TEST HOLE; LOGS
SOIL EVALUATOR: 1,0 14A
WITNESS:AW t4cw&
DATE: O\
PERCOLAT [ON RATE: M14 V
-Iy hI v.17 A \J,�/ v
TH-I
kit 0
�0 Z
b Io V I
l0
0
STH- 2
SEPTIC SYSTEM DESIGN
FLOW ESTIMATE
BEDROOMS'.
EDROOMS AT GAL/DA /BEDR00 - :11 GAL/DAY
P�f I C TAMC
GAL/DAY x 2 DAYS •.. GAL
USE GALLON SEPTIC TANK &Q VJ
OIL ABSORPTION SYS STEM � �U_����
SIDE AREA: 2-X
BOTTOM AREA:
137
SEPTIC SYSTEM SECTION
Permit valid for REPAIR Oft SEPTIC SYSTEM
ONLY; due to State and Local septic varianc.M
t3oard. of Ilcalth review and approval Is required for.
any future additions/renrvations/alterations to
sewage facilities aniUor structures/d»'ellmg:
Yarmouth Health [�)7cPy{,aljlne/nt
APPRQ
Date
= GAL
SEPTIC TA K
0 _
1) 'I'he installation shall eojnph with Tille V andTown of �O Board of.
lealth Regulations.
2) The installer shall verify the location of utilities, sewer inverts and septic
components prior to installation and setting base elevations.
3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The first
two feet out of the d -box to the leaching shall be level.
4) This plan is not to be utilized for property line determination nor any other
purpose other than the proposed system installation.
5) All septic components must meet Title V specifications.
6) Parking shall not be constructed over II 10 septic components.
7) The property is bounded by property corners and property lines.
8) The property owner shall review design considerations to approve of total
design flow and number of bedrooms to be considered for design. Receipt
of payment for the plan and installation based on the plan shall be deemed
approval of the design flow by the owner.
9) The existing leaching or cesspools shall be pumped and filled with material
per Title V abandonment procedures. Those within the proposed SAS shall
be removed along with contaminated soil and replaced with clean sand per
Title V specs.
10) System components to be 10 feet from water line. Sewer !hies crossing the
water line sliall be sleeved with 4 inch SCI 140 PVC with ends grouted if
applicable. The proposed SAS is being installed below the water service .
line. The line is to be sleeved as aforementioned and maintained in place.
s
11) If a garbage grinder existit is to be removed and is the responsibility of the
owner to ensure such. `
12)'flie installer is to take caution in excavation around the gas line if such
exists.
13) Tile installer shalt verify the location, quantity and elevation of the sewer
lines exiting the dwel ling' rior to the installation.
14) This plan is representative only that a system can fit on a property meeting
Title V requirements.
VACI
L ..
-(t3 0FAg,��
DAVID
(VIASON m
¢�Nu. 1066
0
\/�f
SITE AND SEWAGE PLAN
LOCATION: -4Ilo KfqWV(0&<( oQL(�
PREPARED FOR: �C
MASC LE:
DAVID B. MASON?& DATE: ;3 r"
DBC ENVIRONMENTAL DESIGNS
EAST SANDWICH. MA
DATE HEALTH AGENT
(508) 833-2177
CH
A_Z*
k
X,
-Z-D
UwlT1
SITE AND SEWAGE PLAN
LOCATION: -4Ilo KfqWV(0&<( oQL(�
PREPARED FOR: �C
MASC LE:
DAVID B. MASON?& DATE: ;3 r"
DBC ENVIRONMENTAL DESIGNS
EAST SANDWICH. MA
DATE HEALTH AGENT
(508) 833-2177
CH