Loading...
HomeMy WebLinkAbout132.123 - Title 5 Site Plan (Copy 6)I t TOP FNDN." AT EL, 26.0' SYSTEM PROFILE ACCESS COVER TO WITHIN 6" OF FIN. -GRADE (NOT TO SCALE) f ACCESS COVER (WATERTIGHT) TO MINIMUM .75' OF COVER OVER PRECAST WITHIN 6" OF FIN. GRADE RUN PIPE LEVEL .•• Q_ FOR FIRST 2' PROPOSED 1500 Ir GALLON SEPTIC 22 25' 22.54' TANK (H- 10) GAS r�_ ....� BAFFLE 21.451.28' o MIN ( % SLOPE) 6" CRUSHED STONE OR MECHANICAL 8 COMPACTION. (15.221 [21) b' DEPTH OF FLOW = 4 (2_5 % SLOPE) ( % SLOPE) DRAINAGE MANHOLE - COVER i C+� i i i 2 .57 �// 44,78 00-095 2% SLOPE REQUIRED OVER SYSTEM 2" DOUBLE WASHED PEASTONE 3/4" TO 1 1/2" DOUBLE WASHED STONE TEE SIZES: INLET DEPTH = 10" OUTLET DEPTH = 14" LEACHING FOUNDATION— 21' — SEPTIC TANK 31' D' BOX 13' FACILITY t24A0 / Q4' / 4� o/ , 24.91 / C/ o ry. LOT 2 15,875 S + .38 W / 25.14 2 BENCHMARK CONCRETE BOUND ELEV = 25.0' 5' REMOVAL OF UNSUITABLE SOIL REQUIRED AROUND PERIMETER OF LEACHING FACILITY, DOWN TO SUITABLE °OIL LAYER. REPLACE WITH CLEAN MED. SAND. 19.17' 7.97' 11.2' TEST HOLE LOGS ENGINEER: MICHAEL FARIA, SE WITNESS: KELDA GORMAN, SE _ DATE: 5/10/00 PERC. RATE _ < 2 MIN/INCH CLASS I SOILS P# _. 0„ 4 DISTURBED Ap 48" C MS 2.5Y 7/4 ELEV. 23_2' Q' 19.2' 48" 144" L 11`2' NO WATER SEPTIC DESIGN: (GARBAGE DISPOSER Is NOT ALLOWED ) DESIGN FLOW: 4— BEDROOMS (110 GPD) = 44o GPD USE A 440 GPD DESIGN FLOW SEPTIl, IA,.K: 440 U'D 1, 2 = 880 +21.4n USE A _1500 GALLON SEPTIC TANK LEACHING: SIDES 2(33.5 + 12.83) 2 (,74) = 137 .3l BOTTOM: 33.5 x 12.83 (.74) = 318 TOTAL: 615 S.F. 455 GPD USE (3) 500 GAL. LEACHING CHAMBERS (ACME OR EQUAL) WITH 4' STONE ALL AROUND LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR — 100 — EXISTING CONTOUR BOARD OF HEALTH MA APPROVED DATE w DISTURBED Ap C MS 2.5Y 7/4 24.0' RTE 6A i \ LOCATION MAP NTS ASSESSORS MAP 132 PARCEL 123 ZONING DISTRICT: R 40 (CURRENT) YARD SETBACKS: FRONT = 30' SIDE = 20' ^, REAR = 20' PLAN REF. — 435/39 FLOOD ZONE: C 144" 1 12.0' 1 ENCOUNTERED NOTES' 1. DATUM IS APPROXIMATED FROM QUAD i. 2. MUNICIPAL WATER IS AVAII ARI F 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. I0?n Mlhlr 17nq. Al nr.I.-A^T Iu. 417C 1-, nt nAIL 1( ,i 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6 CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT 1 TO BE USED FOR ANY OTHER PURPOSE. 8. ?IPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 1C, WATER TEST D'BOX FOR LEVELNESS TITLE 5 SITE PLAN _ OF 42 CENTER STREET _ IN THE TOWN OF: _ YARMOUTH (PORT) PREPARED FOR: VARN PHILBROOK 20 0 20 40 60 SCALE: 1 20 DATE: OCTOBER 5, 2002 off 508-362-4541 fo* 508 362-9880 RI al +29.44 1 +21.17 down cape engineering, inc. A' "fif V .yqi• /so '. ARNE H. 5G tom, fq\ $ OJALA y RNE ApNF CIVIL ENGINEERS K v H. IL � LAND SURVEYORS OJAI 939 main St.armouth, ma 02675 -- 111--- — Y BARN JI. OJA P.L.S. —DA TF, -