HomeMy WebLinkAbout94 Cranberry Lane Rear and Left Elev.r=r-T 51 Dr= �1-.rE\/A71 C
S:=T I�4w,%r— StI^#,1=%Gt pd�r <,- Tto,=%,Gts
1.LG
SILVER STREET
RCHITECTS
CONSULTING FOR ARCHITECTS AND BUILDERS
"Silver Street Architects, because not all streets are paved in gold"
DANIEL J. WEZNM AIA
300 West Main Street Building A, 2nd Floor
Northborough, Massachusetts 01532
Phone: 508.393.3990 Far: 508.519.0401
Mobile: 774.245.129.1 Email: dwzniak@vcrizoa.net
MA Arch Reg 410724 0 II.LC.M13996.5 0 CSL #085113
GENERAL NOTES:
PREPA M FOR Im EXGL5IVE 115E OP:
nm}. md 5u4cling
1N=EMNIPICATI ON
THE WORMATION CONTAINED IN THESE CONSTRUCTION
DOCVKaM I5 FOR THE ECG11151VE 115E OF THE CLIENT
IN THE CONEcTRLICTION O? THE BUILDIN6 VIESI6NATE7 IN
THE DOCUHIENIS. EXISTING SITE CON121TION5 HAVE
BEEN 5A5ED UPON VISUAL AND PHOT06RAFHIG
INFORMATION AND IS NOT AN IN-DEPTH INVESTI6ATION
INTO THE EXISTING SITE CONDITIONS. THE ARCHITECT
HAS ATTHIPTED TO ESTABILISLH AN ACCURATE SET OF
WNSTRUCTION DOCUI E FOR THE CONSTRUCTION OF
THE 131,1II-DTN6 BAr-4D UPON THE CLIENT' REOUIR.EKBNTS
AND LOCAL CODES. IT SHALL BE THE 6EN92AL
CONTRACTORS RMPON5IBIL.ITY TO A 4MARE [!, DEPTH
TESTING AND IWE5T16ATIONS AS REW171 D WHEN
VWWPN OR HIDM CONDITIONS BECOHIE AVAILABLE.
THE GENERAL CONTRACTOR SHALL PROMPTLY NOTIPY
CONDmON5 THAT SHALL AFFECT THE SCfIM1LING OF
CONSTRUCTION FOR THE PROXCT. THE GENERAL
CONTRACTOR 5HA LL. HOLD HARMLESS AND INDEMIFY
THE ARCHITECT AND ALL REPRIMAH'1W PARTES FROH
ALL ERRORS AND OMISSIONS PERTAINING TO THE
PLANS AND DO IENT5 REJ`TED TO THE PROJECT
AND OTHER RELATED WORK AS REPRESENTED BY THE
ARCHITECT.
1 SSUED FOR HEARING
NOT FOR CONSTRUCTION
REAR AND LEFT SIDE -
ELEVATIONS
Proleol Nemo and Address
MASON RESIDENCE
44 CRANBERRY LANE
YARMOUTH PORT, MA
Dft Marber
GRAN-ELV
Job Mmber
054111
Dale
Sheat
11 -03-05
A o ��j