HomeMy WebLinkAbout94 Cranberry Lane SewageSOIL TEST PIT DATA:
TEST PIT _#1_
GRD. EL. 91.0
EST. HIGH GW. 77.0
FIBRIC
LOAMY SAND
2.5Y 5/2
B
LOAMY SAND
IOYR 5/8
LOAMY SAND
2.5Y 6/6
LOAMY SAND
2.5Y 6 3
EL = 85.0
92"
LOAMY-3
OAMY3FINE
SAND
2.5Y 6/6
NO G.WATER
EL = 77.0
168"
AUGUST 25, 2005
1;tql
DATUM:
VERTICAL DATUM: ASSUMED
BENCH MARK SET: HYDRANT TAG BOLT #336
ELEVATION 88.16
PROFILE: NOT TO SCALE
EL= A
TOP FOUNDATION CONCRETE COVERS TO WITHIN
EL -91.5 A 6" OF FINISHED GRADE.
5 OUTLET
DIST. BOX
SEPTIC TANK
INVERT ELEVATIONS:
TOP OF FOUNDATION
DATE:
A
8-25-05
6"
TEST BY:
88.00
RON CADALLAC
4"
WITNESSED BY:
91,
AMY VON HONE
C
PERC. RATE:
INVERT
8 MIN./INCH
30"
SOIL EVALUATOR
4"
RON CADALLAC
AT DIST. BOX (IN)
SOIL CLASS:
E
1
60"
AT DIST. BOX (OUT)
86.63
L.T.A.R.
NITROGEN SENSITIVE
0.66 G.P.D./SQ.FT
72"
NOT A ZONE II
168"
AUGUST 25, 2005
1;tql
DATUM:
VERTICAL DATUM: ASSUMED
BENCH MARK SET: HYDRANT TAG BOLT #336
ELEVATION 88.16
PROFILE: NOT TO SCALE
EL= A
TOP FOUNDATION CONCRETE COVERS TO WITHIN
EL -91.5 A 6" OF FINISHED GRADE.
5 OUTLET
DIST. BOX
SEPTIC TANK
INVERT ELEVATIONS:
TOP OF FOUNDATION
93.00
A
4"
INVERT
AT BUILDING
88.00
B
4"
INVERT
AT SEPTIC TANK (IN)
87.55
C
4"
INVERT
AT SEPTIC TANK (OUT)
87.30
D
4"
INVERT
AT DIST. BOX (IN)
86.80
E
4"
INVERT
AT DIST. BOX (OUT)
86.63
F
INVERTS AT LEACHING FACILITY:
4" INVERT AT BEGINNING
INDICATES
y ESTIMATED
SEASONAL, HIGH
GRO �,WATER
INDt�AfES "l
'K7 OBSERVED
GROUND WATER
INDICATES
PERC.
TEST
®INDICATES
UNSUITABLE
MATERIAL
01
FIRST PIPE LENGTH
TO BE SET LEV,� '
FOR MIN. 2' MG• ",'
61 sI
EL=8
4" PVC SCH 40
i
LEACHING CHAMBER
o v o 0 0 o v v v o
v v o 0 0 0 o v v o
i v v v v v v v v v v
H
7.5' SEPARATION
IEST. HIGH GROUNDWATER
q_
OF LEACHING CHAMBER 86.50 G BREAKOUT 87.0
ELEVATION AT BOTTOM
OF LEACHING CHAMBER 84.50 H
NO OBSERVED GROUNDWATER
BOTTOM OF HOLE 77.0 J
VARIANCES REQUESTED:
FLOOR PLANS:
SEE ATTACHED
SEPTIC TANK DETAIL: 1,500 GALLON
NOT TO SCALE
NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON,
REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE.
2. SEPTIC TANK TO WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER.
UNLESS UNDER PAVEMENT, DRIVES OR
TRAVELED WAYS, WHEREIN H-20 LOADING
SHALL APPLY.
3. ALL PIPE CONNECTIONS AND CONCRETE 2-24" DIA CONCRETE MANHOLES
CONSTRUCTION SHALL BE WATERTIGHT. W/ METAL HANDLES BROUGHT
4. FILL ALL UNUSED KNOCKOUTS WITH TO 6" OF FINISH GRADE
MORTAR. TEE TO BE UNDER
RAISE M.H INLET
W,�-_
SEWER BRICK a: - -,t
10'-0" k MORTAR i
NOR
e`
PRECAST SEPTIC TANK10.
e- INLET TEE
5'-2" 4 _6" a 4'-0" MIN.
5'-8" 9 LIQUID DEPTH -
N µ
DISTRIBUTION
BOX
DETAIL:
NOT TO SCALE
TITLE REFERENCE:
DEED BOOK 20578, PAGE 178
PLAN REFERENCE:
NO. OF OUTLETS: 5
FINISHED GRADE
'ABLE I- 2" WALLS
;:......;:...... 1
TT
6" 5,5" OUTLETS' 8" 1
L� 3.
4"
VEL 12" -`
e:
14"
:� g'_1•
15 1/2"
2AS C he
cis a«inal)
tr
e
e BOTTOM ON LEVEL STABLE BASE
PLAN VIEW u.-_�04' _W
6" MIN. 3/4" To CROSS-SECTION VIEW
1 1/2" STONE
LOCUS PLAN: NO SCALE
W. GREAT WESTERN ROAD
6
"
DRIFTW❑❑D LN.
2
LOCUS
$°A� 56°�xq°Yl4,° L_ 2.
6 W°°�
30TTOM ON LEVEL
STABLEBASE 6" MIN. 3/4" TO
CROSS-SECTION 1 USED
STONE
CRUBASE
30 1/2"
PRECAST DIST.
BOX
I; , 4
PLAN VIEW
NOTES:
1. DIST. BOX TO WITHSTAND H-10 LOADING
UNLESS UNDER PAVEMENT, DRIVES OR
TRAVELED WAYS WHEREIN H-20 LOADING
SHALL APPLY.
2. PROVIDE INLET TEE OR BAFFLE WHERE
SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR
IN PUMPED SYSTEM.
3. FIRST TWO FEET OF PIPE OUT OF DIST.
BOX TO BE LAID LEVEL.
4. ALL PIPE CONNECTIONS AND CONCRETE
CONSTRUCTION SHALL BE WATERTIGHT.
5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR.
LOCUS
INFORMATION
CURRENT OWNER:
FRANCES MASON
TITLE REFERENCE:
DEED BOOK 20578, PAGE 178
PLAN REFERENCE:
PLAN BOOK 120, PAGE 119
ASSESSORS MAP:
118
PARCEL:
78
ZONING DISTRICT:
R-40
SETBACKS:
FRONT 30'
0 00 00
SIDE 20'
5. WITHIN LIMIT OF EXCAVATION REMOVE
REAR 20'
MINIMUM LOT SIZE:
40,000 S.F.
EXISTING LOT AREA:
25,151± S.F.
PROPOSED LOT COVERAGE:
1,518± S.F. (67.)
OVERLAY DISTRICT:
APD
NITROGEN SENSITIVE
547 S.F -x 0,66 GPD/SF 361GPD
ZONE:
NOT A ZONE II
FEMA FLOOD
EFFEC.
DEPTH
ZONE DISTRICT:
"C" 7/2/1992
SPECIFICATIONS:
PANEL #250015 0002 D
BENCHMARK
HYDRANT TAG BOLT
LEACHING
DETAIL:
NOT
TO SCALE
i 11
330 X 200% =
25.5'
SEPTIC TANK PROVIDED: = 1500 GAL.
4" PVC _
• "• D FI
DESIGN PERC. RATE: <2
MIN./ INCH
PIPE
G.P.D/S.F.
•• •ING DRYWELLS
OT
01
0 00 00
- ,
PLAN
3 UNITS
01
CONSTRUCTION OF THE SEWAGE
330 X 200% =
11111111111111111111111111111111111771-7777777777777777
SEPTIC TANK PROVIDED: = 1500 GAL.
e o e0000
• "• D FI
DESIGN PERC. RATE: <2
MIN./ INCH
LONG TERM APPL. RATE 0.66
G.P.D/S.F.
•• •ING DRYWELLS
OT
01
0 00 00
DESIGN CRITERIA:
DESIGN FLOW:
3 BEDROOMS AT110G.P.B./D
PLAN
29.5
MEW - LEACHING CHAMBERS
LOAM & SEED DISTURBED
AREAS
CONSTRUCTION OF THE SEWAGE
330 X 200% =
11111111111111111111111111111111111771-7777777777777777
SEPTIC TANK PROVIDED: = 1500 GAL.
SIZE OF LEACHING FACILITY REQUIRED:
• "• D FI
DESIGN PERC. RATE: <2
MIN./ INCH
LONG TERM APPL. RATE 0.66
G.P.D/S.F.
�I
500 S,F,
150' OF ANY KNOWN LEACHING FACILITY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
USE 500 GALLON
IMPERVIOUS MATERIAL.
LEACHING CHAMBERS(3 UNITS)
12',83X2'X29,5'
SIDEWALL = 2(12.83'+29.51) X
PEASTONE
REMOVE
BOTTOM = 12.83' X 29.5'
E
(b
547S,F.
547 S.F -x 0,66 GPD/SF 361GPD
AL36-
0�
UNSUITABLET.008
ALSO SHALL BE PERFORMED ON THE FRACTION
EFFEC.
DEPTH
0
MATERIAL MEETS EACH OF THE FOLLOWING
SPECIFICATIONS:
0
MATERIAL FOR
5' ALL AROUND
10%-100% MUST PASS #50 SIEVE
(0.30 mm EFFECTIVE PARTICLE SIZE)
07-207 MUST PASS #100 SIEVE
rc
07-57 MUST PASS #200 SIEVE
0
7. EXISTING U71UTIES WHERE SHOWN
IN THE DRAWINGS ARE APPROXIMATE.
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY WITH DIG -SAFE
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING U11LITY SYSTEM IN SERVICE.
DIG -SAFE SHALL BE NOTIFIED PER
THE STATE OF MASSACHUSETTS
56"
AT TEL. 1-888-344-7233. THE
ENGINEER DOES NOT GUARANTEE
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
TAKEN FROM RECORD PLANS. THE
CONTRACTOR SHALL VERIFY SIZE,
LOCATION AND INVERTS OF UTILITIES
WASHED STONE•
TO THE START OF CONSTRUCTION.
S. THIS SYSTEM IS NOT DESIGNED FOR
TF:E USE OF A GARBAGE CRINDER.
A GARBAGE GRINDER IS NOT
RECOMMENDED DUE TO RECOGNIZED
ADVERSE IMPACTS TO THE LEACHING
FACILITY.
9. EXITING INVERTS ARE TO BE CHECKED BY
THE CONTRACTOR PRIOR TO CONSTRUCTION.
CONFIRM LOCATION do NUMBER OF INVERTS.
22' -10"
-
REQUIRED.
T-
P)SC ('-Npo
349 Main Street, (RT. 28) Unit D
W. Yarmouth Massachusetts
CROSS -SECTION
OF
DESIGN FOR
SEWAGE DISPOSAL
DESIGN CRITERIA:
DESIGN FLOW:
3 BEDROOMS AT110G.P.B./D
330 G.P.D.
REQUIRED SEPTIC TANK:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE
330 X 200% =
660 GAL.
SEPTIC TANK PROVIDED: = 1500 GAL.
SIZE OF LEACHING FACILITY REQUIRED:
OF HEALTH REGULATIONS.
DESIGN PERC. RATE: <2
MIN./ INCH
LONG TERM APPL. RATE 0.66
G.P.D/S.F.
330 GPD + 0.66 GPD/SF =
500 S,F,
SIZE OF LEACHING FACILITY PROVIDED:
150' OF ANY KNOWN LEACHING FACILITY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
USE 500 GALLON
IMPERVIOUS MATERIAL.
LEACHING CHAMBERS(3 UNITS)
12',83X2'X29,5'
SIDEWALL = 2(12.83'+29.51) X
2' = 169,3
BOTTOM = 12.83' X 29.5'
= 378.4
TWO INCHES. A SIEVE ANALYSIS, USING A #4
547S,F.
547 S.F -x 0,66 GPD/SF 361GPD
ELEVATION 88.16
'COR"ESE\Bby% \\\ N
FOUND &\HFLb\
F \
\\ \\\\ \\\ x
\ . LOT 17
prv� 3
�\` EXISTING SEPTIC COMPONENTS
O/YW I 0
., . \ � � � � \ \ � \ \ � TO BE PUMPED, CRUSHED & /� 1NooEP
EkISTf REMOVED FROM SITE IN
/�G pRf�\����; ACCORDANCE WITH TITLE 5. gy/
GF AM&
lI r:. 33 03
CIFy
If
0,
�CO
/ V EXISTING - \ \ 1 \ \ \
MOBILE HOME �\ 1 ( I/ / \ 45.4 ���\\ \\ \ .\ -87-
/ 11 85
p ; (w ( i ��0�0 LOT 16 \ \
92.2
CID
jjj
\/~ \ / ! °j /^� PROPOSED
CONCRETE BOUND J f=- / ( / /
FOUND TIPPED 3 BEDROOM I �� ` \,9 91.2 _`�
O W
/ DWENG �� //
T.O.F. 93.0 \`\ / ��� 1 /�/ Yaemoet" Ve ltM VeOartment
PROPOSED �
LIMITS OF ` 8q / \\� 25 % age\j/
EXCAVATION S 3�\��>
SEEN NOTES
PROPOSED 0 t0"f �� , Na ,e T rate
"D" BOX \ / /
PROPOSED 8, h ! �
12.83'x29.5' e ��W"4
LEACHING S.A.S. �\ 0) I UACKp, >�
PROPOSED \ 2229 - - - 2.3,}_ ---
1500 GALLON \ TP#1 / CIVIL H
PLAN VIEW LOT 15 SEPTIC TANK EXISTING \\ �� # / ( NO'S
DWELLING TO \ ! reT e
SCALE: 1" = 20 FEET BE REMOVED
\ PROPOSED
0 10 20 40 FT. \ NEW DWELLING
64'-2"x23'-8"
REVISIONS
NO. DATE DESCRIPTION
GENERAL NOTES:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE
DISPOSAL FACILITY ONLY.
2. ALL CONSTRUCTION METHODS AND
MATERIALS SHALL CONFORM TO MASS.
D.E.P TITLE 5 AND LOCAL BOARD
OF HEALTH REGULATIONS.
3. ALL PIPES LOCATED UNDER PAVEMENT
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL.
4. THERE ARE NO KNOWN PRIVATE WELLS
LOCATED WITHIN 150 FT. OF THE
PROPOSED LEACHING FACILITY NOR
ANY KNOWN WELLS PROPOSED WITHIN
150' OF ANY KNOWN LEACHING FACILITY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL, SUBSOIL AND OTHER
IMPERVIOUS MATERIAL.
6. REPLACE ALL EXCAVATED MATERIAL WITH
CLEAN GRANULAR SAND, FREE FROM ORGANIC
MATERIAL AND DELETERIOUS SUBSTANCES.
MIXTURES AND LAYERS OF DIFFERENT CLASSES
OF SOIL SHALL NOT BE USED. THE FILL SHALL
NOT CONTAIN ANY MATERIAL LARGER THAN
TWO INCHES. A SIEVE ANALYSIS, USING A #4
SIEVE, SHALL BE PERFORMED ON A
REPRESENTATIVE SAMPLE OF FILL. UP TO 45y
BY WEIGHT OF THE FILL SAMPLE MAY BE
RETAINED ON THE #4 SIEVE. SIEVE ANALYSES
ALSO SHALL BE PERFORMED ON THE FRACTION
OF FILL SAMPLE PASSING THE ,y4 SIEVE, SUCH
ANALYSES MUST DEMONSTRATE THAT THE
MATERIAL MEETS EACH OF THE FOLLOWING
SPECIFICATIONS:
100%. MUST PASS #4 SIEVE
(4.75 mm EFFECTIVE PARTICLE SIZE)
10%-100% MUST PASS #50 SIEVE
(0.30 mm EFFECTIVE PARTICLE SIZE)
07-207 MUST PASS #100 SIEVE
(0.15 mm EFFECTIVE PARTICLE SIZE)
07-57 MUST PASS #200 SIEVE
(0.075 mm EFFECTIVE PARTICLE SIZE)
7. EXISTING U71UTIES WHERE SHOWN
IN THE DRAWINGS ARE APPROXIMATE.
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY WITH DIG -SAFE
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING U11LITY SYSTEM IN SERVICE.
DIG -SAFE SHALL BE NOTIFIED PER
THE STATE OF MASSACHUSETTS
STATUTE CHAPTER 82, SECTION 409
AT TEL. 1-888-344-7233. THE
ENGINEER DOES NOT GUARANTEE
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
TAKEN FROM RECORD PLANS. THE
CONTRACTOR SHALL VERIFY SIZE,
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
S. THIS SYSTEM IS NOT DESIGNED FOR
TF:E USE OF A GARBAGE CRINDER.
A GARBAGE GRINDER IS NOT
RECOMMENDED DUE TO RECOGNIZED
ADVERSE IMPACTS TO THE LEACHING
FACILITY.
9. EXITING INVERTS ARE TO BE CHECKED BY
THE CONTRACTOR PRIOR TO CONSTRUCTION.
CONFIRM LOCATION do NUMBER OF INVERTS.
0. THE ENGINEER IS TO BE NOTIFIED OF
ANY FIELD CHANGES THAT MAY BE
REQUIRED.
T-
P)SC ('-Npo
349 Main Street, (RT. 28) Unit D
W. Yarmouth Massachusetts
02673
508 778 8919
PROJECT TITLE:
DESIGN FOR
SEWAGE DISPOSAL
SYSTEM
REPAIR/UPGRADE
#94
CRANBERRY LANE
SOUTH YARMOUTH
MASSACHUSETTS
PREPARED FOR:
CRAFTSBURY COMPANY, INC.
LADD KAUTZ
845 MAIN STREET, ROUTE 28
SOUTH YARMOUTH, MA 02664
(508) 760-0500
DATE: AUGUST 23, 2006
COMP. DESIGN: K. HEALY
CHECK: M. DIBB
DRAWN: K. HEALY
FIELD: D. GAZZOLO / J. McCARTIN
FILE NO. 9156-SEP.DWG
DWG NO. 5383-02
SHEET 1 OF 1
JOB NO. 4-9158.00
FILE COPY