Loading...
HomeMy WebLinkAbout64.16 - Plans Sheet 2GENERAL NOTES 1. ALL DETAILS, 5EC'TION5 AND NOTE5 5HOWN ON DRAWI h'G5 ARE TYPICAL AND SHALL APPLY T9 51 MILAR SITUATIONS EL5EWUERE OTHER' W15E NOTED. 2. TUE CONTRACTOR SHALL VERIFY ALL DIM EN51ONS AND CONDITION5 AT SITE PR'AR TO COM M ENCENIENT OF CONSTRUCTION. K. BLOCK OVER ALL CARRYING BEAMS, GEARING WALLS, AT ALL 5TAIRWAY5, & WHEREVER ELSE NEEDED FOR FIRE STOP OR NAILING 4, A MW. OF TIDO JU5T5 UN DER ALL LONG PARALLELWALL5 F. FROVI DE 51M PSON #H25 HURRICANE TIES QI ALL RAFTER5 THAT DO NOT ADUT CEILING JOI5T AND AT ALL TKU55 LOCALS 6. ALL SUIR RISERS TO DE EQUAL, r/-1AW" ARE NOT TO EXEED 8 W 7. ALL FINISHED STAIR TREAO5 A.KE TO RE 10 W' 9, MIN. F..NI5HED eTAIR WIDTH 1536" '10. CONTRACTOR TO VERIFY ALL EENGINEERED LUMBER WITH REGARD TO 512E AND APPLICATON WITH THEIR RE5PECTIVE MANUFACNRER AND SUPPLIER. � � o M1 i9 t b" T&G Ply, glue and nail zCR05S SECTION 2 Scale 114"=1'p' �rdl edge vent 0 all Hdges �2 xt2 Hdge board I DECK 1xe 48"O.C, Asphalt rcof shlw,les GAF sh'nglcmax � tY2" COX Ft, -� r^NG606e1 � � gioF9GE Vented Tyr. Pm de Simpson41,25 h,rr ties 016" oc whe-e+er raf', do not abutt dgjoisw WNlte cedar (extras) 12"C10 c House Wrsa DX PLY 2x418" 0.6 Rtt F Glasa Ill 14" I -Joist, Mall next N, 2.fi •(see nate #10) adsGng 2x6 calling jolst c4atImg 1x3 strapping, nail to new J A ` 2 � I MASTER DEDROOM nfiaid taavdd atlon i clsGng 2x cellirg Jds; p CL05ET L I U new LVL flush header new metal hanger aa, he.m, (CY I I II N.w2-2d0 header mIq Family Room (exla5) SECOND FLOOR PLAN SECOND FLOOR FRAMING Scale 1/4".1'-O" 4x0 Prcs. heated SYP c'll on WINDOW SCHEDULE NUMBER IQTY I FLOOR I RIG I AREA I W/ALLUE CODE 'W01 2 2 361/2Y21 AN51 W02 1 2 ]21/2X21 AN51-2 W03 I 2 599/8X573/b TYLa46 NAR MU W04 1 1 12 257ek171/2 1 1 AR251 J A ` 2 � I MASTER DEDROOM nfiaid taavdd atlon i clsGng 2x cellirg Jds; p CL05ET L I U new LVL flush header new metal hanger aa, he.m, (CY I I II N.w2-2d0 header mIq Family Room (exla5) SECOND FLOOR PLAN SECOND FLOOR FRAMING Scale 1/4".1'-O" 4x0 Prcs. heated SYP c'll on - Eeld to avdd cJating �— 10" conerate Pel -e min. 4e'below L\ _ Y L r grade 40 i � x14 Ln er —2x Prcs. trc 5YPjaat Z sio 5lmpson'" LU28 metal = o ^ hangere both cads L S Q _2xe ledge-w/lb - gal. lags 00C, tSr,I A c G etaggcr m �� Q,1'� s 4� —LVL dm board etdak � L Is p lavow starts hrre � s � 2.13/4 d4 LVL U L � V 1 ve" rim marc h —14"LVL10"OC •(see note #1oJ Ali exlsG'ng 2x6 —foist Lo rcmeln li PgJuz; gable location In - Eeld to avdd cJating ceilingjoist ' Y L r O x14 Ln er _1314 •(sm note Wo) T,` ¢e 'S G N New 2x raftwo, match edsting rwf atfamly = o ^ is 3 i