Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2016It ASSESSORS MAP: 17i --- - -- -- - --- PARCEL:. FLOOD ZONE: REFERENCES�r�,_�------- LOCATION MAP U P M 0 O 4 w cea 5 V Z W / )"' 16 V ! 01 K L t! - ,112 )DO 0 w TEST HOLE; LOGS SOIL EVALUATOR: 1,0 14A WITNESS:AW t4cw& DATE: O\ PERCOLAT [ON RATE: M14 V -Iy hI v.17 A \J,�/ v TH-I kit 0 �0 Z b Io V I l0 0 STH- 2 SEPTIC SYSTEM DESIGN FLOW ESTIMATE BEDROOMS'. EDROOMS AT GAL/DA /BEDR00 - :11 GAL/DAY P�f I C TAMC GAL/DAY x 2 DAYS •.. GAL USE GALLON SEPTIC TANK &Q VJ OIL ABSORPTION SYS STEM � �U_���� SIDE AREA: 2-X BOTTOM AREA: 137 SEPTIC SYSTEM SECTION Permit valid for REPAIR Oft SEPTIC SYSTEM ONLY; due to State and Local septic varianc.M t3oard. of Ilcalth review and approval Is required for. any future additions/renrvations/alterations to sewage facilities aniUor structures/d»'ellmg: Yarmouth Health [�)7cPy{,aljlne/nt APPRQ Date = GAL SEPTIC TA K 0 _ 1) 'I'he installation shall eojnph with Tille V andTown of �O Board of. lealth Regulations. 2) The installer shall verify the location of utilities, sewer inverts and septic components prior to installation and setting base elevations. 3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The first two feet out of the d -box to the leaching shall be level. 4) This plan is not to be utilized for property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. 6) Parking shall not be constructed over II 10 septic components. 7) The property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based on the plan shall be deemed approval of the design flow by the owner. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from water line. Sewer !hies crossing the water line sliall be sleeved with 4 inch SCI 140 PVC with ends grouted if applicable. The proposed SAS is being installed below the water service . line. The line is to be sleeved as aforementioned and maintained in place. s 11) If a garbage grinder existit is to be removed and is the responsibility of the owner to ensure such. ` 12)'flie installer is to take caution in excavation around the gas line if such exists. 13) Tile installer shalt verify the location, quantity and elevation of the sewer lines exiting the dwel ling' rior to the installation. 14) This plan is representative only that a system can fit on a property meeting Title V requirements. VACI L .. -(t3 0FAg,�� DAVID (VIASON m ¢�Nu. 1066 0 \/�f SITE AND SEWAGE PLAN LOCATION: -4Ilo KfqWV(0&<( oQL(� PREPARED FOR: �C MASC LE: DAVID B. MASON?& DATE: ;3 r" DBC ENVIRONMENTAL DESIGNS EAST SANDWICH. MA DATE HEALTH AGENT (508) 833-2177 CH A_Z* k X, -Z-D UwlT1 SITE AND SEWAGE PLAN LOCATION: -4Ilo KfqWV(0&<( oQL(� PREPARED FOR: �C MASC LE: DAVID B. MASON?& DATE: ;3 r" DBC ENVIRONMENTAL DESIGNS EAST SANDWICH. MA DATE HEALTH AGENT (508) 833-2177 CH A_Z* k