ELLAS HOSPITALITY LLP 269 HANOVER ST. SUITE #2 HANOVER, MA 02339 I NORTH MILL POND v� ROUTE 28 LOCUS MAP NOT TO SCALE GENERAL NOTES 1) ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO 310CMR15.00 THE STATE ENVIRONMENTAL CODE TITLE V: MINIMUM REQUIREMENTS FOR THE SUBSURFACE DISPOSAL OF SANITARY SEWAGE, AVAILABLE FROM STATE HOUSE BOOKSTORE 1-617-727-2834, AND TOWN OF YARMOUTH RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SANITARY SEWAGE. 2) CONTRACTOR SHALL VERIFY LOCATION OF EXISTING UTILITIES. CONTACT DIG -SAFE AND LOCAL WATER DEPARTMENT 3 BUSINESS DAYS BEFORE BEGINNING CONSTRUCTION. 3) CONTRACTOR RESPONSIBLE FOR OBTAINING ADEQUATE HORIZONTAL AND VERTICAL CONTROL. 4) CONTRACTOR SHALL VERIFY ALL PLUMBING FLOWS TO PROPOSED SEPTIC TANK, AND SHALL LOCATE ALL OTHER EXISTING SANITARY FACILITIES ON PREMISES NO LONGER USED AND PUMP, AND FILL OR REMOVE SAME IN ACCORDANCE WITH LOCAL REQUIREMENTS. 5) ALL COVERS OF SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. ALL MASONRY UNITS TO BE MORTARED IN PLACE. ALL PVC PIPE TO BE SOLVENT WELDED. 6) UNLESS OTHERWISE SPECIFIED, EXISTING AND FINAL GRADES SHALL REMAIN ESSENTIALLY .UNCHANGED. 7) NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING RESTRICTIONS AND/OR REGULATIONS. OWNER/APPLICANT MUST OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 8) EXCAVATE AND REMOVE UNSUITABLE MATERIAL BELOW THE _ - - - LEACHING INVERT ELEVATION FOR 5' AROUND LEACHING SYSTEM AND REPLACE WITH CLEAN SAND. 9) IF ANY DETAIL OF THIS PLAN IS NOT UNDERSTOOD, CONTACT DESIGN ENGINEER AT 394-1960 OR 432-6360. 10) 48 HOUR NOTICE IS REQUIRED FOR ANY INSPECTION OR CERTIFICATION REQUIRED. 11) SITE LIES WITHIN FLOOD ZONES B&C AS SHOWN ON MAP 250015 0005 D DATED 07-02-92. 12) CONTRACTOR TO RESTORE EXCAVATION OF SOIL TEST CONSISTANT WITH SURROUNDING CONDITONS. A R 0 V E D A \• EE MOM } `= No. 2,DO MASSACHUSETTS. DEPARTMENT OF `QH ENVIRO MENTAL PROTECTION V -_ dafie l® 2ENGINEER STAMP 9/9/3 MI C DETAILS BJY Date DESCRIPTION Drawn Checked R E V I S 1 0 N S SEPTIC SYSTEM REPAIR DESIGN PROPOSED AT 135 ROUTE 28 IN , WEST YARMOUTH SCALE: NOTED DATE: SEP 3, 2003 LA BADGE ENGINEERING & CONTRACTING, INC. 22 MOSS HILL RD. HARWICH, MA 02645 (508) 432-6360 DRAWN BY: BJY CHECKED BY: TAL SHEET 1 OF 2