Loading...
HomeMy WebLinkAbout118.34 - Site and Sewage Plan (Copy 5)LOCATION MAP LOT 51 30,000 ± S.F. (0.69 -f-AC.) i i 46 ASSESSORS MAP: 118 PARCEL: 34 CURRENT ZONING: R-40 (1954 SUBDIVISION) BUILDING SETBACKS: F: 30' S: 6' R: 20' FLOOD ZONE: C 41- If k RE i � \9 N iRGx ! G ExtEyL1NG D� 50 KEY: EXISTING CONTOUR: - - - PROPOSED CONTOUR: EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: -1$�- UTILITY POLE: -0- FENCE LINE: HYDRANT: 6 - RETAINING RETAINING WALL: TREE: DM u 00_94 DK't rK' ' r GpoS0�1L GARAGE r PR EDR NG op �E 48 i 1 1 1 TEST HOLE LOGS ENGINEFR: THOMAS McLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: _1-18-01 PERCOL.ITION RATE: < 2 MIN/IN TH-1 TH-2 48.0 46.0 0/A HORIZON ELEV. 0/A HORIZON ELEV. ANDY LOAM ANDY LOAM 10YR 2/2 47.4 15- lOYR 3/3 44B B HORIZON B HORIZON SANDY LOAM SANDY LOAM IOYR 5/8 44S 44" 10YR 5/8 423 C HORIZON C HORIZON LOAMY SAND LOAMY SAND H% OULDiRS) (WITHBOULDERS) KIT 2.5Y 614 NO -;ROUND HATER ENCOUNTERED SEP`nI C SYSTEM DESIGN NOTES: 1. VERTICAL DATUM. ASSUMED FROM QUAD (NGVD +/-) 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20 LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 30. If. ALL UNSUITABLE SOIL (B HORIZON, APPROX. 44" DEEP) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. FLOW ISTIMATE: -3- B .'DROOMS AT 110 GAL/DAY/BEDROOM= 330 GAL/DAY SEPTI' TANK: 330 ;AL/DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK -LEACHING AREA: U."E 3 INFILTRATOR CHAMBERS (MODEL 3050) WITH 3.f' OF STONE ALL AROUND (29.5' x ?1.2' x 2' DEEP) :IDE AREA: (29.5 + 11.2)2 x 2 = 163 (.74) = 121 CAL/DAY IOTTOM AREA 29.5' x 11.2' = 330 SF (74) = 244 CAL/DAY Y` .I )� !! �� CAPACITY =365 CAL/DAY Ex1SLLq�1'f- D"E 141 tT I C SYSTEM SECTION .uJ i 5 � DAEiL'-5- DR , REC��i`JCU I Zoo i 48 / 50 48 r: 46 44 42 48� *0. 46- 109 Oo a0 8 i - F 44-- � r-42--'--� �' �E 42- R Ry 40 +551 E ' A rj ' BENCHMC F ARK AT PK NAIL ELEVATION - 40D I 50.0 TOP OF FOUNDATION COVERS WITHIN 1.7' OF FINISHED GRADE ZONE INSPECTION COVER OB_ WITHIN 6' OF GRADE) ELEV. 1500 GAL ELEV. SEPTIC TANK \ 47.0 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) DEMAREST-McLELLAN ENGINEERING. 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 02671 PHONE & FAX : (508) 398-7710 TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN APPROVED BY: 46.5 t ELEV. ID -BOX 44.83 45.0" OF ELEV. ELEV. STONE UNDER) GAS BAFFLE 44.0 AT OUTLET TEE ELEV DATE: I THOMAS McL rLLAN, P.E. 11 JOHN Z. DEMAREST JR., P.L.S.1 0, 14' SCRN 1C 14' PRCX 52' DK. 4' 30, PROPOSED 24, 2B 3 BEDROOM DITELLING 4' 6' GARAGE 12' 22' 2 18' 24' i PROPOSFD DIFF..LLING 2" PEASTONE 3/4" - 1 1/2'• �-WASHED STONE ELEV: 44.5 /1:1 -E I A42.0 3 3 ELEV. 51 E - 29.5' -o 3 INFILTRATOR CHAMBERS (MODEL 3050) WITH 3.5' OF STONE ALL AROUND (29.5'x 11.2'x 2' DEEP) (H-20) SITE AND SEWAGE PLAN LOCATION.' 55 CRANBERRY LANE SOUTH YARMOUTH, MA PREPARED FOR. - REEF REALTY SCALE: 1" = 30' DATE: 1131101 REFERENCE. PLAN BOOK 120 PAGE 119 REVISED: 7-3-02 (NEW HOUSE) I