Loading...
HomeMy WebLinkAbout150.18.1 - Design for Sewage Disposal SystemSOIL TEST PIT DATA: _ --- \\ \�\ LEACHING DETAIL: NOT TO SCALE uN �Q \ J! 4" PVC `. 42.5 TEST PIT -#1-- GRD. EL. 78.7 EST. HIGH GW. N/A TEST PIT -#2-- GRD. EL. 71.2 EST. HIGH GW. N/A I 3 12" --"/" TUT" 1 12" B 0 1 B__. MEDIUM SAND ND I I MEDIUM SAND ND 1OYR 6/3 1OYR 6/3 NO G. WATER 120 " A 1 N G. WATER I " 132 EL = 68.7 EL = 60.2 - DATE: DATE: 12/17/97 12/17/97 TEST BY: TEST BY: DICK O'HEARN(DUMAS) DICK O'HEARN(DUMAS) WITNESSED BY: WITNESSED BY: M. BROCK (BARN. CNTY) M. BROCK (BARN. CNTY) PERC. RATE: PERC. RATE: _MIN./INCH -2 MIN./INCH SOIL EVALUATOR SOIL EVALUATOR TED DUMAS TED DUMAS SOIL CLASS: SOIL CLASS: 1 1 L.T.A.R. L.T.A.R. 0.74 G.P.D./SQ.FT. -0.74 G.P.D./SQ.FT. DATUM: NO OBSERVED GROUNDWATER VERTICAL DATUM: ASSUMED BENCH MARK USED: TAG BOLT ON HYDRANT ELEVATION 102.5 PROFILE: NOT TO SCALE fOP FOUNDATION CONCRETE COVERS TO WITHIN EL.=77.0 A 6" OF FINISHED GRADE. 5 OUTLET DIST. BOX SEPTIC TANK INVERT ELEVATIONS: / TOP OF FOUNDATION 77.8 A 4" INVERT AT BUILDING 74.55 B 4" INVERT AT SEPTIC TANK (IN) 74.25 C 4" INVERT AT SEPTIC TANK (OUT) 74.00 D 4" INVERT AT DIST. BOX (IN) 73.90 E 4" INVERT AT DIST. BOX (OUT) 73.73 F LANE INVERTS AT LEACHING FACILITY: PREPARED FOR: LEONARD & MARIA D'Of 4" INVERT AT BEGINNING YARMOUTH PORT MA 02675 OF LEACHING CHAMBER 73.5 G CHECK: M. DIBB ELEVATION AT BOTTOM FIELD: D. GAZZOLO /J. FILE NO. 8807-SEP.DWG OF LEACHING CHAMBER 71.5 H SHEE NO OBSERVED GROUNDWATER 60.2 J BOTTOM OF HOLE X. INDICATES v_ ESTIMATED SEASONAL HIGH GROUND WATER INDICATES OBSERVED GROUND WATER RR INDICATES PERC. TEST INDICATES UNSUITABLE MATERIAL PIPE 1p / cr w3m IN RECOMMENDED DUE TO RECOGN ADVERSE IMPACTS TO THE LEA FACILITY. \ ANY FIELD CHANGES THAT MA) REQUIRED. Cl ASIC 657 Main Street, (RT. 28) Un W. Yarn outh Massachusetts 02673 508 778 f PROJECT TITLE: DESIGN FO SEWAGE DISP( SYSTEM #17 CHASE GAR[ LANE YARMOUTH P PREPARED FOR: LEONARD & MARIA D'Of 68 MARSH SIDE DR YARMOUTH PORT MA 02675 (508 375-6448 DATE. APRIL 11, 2005 COMP. D K. CHECK: M. DIBB DRAWN: K. HEALY FIELD: D. GAZZOLO /J. FILE NO. 8807-SEP.DWG N LEACHING JOB NO. 4-8807.00 SHEE 45.0 PLAN VIEW - LEACHING CHAMBERS \ - -67- - - - - - - - \ (� O� / / / 11 / / / ! , 11 \V1 1 f/ LOAM & SEED DISTURBED AREAS !S/ ,off. 9 / J 11 /' 1 1 \\ ^�f 3' MAX. COMPACTED FI L 36" MAXIMUM,12"MINIMUM CA° i/ I I ) f 1 �/ �/ / 00° 0°0 3" LAYER 0 C� O PEASTONE i56t".'-10" 11 `68'\ \ // /'' ,/ 9• �` ) I 1 / \\1 % r' ! T 0 REMOVE W34" 24" UNSUITABLE EFFEC. 0 MATERIAL FOR R I IT 21 DEPTH 0 35' ALL AROUND p FUTUR/4" - 1 1/2" ij 56" WASHED STONE i POOL / / I I \ i I 12'-10" EAC 4 // / I �\ I ; -22'-10" p• .-� 70.5 \ / /i I I CROSS-SECTION OF CHAMBER SO, / _ - - - A -\OU`� 1 V I I I { /I I •� S N � DESIGN CRITERIA: 1S N Ck ��O° 1 DESIGN FLOW: ' - \ P OPOSED �l \ ; S PRo�OSED 1 500 5 BEDROOMS AT110G.P.B./D 550 G.P.D. 15 B TOLLNG EW p 5 (GAL. (SEPTIC TANK TOF - O I b PIROPOSED D -BOX / r'' \ s' �' � `�-•••... � � ..� fig. -� ' � 77.8 1 I \ 1 I 1 1 _ ----72_ - - ! / ' � -� -� '/'i / "1_ .� Lo !! c'!��SETS _\ P�REOWP. J `\TGPRALAB6` / f 2� bo - _i 1 I REQUIRED SEPTIC TANK: 550 x 200% = 1100 GAL. 1 SEPTIC TANK PROVIDED: = - 00 AL. ED: SIZE OF LEACHING FACILITY REQUIR DESIGN PERC. RATE: <2 MIN./ INCH 1 1 i LONG TERM APPL. RATE 0.74 G.P.D/S.F. �� x Q /{� %p ill 550 GPD r 0.74 GPD/SF = 744 S.F. o SIZE OF LEACHING FACILITY PROVIDED: m \ ' I 1 I / I (I / v `SET !r % 1 USE H-10 C❑NC CHAMBERS LEACHING CHAMBERS(5 UNITS) 12'X2'X45' FIRST PIPE LENGTH ! / ! ^o, /\. ./ / / - - \ \ �$ \ \ \ \ \\ \\�� 5 /\/ I � ! / TO BE SET LEVEL S N / / \ \ ?� \ \ I / FOR MIN. 2' j ! / / / \ \ \ \ i I f / i SIDEWALL = 2(12.83'+45') X 2 = .231 FINISH GRADE j / / / ! S T/ \ $ \ ` \ \ \ I / ` \ TPI i 1 I �' - ' EL=76.8-76.3 j / / // \� 3\ \ \ \� I i J ` l/ ! BOTTOM - 12.83 X 45 808 S.F. 4' PVC SCHPVC SCH 40�� ! ! / J J / �"�•..� $¢ \ \ / LEACHING CHAMBER ! // / ' / // � �~� `\ \\ \\ \� \\ \\ ,/\\ % I ! JI/// / ` // !� _ \ \ \ / / / 808 S.F x 0.74 GPD/SF - 598GPD � PLAN VIEW ' J' � ! �, �.� °\ `\ °\ �\\ \\ \\ I ; !�� , RH !' / J I! \ L \\ \ \ \ \ \ I , �° ` 1 / 1 ! PROPOSED 12.8' X 45' j / ! ! � \ \ \ \ \ , ! , , / // SO,ft ABSORPTION LOCUS INFORMATION n' SEPARATION SCALE: 1 - 20 FEET J j // J -,.. \ \\ �\ \\ / / /// / / SXSTEM { LIMIT OF EXCAVATION EST. HIGH GROUNDWATER 0 10 20 40 FT. / 1 \\ \ �\ �� j/ i/� 1 (SEE 40TES 5',& 6) CURRENT OWNER: LEONARD & MARIA D'ORLANDO d - ` ` / \ \ \ ^ \\ \ \ �cPp. \ \ SE J) 11 ! / / , it / TITLE REFERENCE: CTF. 176331 NOT TO SCALE /' \� \ ` \ �� \ t I ' 11 / l !1 l I PLAN REFERENCE: 31551-E, SH -3 DISTRIBUTION BOX DETAIL. N \ / ASSESSORS MAP: 150 N0. OF OUTLETS: cJ / \ \ \ \ \ 1 111 1 l PARCEL: 18.1 NOTES: ` i 1. DIST. BOX TO WITHSTAND H-10 LOADING FINISHED GRADE / / \ \ \ \ \ \ I j ZONING DISTRICT: FROM UNLESS UNDER PAVEMENT, DRIVES OR REMOVABLE 2- WALLS \\ \\ \ \\ �\ I OPOSEDI UTILITIES( SETBACKS: FRONT 30' TRAVELED WAYS WHEREIN 11-20 LOADING OAK Tp BE REIV�OVED J SIDE 20' SHALL APPLY. T 2. PROVIDE INLET TEE OR BAFFLE WHERE SLOPE OF PIPE EXCEEDS 008 FT./FT OR IN PUMPED SYSTEM. 15 1/2- 3. FIRST TWO FEET OF PIPE OUT OF DIST. BOX TO BE LAID LEVEL - 4. ALL PIPE CONNECTIONS AID CONCRETE COVER I 1\ \ \ \ \ i / i l REAR 20' .v:.v..+.v:.v..+.v:•v....;:.v.:: T PVC BAMER/ \ \ I I i I , MINIMUM LOT SIZE: 40,000 S.F. 15" \\ \�\ \\ \ \\ _ , p0 I I EXISTING LOT AREA: 50,2371 S.F. PROPOS GAS LINE S/ I I I ! OVERLAY DISTRICT: OLD KINGS HIGHWAY 6' •. 5,5' OUTLETS 1 NITROGEN SENSITIVE I �'° n4�c 4,°A�� $°Sc �°ec�° T��° L 2- 1 / CONSTRUCTION SHALL BE NATERTIGHT. - / \ \ \ / \ \ \ i\ j / / ZONE: NOT A ZONE II 1•-• BOTTOM ON LEVEL / FEMA FLOOD 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. 7 1/2 STABLE BASE 6 MIN. 3/4" TO �K11t,�'' \��\\ \ \ \\\ \ Pf2b�OSEDE WATE LINE!! 00,'.. i / ZONE DISTRICT: "C" DATED 7/2/92 PLAN VIEW CROSS-SECTION STONE BASE ?,,CRAIG A. 4� FIELD w - - \\\° \ °�� i I PIN TO/OE REMOVED] ^i+ No.38039 I . SEPTIC TANK DETAIL: 1,500 GALLON NOT TO SCALE (/�/ o ° Zz NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON. REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE, TEES TO BE CENTERED UNDER MANHOLE COVER. 2. SEPTIC TANK TO WITHSTAND H-10 LOADING . UNLESS UNDER PAVEMENT, DRIVES OR LOCUS PLANN❑ SCALE TRAVELED WAYS, WHEREIN H-20 LOADING - - - \ , \ \p SHALL APPLY. \\ ' 3. ALL PIPE CONNECTIONS AND CONCRETE2/24' DIA CONCRETE MANHOLES CHASE GARDEN `\ C EEK n \\ \ CONSTRUCTION SHALL BE WATERTIGHT. W METAL HANDLES BROUGHT VARIANCES REQUESTED. 4. FILL ALL UNUSED KNOCKOUTS WITH TO 6" OF FINISH GRADE PRM N MORTAR. TEE M.H. TO BE 0 OPENING 12* MIN. BRP`{ TOWN OF YARMOUTH �9'� �3' TO ALLOW THE TOP OF FOUNDATION (77.8) TO BE 22' RAISE M.H W/. 4' , I� BELOW THE HIGH POINT (99.2) IN LIEU OF THE 2' ABOVE REQUIRED. lF 1o' -s- SEWER BRICK e . 10,-0' do MORTAR + 12- NQS Q .c SN 418 9F\ \ \ \ ` / c \SLT P NORMAL WATER LEVEL W � �, Z OF \ \ t 3, Z Z ��� \ \ \ h� \ I R=209.730` PRECAST SEPTIC TANK 10" 14" Q `' p"t MARK D. v, \ �; L=3.90' `V - J f o N i DEBET \ \ Q` e INLET TEE 1 5'-1' L❑CUS Z Q G� d CIVIL yl Q y No.45937 O O 5'-2" 4'-6' ` 4'-0' MIN. W BM a OLIQUID DEPTH 5'-8'FLOOR PLANS: Q LLJ SEE ATTACHED FLOOR PLANS ``� �F' �` "'�o� N 6 A /lL •� ]DRAINAGE e BOTTOM ON LEVEL STABLE BASE °da 3" / / PLAN VIEW s" MIN. 3/4' To d �� %�si��/ ` ! EASEMENT/ 1 1/2" STONE CROSS-SECTION VIEW / S/N° BOXES @DMH / ENCHMARK TAG BOLT ON HYDRANT. ELEV 102.5 I 1_ 8/22/05 RELOC. GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AN MATERIALS SHALL CONFORM TO D.E.P TITLE 5 AND LOCAL BOAR[ OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAV OR TRAVELED WAY SHALL BE SC 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY N ANY KNOWN WELLS PROPOSED W 150' OF ANY KNOWN LEACHING 1 5. WITHIN LIMIT OF EXCAVATION REI ALL TOPSOIL, SUBSOIL AND 0TH IMPERVIOUS MATERIAL. 6. REPLACE ALL EXCAVATED MATO CLEAN GRANULAR SAND, FREE FROM MATERIAL AND DELETERIOUS SUBSTA MIXTURES AND LAYERS OF DIFFEREN OF SOIL SHALL NOT BE USED. THE I NOT CONTAIN ANY MATERIAL LARGEF TWO INCHES. A SIEVE ANALYSIS, USI SIEVE, SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL. U BY WEIGHT OF THE FILL SAMPLE MA RETAINED ON THE 94 SIEVE. SIEVE r ALSO SHALL BE PERFORMED ON THE OF FILL SAMPLE PASSING THE #4 SI ANALYSES MUST DEMONSTRATE THA MATERIAL MEETS EACH OF THE FOLI SPECIFICATIONS: 1007 MUST PASS #4 SIEVE (4.75 mm EFFECTIVE PARTICLE 107-100% MUST PASS #50 SIEVE (0.30 mm EFFECTIVE PARTICLE 7-20% MUST PASS #100 SIEVE (0.15 mm EFFECTIVE PARTICLE %57 MUST PASS #200 SIEVE (0.075 mm EFFECTIVE PARTICL 7. EXISTING UTILITIES WHERE SHOW IN THE DRAWINGS ARE APPROX THE CONTRACTOR SHALL BE RE SIBLE FOR PROPERLY LOCATING COORDINATING THE PROPOSED I STRUCTION ACTIVITY WITH DIG AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THI EXISTING UTILITY SYSTEM IN SE DIG -SAFE SHALL BE NOTIFIED I THE STATE OF MASSACHUSETT! STATUTE CHAPTER 82, SECTION AT TEL 1-888-344-7233. THI ENGINEER DOES NOT GUARANTE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STE ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND TAKEN FROM RECORD PLANS. 1 CONTRACTOR SHALL VERIFY SI2 LOCATION AND INVERTS OF UTI AND STRUCTURES AS REQUIRE[ TO THE START OF CONSTRUCTI 8. THIS SYSTEM IS NOT DESIGNED THF (ICF nF n rAQRGrF nmkir A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGN ADVERSE IMPACTS TO THE LEA FACILITY. \ ANY FIELD CHANGES THAT MA) REQUIRED. Cl ASIC 657 Main Street, (RT. 28) Un W. Yarn outh Massachusetts 02673 508 778 f PROJECT TITLE: DESIGN FO SEWAGE DISP( SYSTEM #17 CHASE GAR[ @DMH / ENCHMARK TAG BOLT ON HYDRANT. ELEV 102.5 I 1_ 8/22/05 RELOC. GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AN MATERIALS SHALL CONFORM TO D.E.P TITLE 5 AND LOCAL BOAR[ OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAV OR TRAVELED WAY SHALL BE SC 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY N ANY KNOWN WELLS PROPOSED W 150' OF ANY KNOWN LEACHING 1 5. WITHIN LIMIT OF EXCAVATION REI ALL TOPSOIL, SUBSOIL AND 0TH IMPERVIOUS MATERIAL. 6. REPLACE ALL EXCAVATED MATO CLEAN GRANULAR SAND, FREE FROM MATERIAL AND DELETERIOUS SUBSTA MIXTURES AND LAYERS OF DIFFEREN OF SOIL SHALL NOT BE USED. THE I NOT CONTAIN ANY MATERIAL LARGEF TWO INCHES. A SIEVE ANALYSIS, USI SIEVE, SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL. U BY WEIGHT OF THE FILL SAMPLE MA RETAINED ON THE 94 SIEVE. SIEVE r ALSO SHALL BE PERFORMED ON THE OF FILL SAMPLE PASSING THE #4 SI ANALYSES MUST DEMONSTRATE THA MATERIAL MEETS EACH OF THE FOLI SPECIFICATIONS: 1007 MUST PASS #4 SIEVE (4.75 mm EFFECTIVE PARTICLE 107-100% MUST PASS #50 SIEVE (0.30 mm EFFECTIVE PARTICLE 7-20% MUST PASS #100 SIEVE (0.15 mm EFFECTIVE PARTICLE %57 MUST PASS #200 SIEVE (0.075 mm EFFECTIVE PARTICL 7. EXISTING UTILITIES WHERE SHOW IN THE DRAWINGS ARE APPROX THE CONTRACTOR SHALL BE RE SIBLE FOR PROPERLY LOCATING COORDINATING THE PROPOSED I STRUCTION ACTIVITY WITH DIG AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THI EXISTING UTILITY SYSTEM IN SE DIG -SAFE SHALL BE NOTIFIED I THE STATE OF MASSACHUSETT! STATUTE CHAPTER 82, SECTION AT TEL 1-888-344-7233. THI ENGINEER DOES NOT GUARANTE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STE ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND TAKEN FROM RECORD PLANS. 1 CONTRACTOR SHALL VERIFY SI2 LOCATION AND INVERTS OF UTI AND STRUCTURES AS REQUIRE[ TO THE START OF CONSTRUCTI 8. THIS SYSTEM IS NOT DESIGNED THF (ICF nF n rAQRGrF nmkir A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGN ADVERSE IMPACTS TO THE LEA FACILITY. 9. THE ENGINEER IS TO BE NOTIFIE ANY FIELD CHANGES THAT MA) REQUIRED. Cl ASIC 657 Main Street, (RT. 28) Un W. Yarn outh Massachusetts 02673 508 778 f PROJECT TITLE: DESIGN FO SEWAGE DISP( SYSTEM #17 CHASE GAR[ LANE YARMOUTH P PREPARED FOR: LEONARD & MARIA D'Of 68 MARSH SIDE DR YARMOUTH PORT MA 02675 (508 375-6448 DATE. APRIL 11, 2005 COMP. D K. CHECK: M. DIBB DRAWN: K. HEALY FIELD: D. GAZZOLO /J. FILE NO. 8807-SEP.DWG DWG NO. 5616-01 JOB NO. 4-8807.00 SHEE