HomeMy WebLinkAbout38 Charles Street - Site & Sewage Plan 2L I;p ASSESSORS MAP: 70
CQ PARCEL: 116
P�
LOCUS
CURRENT ZONING: R-40 1952 SUBDIVISION)
C BUILDING SETBACKS:
F: 30' S: 20' R: 20'
y FLOOD ZONE: C, B & A7 (EL9)
y
2B f✓
LOCATION MAP
LOT AREA
(0,86 ± 405 �) E E �
ST R as
L 5.
EDGE OF PAVE
no _- --
26
,
26 \ 24
BENCHMARK TOP OF
CONCRETE BOUND N
ELEV- 2793' > \
4 1
'.
22' , L�
VENT -� ko-1 t \ pit
20
19 i
2
PROPOSED ADDITIONS G
(SQUARE OFF BREEZE -WAY)
il�-
G
EXISTING COTTAGE
,22
20
18
14
-12
IN 1, PROPOSED ADDITION
VIP
14
,
100' FROM BVW 12
PROPOSED ADDITION f0
(DECK)
WORK LIMIT LINE -�
(SEE NOTE 12)
EDGE OF BORDERING
VEGETATED WETLAND
KEY:
EXISTING CONTOUR: - -
PROPOSED CONTOUR: - --....... ..... •
EXISTING SPOT ELEVATION: 25.5
PROPOSED SPOT ELEVATION: 25
TEST HOLE: •-
UTILITY POLE: -O-
FENCE LINE: - -
HYDRANT: -6-
RETAINING WALL:
TREE:
DM # �9_Q96
TEST HOLE LOGS
ENGINEER: THOMAS McLELLAN, P.E.
WITNESS: KELDA WELSH
DATE: 9-14-99
PERCOLATION RATE: < 2 MIN/IN
TH-1
22D
O
HORIZON L AMY SAND
11" fOYR 3/2 21,1
B HORIZON
LOAMY SAND
24" fOYR 6/8 20.0
C HORIZON
MED -FINE SAND
2.5Y 7/2
13r 1110
NO GROUND WATER ENCOUNTERED
SEPTIC SYSTEM DESIGN
FLOW ESTIMATE.'
. BEDROOMS AT -110 0 4L/DAY/BEDROOM =SM CAL/DAY
SEPTIC TANK:
660 GAL/DAY x 2 DAYS = 1320 CAL
USE 1500_CALLON SEPTIC TANK
NOTES:
1. VERTICAL DATUM: NGVD
2. MUNICAPAL WATER IS AVAILABLE.
S. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM.
4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20
LOADING SPECIFICATIONS.
5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE).
6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL.
7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE
USE OF A GARBAGE DISPOSAL.
8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE
STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL
HEALTH REGULATIONS.
9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR
TO CONSTRUCTION.
10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO
EXCEED 3.0'.
11. AN ELECTRIC PERMIT IS REQUIRED PRIOR TO INSTALLATION OF
PUMP SYSTEM.
12. WORK LIMIT LINE TO BE DOUBLE STAKED HAY BALES OR SILT FENCE.
LINE TO BE STAKED PRIOR TO ANY SITE WORK.
13. ROOF RUN-OFF TO BE' DIRECTED TO DRYWELLS OR STONE TRENCHES
AT DRIP LINES.
14. ALL DISTURBED AREAS TO BE REVEGETATED OR MULCHED UPON
COMPLETION OF PROJECT.
15. EXISTING CESS POOLS ARE TO BE PUMPED AND FILLED WITH SAND
OR REMOVED.
16. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW.
LEACHING AREk
USE 5- 500 GALLON C.4AYBERS WITH 4' OF STONE
ALL AROUND (50.5x 12-8' x 2' DEEP)
SIDE AREA 50.5 + 1<8)2 x 2 - 253 (.74) = 1¢7 GAL/DAY -
BOTTOM AREA 50.5 12-8'- 646 SF (74) - 478 GAL/DAY
CAPACITY a 665 CAL/DAY
SEPTIC SYSTEM, SECTION
-- COVERS FI HIN 12" OF
__ �•� ((O,Nnm
�COY E_k'Rfi Hitr'E`OF GRADE
EE"'API- OOCG16.0 !E"tiFC_1D
TOP OF :"T R 2" PRESSURE LINE TEE AT
G 2' PRESSURE LINE / INLET
R
/A TO D-E0X f�
cAs -� 12.45 5
BAFFLa ELEV. ELEV.
12_7 f 1600 CAL D -BOX
EXISTING WING TO ELE':'. 12.2 1000 CAL DRAIN HOLE 17.76
BE REMOVEDSEPTIC TANK 1733
ELEV. PUMP CHAMBER (C OF ELEV.
13.0 (6" OF OTONE UNDER OR ELEV. STONE
TOP OF COASTAL BANK ELEV MECHANICALLY COMPACTED) WITH MYERS SRM -4
18
6
mt, .' • �4
3
4-
EDGE OF SALT MARSH -
PUMP. PUMP ALARM UNDER) 17.0
TEE SIZES: PACKAGE TO BE INSTALLED ELEV
INLET: C UP, 13" DOWN IN DWELLING POWERED
OUTLET: 6' UP, 14" DOWN BY A CIRCUIT SEPARATE
FROM THE PUMP
POWER, DISTANCE BETWEEN
ONIOFF SWITCH TO BE 8").
(DISTANCE BETWEEN ON SWITCH
AND ALARM TO BE 12")
3.7V#
2.4 BENCHMARK AT
/ -.• CONCRETE BOUND
✓1� ELEVATION - 3.96
5
&O�VEM
A �
g1
WRACK LINE /
EXISTING DOCK
DM
DEMAREST-McLELLAN ENGINEERING
24 SCHOOL STREET P.O. BOX 463
WEST DENNIS, MASSACHUSETTS 026:0
PHONE & FAX : (508) 398-7710 -
t,,I ,:Ar,
i � 1, ,, rl,:: !m
DATE:
/ JOw
z
0EV-4 P@S,, JR
No. 3665;
THOMAS MCLELLAN, P.E. I I JOHN Z. DEMAREST JR., P.L.S
2" PEASTONE
n i,r' _ f 1/2"
�- WASHED STONE
ELEV: 179
15.0
ELEV.
E 50.5
6- 600 GALLON CHAMBERS WITH 4' OF
STONE ALL AROUND (H-20)
(50.5 x 129' x 2' DEE))
(TO BE VENTED)
SITE AND SETITAGE PLAN
LOCATION.•
38 CHARLES STREET
SOUTH YARMOUTH, MA
PREPARED FOR
DENNIS DUCHARME
SCALE: 1" = 40' DATE: 10-22-99
REFERENCE: PLAN BOOK f04 PACE 127
REVISED: 11-3-99 REVISED: 3-6-00 REVISED: B-4-00
v_����7j�-��v,3 I
25-8"
16'
DECK
14'
4, 44'
B'
PROPOSED
3P-10'
35' 6 BEDROOM
DWELLING
PO
15-8"
44'
14'-7"
2x-3"
3x-3"
GARAC
zx-s"
PROPOSED
DWELLING
14
-12
IN 1, PROPOSED ADDITION
VIP
14
,
100' FROM BVW 12
PROPOSED ADDITION f0
(DECK)
WORK LIMIT LINE -�
(SEE NOTE 12)
EDGE OF BORDERING
VEGETATED WETLAND
KEY:
EXISTING CONTOUR: - -
PROPOSED CONTOUR: - --....... ..... •
EXISTING SPOT ELEVATION: 25.5
PROPOSED SPOT ELEVATION: 25
TEST HOLE: •-
UTILITY POLE: -O-
FENCE LINE: - -
HYDRANT: -6-
RETAINING WALL:
TREE:
DM # �9_Q96
TEST HOLE LOGS
ENGINEER: THOMAS McLELLAN, P.E.
WITNESS: KELDA WELSH
DATE: 9-14-99
PERCOLATION RATE: < 2 MIN/IN
TH-1
22D
O
HORIZON L AMY SAND
11" fOYR 3/2 21,1
B HORIZON
LOAMY SAND
24" fOYR 6/8 20.0
C HORIZON
MED -FINE SAND
2.5Y 7/2
13r 1110
NO GROUND WATER ENCOUNTERED
SEPTIC SYSTEM DESIGN
FLOW ESTIMATE.'
. BEDROOMS AT -110 0 4L/DAY/BEDROOM =SM CAL/DAY
SEPTIC TANK:
660 GAL/DAY x 2 DAYS = 1320 CAL
USE 1500_CALLON SEPTIC TANK
NOTES:
1. VERTICAL DATUM: NGVD
2. MUNICAPAL WATER IS AVAILABLE.
S. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM.
4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20
LOADING SPECIFICATIONS.
5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE).
6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL.
7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE
USE OF A GARBAGE DISPOSAL.
8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE
STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL
HEALTH REGULATIONS.
9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR
TO CONSTRUCTION.
10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO
EXCEED 3.0'.
11. AN ELECTRIC PERMIT IS REQUIRED PRIOR TO INSTALLATION OF
PUMP SYSTEM.
12. WORK LIMIT LINE TO BE DOUBLE STAKED HAY BALES OR SILT FENCE.
LINE TO BE STAKED PRIOR TO ANY SITE WORK.
13. ROOF RUN-OFF TO BE' DIRECTED TO DRYWELLS OR STONE TRENCHES
AT DRIP LINES.
14. ALL DISTURBED AREAS TO BE REVEGETATED OR MULCHED UPON
COMPLETION OF PROJECT.
15. EXISTING CESS POOLS ARE TO BE PUMPED AND FILLED WITH SAND
OR REMOVED.
16. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW.
LEACHING AREk
USE 5- 500 GALLON C.4AYBERS WITH 4' OF STONE
ALL AROUND (50.5x 12-8' x 2' DEEP)
SIDE AREA 50.5 + 1<8)2 x 2 - 253 (.74) = 1¢7 GAL/DAY -
BOTTOM AREA 50.5 12-8'- 646 SF (74) - 478 GAL/DAY
CAPACITY a 665 CAL/DAY
SEPTIC SYSTEM, SECTION
-- COVERS FI HIN 12" OF
__ �•� ((O,Nnm
�COY E_k'Rfi Hitr'E`OF GRADE
EE"'API- OOCG16.0 !E"tiFC_1D
TOP OF :"T R 2" PRESSURE LINE TEE AT
G 2' PRESSURE LINE / INLET
R
/A TO D-E0X f�
cAs -� 12.45 5
BAFFLa ELEV. ELEV.
12_7 f 1600 CAL D -BOX
EXISTING WING TO ELE':'. 12.2 1000 CAL DRAIN HOLE 17.76
BE REMOVEDSEPTIC TANK 1733
ELEV. PUMP CHAMBER (C OF ELEV.
13.0 (6" OF OTONE UNDER OR ELEV. STONE
TOP OF COASTAL BANK ELEV MECHANICALLY COMPACTED) WITH MYERS SRM -4
18
6
mt, .' • �4
3
4-
EDGE OF SALT MARSH -
PUMP. PUMP ALARM UNDER) 17.0
TEE SIZES: PACKAGE TO BE INSTALLED ELEV
INLET: C UP, 13" DOWN IN DWELLING POWERED
OUTLET: 6' UP, 14" DOWN BY A CIRCUIT SEPARATE
FROM THE PUMP
POWER, DISTANCE BETWEEN
ONIOFF SWITCH TO BE 8").
(DISTANCE BETWEEN ON SWITCH
AND ALARM TO BE 12")
3.7V#
2.4 BENCHMARK AT
/ -.• CONCRETE BOUND
✓1� ELEVATION - 3.96
5
&O�VEM
A �
g1
WRACK LINE /
EXISTING DOCK
DM
DEMAREST-McLELLAN ENGINEERING
24 SCHOOL STREET P.O. BOX 463
WEST DENNIS, MASSACHUSETTS 026:0
PHONE & FAX : (508) 398-7710 -
t,,I ,:Ar,
i � 1, ,, rl,:: !m
DATE:
/ JOw
z
0EV-4 P@S,, JR
No. 3665;
THOMAS MCLELLAN, P.E. I I JOHN Z. DEMAREST JR., P.L.S
2" PEASTONE
n i,r' _ f 1/2"
�- WASHED STONE
ELEV: 179
15.0
ELEV.
E 50.5
6- 600 GALLON CHAMBERS WITH 4' OF
STONE ALL AROUND (H-20)
(50.5 x 129' x 2' DEE))
(TO BE VENTED)
SITE AND SETITAGE PLAN
LOCATION.•
38 CHARLES STREET
SOUTH YARMOUTH, MA
PREPARED FOR
DENNIS DUCHARME
SCALE: 1" = 40' DATE: 10-22-99
REFERENCE: PLAN BOOK f04 PACE 127
REVISED: 11-3-99 REVISED: 3-6-00 REVISED: B-4-00