Loading...
HomeMy WebLinkAbout140.30 - Proposed Septic Design (Copy 4)TOP OF FOUNDATION ELEV. SLAB ELEV. = 14.50 510 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER FT. ELEV. ELEV. CONCRETE COVERS SOIL TEST DATE OF SOIL TEST QQCEMBER 1¢,2Q� SOIL TEST DONE BY FArI; SURVEyINQ_ WITNESSED BY A. VQN HANE_ 1 OBSERVATION HOLE 1 ELEV.=-14.25 OBSERVATION HOLE 2 ELEV.= 13.91 '.NIMUM FROM ^CELLAR r^.^^ PERCOLATION RATE -2--l- MIN./INCH AT ?Bv INCHES PERCOLATION RATE _-2-___3__ MIN./INCH IN C HORIZON 4" SCHEDULE 40 PVC PIPE MIN. PITCH 1/8" PER FT. 1....... L// `ELEV. = 17_85 iE " VV - � � LEVEL BAA S ELEV. _ _ 17.75_ 6" SUMP ELEV. DISTRIBUTION ELEV. _ BOX CLEAN SAND INSPECTION PORT LOAM ANDSEED 2" LAYER OF 1/8" TO 1/2" OB MAX WASHED STONE VENT 18.83 MIN. NOT REQUIRED _ z s 18.08 o u a a 10" ELEV. = _18.75 tg 6 HIGH CAPACITY INFILTRATORS /(TO BE PLACED ON FIRM BASE) WITH STONE IN AN a 4 FEET 14 INCHES TO BE WATER TESTED 11' X 48' X 10* TRENCH FORMATION .. 4.10 5 FEET 19 INCHES IF MORE THAN ONE OUTLET i 6 FEET 24 INCHES 1500 GALLON WELL SOW 252 / 7 FEET 29 INCHES (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION LO 8 FEET 34 INCHES SEPTIC TANK � ZONE A ?? 3/4" TO 1 1 /2" CLEAN Yom+ 2 INDEX 47.3 A/ I 50 32g / Bx?, DOUBLE WASHED STONE SYSTEM JTEM tSAS, n ADJUST 1.4 f / FREE OF FINES k SILT USGS PROBABLE WATER TABLE ELEV. = _12.65 _ / SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE (12/16/02) ELEV. = 11.25 NOT TO SCALE BOTTOM OF TEST HOLE ELEV. = 91__ I 70p39 I ( OR LL m I m WAL UT 1 S�p \\\ I SEE REST04ATION PLANp DECK I p7jCpTG(ON FILED HEREWITHI BUT SEPERATE x x PROPOSED DWELUko II 11.70 4 BEDROOMS I I I � D• BOX „ � JS' / i i I 0 � 42{7p I \ F \ S LIMIT Op i h \ I \ IOR OVERDIG l 1 ►g / \ o 1500 GALLON c\i I \ \ 50.00 \ \SolLSEPTIC TANK TEST 2-� �� \ i Y.T r \ \ ` 0,13.9` \ I S9 2 1 \ J \ \ \\ I \ co S p O ` SOIL Ami D. 801 � ,`� / TESTI 014.25 \\ \\ \ oh \ Fac \ \ \ \ y 7 \ \ OAC\\\\ So 14 LOT 1 \\ \\ �� �' \ l \ 44 1 95 S F \, \\ \ /// i \ \� \ SLIMIT OF IG DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-4 0 FIBRIC \ NO 4-11 A LOAMY SAND 10YR3/3 A LOAMY SAND 11-20 B LOAMY SAND 10YR4/6 16-24 0-120 Cl LOAMY 10YRS/8 ► \ - MEDIUM SAND 10YR5/8 REV. WATER ENCOUNTERED AT 3EELEV. = _11.95 ` \ \ ��5 / � \ ► \ SOIL \ TEST 2 / 10.17 \10.62 \ ,\ \ \ \�► \M /// 10.61 )\ \� ► / / LEGEND: \I ��\ \ \ ,�► \► // / EXISTING SPOT ELEVATION :0.0 EXISTING CONTOUR ----00---- FINAL SPOT ELEVATION 0.0 \\ ��-/ ► FINAL CONTOURTP SOIL TEST LOCATION UTILITY POLE co� TOWN WATER =WSW CATCH BASIN �❑ j GAS LINE C G- CESSPOOL \_7 CLEANOUT C.O. \ 10. \\ // ► \► L / \ now r. • 2( DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-2 \ \ 1 i PROJECT LOCATION LOT2 159 CENTER ST... YARM UTHPi7 ORT 2-16 A LOAMY SAND 10YR3/3 // \ ti9 I <`.\`► I 16-24 ^ry \\ I \► I / \ \ 'ss I ► \ SOIL TEST 1 10YR5/8 REV. SCALE 1 16.64 MEDIUM SAND I / \ S/L� \ �► 18 \ -- -- / 21.03 ao., e REv. APR. 22, 2005 F LOCATION MAP I REV. OCT. 13,2004 SHEET 1 OE 1, v, / �► ,/ v ` \ \ ��5 / � \ ► \ SOIL \ TEST 2 / 10.17 \10.62 \ ,\ \ \ \�► \M /// 10.61 )\ \� ► / / LEGEND: \I ��\ \ \ ,�► \► // / EXISTING SPOT ELEVATION :0.0 EXISTING CONTOUR ----00---- FINAL SPOT ELEVATION 0.0 \\ ��-/ ► FINAL CONTOURTP SOIL TEST LOCATION UTILITY POLE co� TOWN WATER =WSW CATCH BASIN �❑ j GAS LINE C G- CESSPOOL \_7 CLEANOUT C.O. \ 10. \\ // ► \► L / \ now r. • 2( DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-2 0 FIBRIC NO PROJECT LOCATION LOT2 159 CENTER ST... YARM UTHPi7 ORT 2-16 A LOAMY SAND 10YR3/3 16-24 B LOAMY SAND 10YR4/6 4-120 Cl LOAMY 10YR5/8 REV. SCALE 1 MEDIUM SAND REV. AUG. 27, 2004 WATER ENCOUNTERED AT __44" ELEV. = __1Q22 DESIGN CALCULATIONS NUMBER OF BEDROOMS 4 GARBAGE DISPOSAL UNIT _ O TOTAL ESTIMATED FLOW ( 110 GAL/BR./DAY X 4 BR.) _.}}Q_ GAL./DAY REQUIRED SEPTIC TANK CAPACITY --O$Q_ GAL. ACTUAL SIZE OF SEPTIC TANK 1500 GAL. SOIL CLASSIFICATION __t__ DESIGN PERCOLATON PATE S5- MIN./IN. EFFLUENT LOADING RATE __0.7_4_ GAL./DAY/S.F. LEACHING AREA 828_33 SO. FT. (11X48)+(59X2X10/12) LEACHING CAPACITY (AREA X RATE) A" GAL./DAY 628.33 X 0.74 RESERVE LEACHING CAPACITY M3,R GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. - 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS, 4. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE, ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP 140 AS PARCEL 10. ALL UNSUITABLE. MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH SAND AS SPECIFIED IN 310 CMR 15.255:(3). 11. A NEGATIVE GRADE OF 3/4- PER FOOT SHALL BEMAINTAINEDFOR A MINIMUM OF 15' AWAY FROM THE FOUNDATION. 12. A VARIANCE OF 0.61' IS REQUIRED BECAUSE THE TOP OF FOUNDATION IS LESS THAN 2' ABOVE HIGH POINT IN ROAD. 13. GUTTERS, DOWNSPOUTS, AND DRYWELLS REQUIRED. 14. ALL DISTURBED AREAS ARE TO BE REVEGETATED. 15. HAYBALE AND SILTFENCE WORKLIMITS ARE TO BE IN PLACE PRIOR TO ANY EXCAVATION COMMENCING ON SITE. APPROVED: BOARD OF HEALTH DATE AGENT \\ \ ``C.52 (} HOMER'S DOCK I,�CUs m I m q398-3922 tiT PROPOSED SEPTIC DESIGN FOR DUBLIN CONSTRUCTION PROJECT LOCATION LOT2 159 CENTER ST... YARM UTHPi7 ORT S EI? MVGLC9gi✓RD"�G 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 SOUTH DENNIS, MASS. 02660 DATE FEB. 6, 2004 REV. SCALE 1 REV. AUG. 27, 2004 JOB N0. 5892-02 REV. I REv. APR. 22, 2005 F LOCATION MAP I REV. OCT. 13,2004 SHEET 1 OE 1,