Loading...
HomeMy WebLinkAbout118.34 - Site and Sewage Plan (Copy 2)LOCATION MAP LOT 51 30,000 ± S.F. (0.69 ± AC.) / / 46 ASSESSORS MAP: 118 PARCEL: 34 CURRENT ZONING: R-40 (1954 SUBDIVISION) BUILDING SETBACKS: F: 30' S: 6' R: 20' FLOOD ZONE: C W 48 I I I I I 48 I I I I r � 5 sN h° o G ExtEyLNNG 4W s I , KEY: EXISTING CONTOUR: - - PROPOSED CONTOUR: - EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: -$'- UTILITY POLE: -Q- FENCE LINE: - - HYDRANT:� RETAINING WALL: TREE: DM # 00_94 - ED Re$oz"Y14 DgI 0ao.0 TEST HOLE LOGS OF NOTES: 1. VERTICAL DATUM: ASSUMED FROM QUAD (NGVD +/-) ENGINEER: THOMAS MCLELLAN, P.E. 2. MUNICAPAL WATER IS AVAILABLE. WITNESS: _AMY VON HONE, R.S. DATE: 1-18-01 Y P { 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20 PERCOLATION RATE: < 2 MIN/IN LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). TH-1 TH-2 48.0 46.0 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 'HORIZON ELEV. -- 0 HORIZON Va HO ELEV. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE SSANDY LORANDY LORA! LOAM USE OF A GARBAGE DISPOSAL. 7" fOYR 2/2 47.4 15- IOYR 3/3 44.8 8. ALL CONSTRUCTION DETAILS APE TO BE IN CONFORMANCE WITH THE B HORIZONS HORIZON SANDY " AM STATE OF MASS. ENVIRONMENTAL CODE TITLE FIVE AND LOCAL ( ) 42" 10YR 5/8 44.5 44" f0YRD518 42.3 HEALTH REGULATIONS. C HORIZON C HORIZON 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR LOAMY SAND LOAMY SAND (WITH BUL.DERS) (WITH BOULDERS) TO CONSTRUCTION. 2.5Y 614 2.6-Y 614 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. 11. ALL UNSUITABLE SOIL (B HORIZON, APPROX. 44" DEEP) WITHIN 5' OF 132" 37.0 f44" 34.0 PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. NO GROUND WATER ENCOUNTERED SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 3 _ BEDROOMS AT 110 GAL/DAY/BEDROOM = 330 GAL/DAY SEPTIC TANK: 330 CAL/DAY x 2 DAYS = 660 CAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 INFILTRATOR CHAMBERS (MODEL 3050) WITH 3.:i' OF STONE ALL AROUND (29.5' x 11.2' x 2' DEEP) S !DE AREA: (29.5 + 11.2)2 x 2 = 163 (.74) = 121 CAL/DAY BOTTOM AREA: 29.5'x 11.2' = 330 SF (74) = 244 GAL/DAY \ E-xaELJ- iGG CAPACITY = 365 GAL/DAY SITSEPTIC SYSTEM SECTION v;flpp _ - ,g6 DR r tc'Q T / 48 �\ 50 48 50 r 1 46 44 42 48- . _ ' ' 4s- - - - o•' 'to. 42- _ L R,Y 40' Alv C R' BENCHMARK AT PK NAIL ELEVATION = 40.0 10' 14' SCRN 16' 14- PRCH 52' [DK. 4- 30' PROPOSED 24 28' 3 BEDROOM DWELLING 6' 4' GARAGE 12' 22, 2' 18' 24' PROPOSED DWELLING 2" PEASTONE COVERS WITHIN 12" OF 50.0 FINISHED GRADE 314" - f 112- VON ONE INSPECTION COVER f I TOP OF FOUNDATION TO BE WITHIN 6" OF GRADE) WASHED STONE 77 T7 77 _I I_ - ELEV: 44.5 46.5 � ELEV. e e Er 46.75 1500 GAL ID -BOX 42.0 44.83 ELEV. ELEV. SEPTIC TANK 45.0" OF ELEV. 35 3.5' 47.0 (6" OF STONE UNDER OR ELEV. STONE 29.5' ELEV. MECHANICALLY COMPACTED) UNDER) 3 INFILTRATOR CHAMBERS (MODEL 3050) TEE SIZES: GAS BAFFLE 44.0 WITH 3.5' OF STONE ALL AROUND INLET: 6" UP, 13" DOWN AT OUTLET TEE ELEV. (29.5'x 11.2'x 2' DEEP) (H-20) OUTLET: 6" UP, 14" DOWN DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 02670 PHONE & FAX : (508) 398-7710 - APPROVED BY: DATE: SITE AND SEWAGE PLAN LOCATION.- 55 CRANBERRY LANE SOUTH YARMOUTH, MA PREPARED FOR - REEF REALTY SCALE: f' = 30' DATE: REFERENCE: PLAN BOOK 120 PAGE 119 REVISED: 7-3-02 (NEW HOUSE OF , Y P { r 1,- J-° rvo avt:l i. THOMAS McL LLAN, P.E. JOHN Z. DEMAREST JR., P.L.S. SITE AND SEWAGE PLAN LOCATION.- 55 CRANBERRY LANE SOUTH YARMOUTH, MA PREPARED FOR - REEF REALTY SCALE: f' = 30' DATE: REFERENCE: PLAN BOOK 120 PAGE 119 REVISED: 7-3-02 (NEW HOUSE