Loading...
HomeMy WebLinkAbout4 Centerboard Lane - Septic DesignTOP OF FOUNDATION HORIZ -- - 10 FT. MINIMUM FROM OR CRAWL SPACE CLEAN SAND OTT. OTHER ELEV - It It a , I. I 10 FT. MINIMUM PRO ECT LOCATION L ��/ T� /� �j OR,2 D L f1 •✓F"� �'`12.r.� o u TcI b_Z Q OP1.�t�1� CONCRETE LOAM AND SEED 25 A �z 4' SCHEDULE 40 PVC PIPE SCALE JOB N0. SHIN D REVISED C AU E oU G�ToaEK d7, Iq� MIN. PITCH 1/8' PER FT. 2' LAYER OF Y l°x27 RESE! '"D ; �,¢y 1/8' TO 1/2' C WASHED STONE y� 4' CAST IRON PIPE NOTREQUIRED SLAB 01 •b (OR EOUAL� MINIMUM z 1 CU. FT. OF PITCH 1/4 PER FT. j f}" CONCRETE ANCHOR FLOW UNE"7 ELEV. - f 01.1 10' -TMIN. 99, 7� °° 10' ° ELEV. - 5� 17 95o �}6 S 6• ELEV. _ 96.3_ ° ELEv, 8GAS AFFLE ELEV. - 7 DIST RIDUBOX�ON 4 HIGH CAPAgTY INFILTRATORS WITH STONE IN AN (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED /IlA36X to 1 TRENCH FORMATION 3 1 500 GALLON IF MORE THAN ONE wnETa y� SEPTIC TANK (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION ZONE 3/4' TO 1 1/ SYSTEM (SAS) INDEX WAS m cwimvi ADJJST Lor i 3 USGS PROBABLE WATER TABLE ELEV. - SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE( / / TO ) ELEV. - NOT TO SCALE 77- ? 9, %� BOTM OF TEST HOLE ELEV.- [^/111 TroOT DATE OF SOIL TEST , jU r �Zo, I' -)5 SOIL TEST DONE BY SWE_FTS<R ENGINEERING WITNESSED BY It k� EL S OBSERVATION HOLE 1 ELEV.- 0)'q* OBSERVATION HOLE- 2 ELEV.- �7.g PERCOLA11ON RATE �_ MIN./INCH AT 7C' INCHES PERCOLATION RATE - - MIN./INCH DEPTH HORIZ TEXTURE COLOR OTT. OTHER PRO ECT LOCATION L ��/ T� /� �j OR,2 D L f1 •✓F"� �'`12.r.� o u TcI b_Z Q OP1.�t�1� SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 25 A �z DATEALj 44,ST /3 /599 SCALE JOB N0. SHIN D REVISED C AU E oU G�ToaEK d7, Iq� �n Y l°x27 RESE! '"D ; .. 7 C Z CJ�fC.�S /'U WATER ENCOUNTERED AT /2.0' ELEV. - brX-7 LEGEND: EXISTING SPOT ELEVATION 00,0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE -0- TOWN WATER —W CATCH BASIN �®), GAS UNE CLEAN OUT C. CESSPOOL C.P. 0 Uti / REMOVE13 FROM UNDER AND 10. LL UNSUITABL FOR A MINIMU-E MARIAL SHALLM OF 5' AROUND BL ABSORPTION SYSTEM AND BE REPLACED MATH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). - :::LLL 11. A VARIANCE OF 2.0' IS REQUIRED FOR THE TOP OF FOUNDATION TO ^ BE EVEN WITH THE HIGH POINT IN THE ROAD. A NEGATIVE GRADE P OF 3/4' PER FOOT SHALL BE MAINTAINED FOR A MINIMUM OF 15' AROUND THE FOUNDATION. I - Ol 1 j ND 06 ) ' y? _ t � 022 l ._.—L C` �0 IJ \ 0 / 0� Ci I_ FRN/0 0. • FD) ,OfA DEPTH HORIZ TEXTURE COLOR MOTT. OTHER PRO ECT LOCATION L ��/ T� /� �j OR,2 D L f1 •✓F"� �'`12.r.� o u TcI 0-S D SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 `1n 6 DATEALj 44,ST /3 /599 SCALE JOB N0. REVISED C AU E oU G�ToaEK d7, Iq� Y l°x27 RESE! '"D ; .. 7 Z CJ�fC.�S /tIv WATER ENCOUNTERED AT /� ELEV. - 0'7Y DESIGN CALCULATIONS 3 NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW ( 110 GAL/9R./DAY X _ BR.) 33° CAL/DAY REQUIRED SEPTIC TANK CAPACITY 77 ° GAL ACTUAL SIZE OF SEPTIC TANK IKOO GAL SOIL CLASSIFICATION I DESIGN PERCOLATION RATE Ste_ MIN./IN. EFFLUENT LOADING RATE 0.74 GAL/DAY/S.F. ux3 { Y77r S SO FT. LEACHI�NNG CAPACITY (AREA X RATE) 3S/'O GAL./DAY Yr7Y,3X 0,7Y 3S/b RESERVE LEACHING CAPACITY GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATER. IV SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF r`1�� RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE 2, ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO - WITHIN 8' OF FINISHED GRADE 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETMIWI NAMON FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY. EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE' AT 1-858-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. G Q PARCEL IS IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL CUM AS�' APPROVED: BOARD OF HEALTH wN 1D L-- �- ,F I7 AR oATF AGENT NG p2/Grwpo 2?n \ o b�L R yi s L Locos Ro�rF !o PROPOSED SEPTIC DESIGN FOR %�u jcl�J (fZ-JS7-;/4uC fIo �✓ PRO ECT LOCATION L ��/ T� /� �j OR,2 D L f1 •✓F"� �'`12.r.� o u TcI SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 DATEALj 44,ST /3 /599 SCALE JOB N0. REVISED C AU E oU G�ToaEK d7, Iq� SHEET ( OF � •nnw e.�tT7lP� hIN�ICfOI LOCATION MAP RESE! '"D ; .. NG