Loading...
HomeMy WebLinkAbout137 Cranberry Lane Sewage System' SOIL TEST PIT DATA: 10/11/01 ,Arun 10/17/01 DISTRIBUTION BOX DETAIL: NOT To SCALE LEACHING DETAIL: ,. NO. OF OUTLETS ' TEST PIT TEST, PIT.. '�?2 TEST PIT- 63_ TEST PIT __JA__ TEST PIT TEST PIT TEST PIT. #L TEST PIT FINISHED GRAD 4" PVC NOT TO SCALE 25.5' 105:5 104.4 106.3 105.2 107.0 104.3 105.4 105.3 PIPE 00 °0 0° ° °o ocT o� 000 0 0 0 0 00 0 0 0 0 r 0 0 x GRD. EL. GIRD. GRD: EL GRD. EL GRD. EL: GRD: EL GRD. EL GRD. EL. 0 0 0 ° 0 0 00 0 0 0 0 0 0 0 0 c ` ST, .HIGH =GW. N/A EST. HIGH GN'. N/A EST. HIGH GHJ. N/A EST. NIGH GW. N/A EST. HIGH GW. N/A EST. HIGH GW. 93.5 EST, HIGH GW. N/A EST. HIGH GVS', N A COVER ABLE -- I--- 2" WALLS NOTES: a 3 Urf!TS o� 0/A A II SANDY LOAM < SANDY LOAM 8" 10YR 4/28. 1 0Y 4/2 B B LOAMY SAND SANDY LOAM 28" 28" 2.5y,6/6 2.5Y 6/ SILT LOAM SILT LOAM 120" 2.5Y 6/4 2.5Y 6/4 120". EL 95.2 EL = 97.5 FINE SAND FINE SAND 2.5Y 7/4 2.5Y 7/4 --, 6' 26" 114" n". A SANDY LOAM IOYP. 4/2 SANDY LOAM IOYR 5/6 SILT LOAM 2.5Y 6 /3 EL = 87.8 FINE SAND 2.5Y 6/4 9" 28" 129" , 192' EL .= 92.75 ""' EL = 95.3 EL 94.2 EL = 93.0 EL = 88.3 " 9" 32" 200" ° a:•+•,to:.v„+a;.v,,,, .v,;..: q" 1. DIST. BOX TO WITHSTAND H-10 LOADING o O O � o°I 56" 12.'-10" 6" `j- ata UNLESS UNDER PAVEMENT, DRIVES OR 0°� ���/// t I TRAVELED WAYS W`HFRF!N H-20 LOADING 0° 500 GALLON LEACH!r1G DP,YV."'LLS 0 ° °°0000000 °•: 0000 00 00 00 0000 00 0 U 0,- 0001 {i 15" SHALL APPLY. o o c0 00 00 00 0oso� o °o 00 0 00 0 32 6" '• 5,5" OUTL� 8 2. PROVDE INLET TEE OR BAFFLE WHERE I 33.5 - 1- SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR PLAN VIEW - LEACHING CHAMBER IN PUMPED SYSTEM. - �.., - 2' 3. FIRST TWO FEET OF PIPE OUT OF DIST. ED DISTURBED AREAS BOTTOM ON LEVEL ' - , . BOX TO BE LAID LEVEL. LOAM & SE STABLE BASE 6" R.IN, 3 4" TO cr?oss-s�cnori 1 1/2" c�uSHED ii7�77777T7T CO. ACTED FI LL 3i 61 12 1,!!P1!h"U".? STONE BASE 4. ALL PIPE CONNECTIONS AND CONCRETE 3' AX. VD r " " CONSTRUCTION SHALL BE WATERTIGHT.-M�- o° - , 0 0i T 15 1/2" .DATE. DATE, DATE. DATE. , DATE. DATE. DATE. DATE. r7 1/2 I 22'-10" 10/11/01 10/11/01 '- 10/11/01 10/11/01 10/17/01 10/17/01 10/17/01 '10/17/01 PLAN VIEW CROSS-SECTION d CHAh+R R r TEST'BY: TEST BY: TEST BY: TEST .BY: TEST BY: TEST BY: TEST BY: TEST BY: :WELLER & ASSOC. WELLER & ASSOC. WELLER & ASSOC.WELLER &: ASSOC. WELLER & ASSOC. WELLER & ASSOC. WELLER & ASSOC. WELLER & ASSOC. q ! ! WITNESSED BY: WITNESSED BY: WITNESSED BY: WITNESSED BY: WITNESSED BY: WIrnESSED BY: WITNESSED BY- WITNESSED BY: D/-1TUJi; BRUCE MURPHY, RS, BRUCE MURPHY,, RS BRUCE MURPHY, RS BRUCE MURPHY, RS BRUCE MURPHY, RS _BRUCE MURPHY, RS BRUCE MURPHY, RS BRUCE MURPHY, RS 4 PERC. RATE: PERC: RATE: PERC. RATE: PERC. RATE: PERC. RATE: PERC. RATE: PERC. RATE: PERC. RATE: VERTICAL DATURA: ASSUMED 'MIN./INCH MIN,/INCH MIN./LNCH MIN.ANCH-MIN.ANCH MIN./INCH MIN:/INCH MIN./INCH SOIL EVALUATOR SOIL EVALUATOR SOIL EVALUATOR SOIL EVALUATOR SOIL ETALUATOR " SOIL EVALUATOR SOIL EVALUATOR SOIL EVALUATOR BENCH MARK SET: TOP OF CONCRETE BOUND. ELEVATION 106.1 DAVE MASON DAVE MASON DAVE MASON DAVE MASON DAVE MASON DAVE MASON DAVE MASON DAVE MASON SOIL CLASS: SOIL CLASS: SOIL CLASS: SOIL CLASS: SOIL CLASS: SOIL CLASS: SOIL CLASS: ,.. $OIL CLASS: L.T.A.R. L.T.A.R. L.T.A.R. L.T.A.R. L.T.A.R. L.T.A.R. L.T.A.R LT.A.R. 0.74�G.P.D./SQ.FT. 0,74 G.P.D./SQ.FT. 0,74 G.P.D./SQ.FT. 0.74 G.P.D./SQ.FT. 0,74 G.P.D./SQ.FT. 0,74 G.P.D./SQ.FT. 074-G.P.D./SQ.FT. 0.74 G.P.D./SQ.FT. NOTE: N/F BENCHMARK.TOP OF BOTTOM OF HOLE TO BE INSPECTED KARL L. JOEL CONCRETE souND BY B.O.H. AND DESIGN ENGINEER PROFILE: NOT TO 'SCALE r INDICATES HIGH GROUNDWATER COMPUTATION A MAP 11 ELEVATION 106.1 PRIOR TO SEPTIC INSTALLATION. � ASSESSORS 9 EL = A OBSERVED - BASED ON TP #)6 PARCEL 4 FIRST PIPE LENGTH GROUND WATER TOP FOUNDATION' TO BE SET LEVEL: (TOWN WATER) I , CONCRETE COVERS TO WITHIN DEPTH TO BOT. OF HOLE). 16.5 EL 106.1 6" OF #TNISHED GRADE FOR MIN. 2' INDICATES ABANDONED WELL FINISH GRADE INDEX WELL AIW-247 �+_ ESTIMATED L.=106.105.5 SEASONAL HIGH WATER LEVEL RANGE ZONE _ B BY dWNER 43 CENTERBOARD 4" PVC 40 GROU�ID,'WATER CUP,RENT DEPTH+ff1NDEX WELL(10/O1)--26--4- �'' � I �, •r WATER LEVEL ADJUSTMENT 5.7- \ � LAN :SOH 40• t, 4 PVC SCH 40 LEACHING CHAMBER .. DEPTH TO ADJUSTED HIGH WATER 10.8 INDICATES', � „_ . CRA* IDOO PERC.. 'um 0 TEST Ib. ,. i .. o .':S.OUTLET 1=F . -_. 41 .8 DIST. BOX 5' MIN. SEN TION INDICATES .51SEFTIC TANKUNSUITABLE L MATERIAL EST. HIGH GROUNDWATER .-.-: � r �. Z9 N/F _ i 6 II . ' WESLEY W ISE R ERG123.7 ASSESSORS MAP 119SEPTIC TANK DETAIL.1,500 GALLON - N623;.. PARCEL 5 (TOWN WATER) NOT TO SCALE w \� 129 DRIFTWOOD LANE NOTES: 1. .SEPTIC TANK SHALL BE STEEL 5. IN AND OUTLET.TEES TO BE CAST IRON, D i - REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. \ \ \ 2. SEPTIC TANK TO WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. \ ` ,{\ \ I kOF UNLESS UNDER PAVEMENT, DRIVES OR \ / \ \ ar '4if TRAVELED WAYS, WHEREIN H-20 LOADING TP I SHALL APPLY. \ - / , 4 \ / < DAVID O 3. ALL PIPE CONNECTIONS AND CONCRETE - G� ��-}�..` S CRISPIN v ' CONSTRUCTION -SHALL BE WATERTIGHT. ;' 2-24 DIA CONCRETE MANHOLES *'� Q CIML ' 4. FILL ALL UNUSED KNOCKOUTS WITH TO fi METAL OF FIN SHH GRADROUpiT ` ( y� \ _ \ •,TP#8 \ No. I MORTAR. TEE TO BE UNDER 12' MIN: \ M.H. OPENING VER HIGHPOINT IN ROAD w F - LIMITS OF 3 �.EXCAVATION#1 TP 3 t rt" ELEV 105.17 SEE NOTES O' � s RAISERI.HW/� \`-'• 10 -6 SEWER BRICK ...: \ 5 AND 610 - t :. :I& MORTAR_- .-\� - - TN ::`�-� c� Q . - •�'+-.. { NORMAL WATER LEVEL y \ .. .• t q # A s TEST PIT TPI 1 \ (i FlIT _ TES T l 14 106.5 107,6 PRECAST :SEPTI -TANK GRD. EL. GRD. EL. N/AN/A _- _ IT :. 4 9 EST. HIGH GW. _L._ EST. HIGH GW. N A .. 1 ... '- •z � _ �_ � � V LE 5. FILL ALL UNUSED KNOCKOUTS WITH T ° GAVIN 0 0 DEED BOOK 14400, PAGE 244 3 LAYER MORTAR. 6 q•_ MIN, 0 WCOUT 1_. 3 ZONING DISTRICT: R-40' _ V ' LQUID DEPTH TH PEASTONE REMOVE SIDE 20 34" O 0 a 40,000 S.F. :• 24,8261 S.F. O QT r h- UNSU'TAP! <5 % OF Nc, 4 S!FVE SHALL E NOT A ZONE 11 O0 7. EXISTING UT4JTES N, IERE SHO'AN Cr�� "C", DATED 7/2/92 O _F ALU a q)0 DIG -SAFE SHALL BE NOTIFIED PER PLAN VIEW &" MIN; 3 a' .To �^�o9a - / CROSS-SECTION �rao/zc: VIEW 0 O THEIR ACCURACY OR THAT ALL ;DEPTH 5'AARODt 1 1/2" STONE 1 Bio 0C� 000� M o\ '1 8. T-tS SYSTEM IS NOT DFSIG 7 r, F{Y-? { THE USF OF A GARPACE OrI -F'P A'GARDAOr' C2.1DDE'? IS NO _ 4.. P,ECOMIV-NDED auF TO PrCO{'*r•Zrn p . INVERT ELEVATIONS. FA1 i ct, Y. 1 9. EXITING INV 2TS ARE TO PT Cl -'l -r.5 r" THE CONTRACTOR P -'O4 TO CO rC, THE ENGNEER I^ TO C'. ttn C" ANY FIELD CHANGES TWAT t! t RL' REQU'^ED. BSC GROT JP -- 657 Main Street, (FT. 28) Unit 6 ' 561, TOP OF FOUNDATION 107.2 A 508 778 8919 PROJECT TITLE: WASHED HED STONE A LOAMY SAND 2.5Y 4/3 B LOAMY SAND 2.5Y,7/4 . MEDIU SAND 2.5Y 7/2 . MEDIUM SAND 7.5YR 4/4 MEDIUM SAND 2.5Y 7/2 MEDIU A SAND. 7.5YR 4/2 MEDIUM SAND 2.5Y 7/2 12 36" : 60: 63 75" 128" 134" A LOAMY SAND ' 2:5Y 4/3 - B LOAMY SAND 2.5Y 7/4 ' I C-1 AN ED UM SAND 2.5Y 7/2 MEDIUM SAND 7.5YR 4/4, MEDIUM SAND 2.5Y 7/2 7 \ � r JiS. Y , F i G� Cj (� O '\ 4 1 • ,'r 00 ; TP 12" .. SEPTIC \• TP T, ANK , x V -\. -., 2d 36 S 10 i MIN \ 1, \ 7 �,. � 2 'PROPOSED <: 4 \ DECK •'GARAGE t + TOP OF'.SLAB 84" 04 , k l 1 EL 106:2 l r, t .PROPOSEDco 00 O, ` N `. �4BED0M1 o DWELLING TOF. 107.2 I F.F. 108.2Ap " t a _ I oo _ 192 � o � / " I 104.07 E EL = 91.0 EL = 91.6 1.4.'. 6• m 4 INVERT AT DIST. BOX ,( N) , p " �? 4 INVERT AT DIST.: BOX (OUT),103.90 F DATE. DATE: p \ �• i / a, 7/10/02 7/10/02 INVERTS AT LEACHING FACILITY: pr, 1; TEST BY. TEST. 8Y. p , :'_ ,,._ k0_- �., .r•� r - , 4" ;INVERT AT -BEGINNING THE BSC GROUP, INC. THE BSC GROUP: INC. OFLEACHING CHAMBER 103.8 G WITNESSED BY: WITNESSED BY: 5 / / cn V ''/'•' Jam., / J ... BRUCE MURPHY, RS BRUCE MURPHY. RS N/F, n ELSIE M. _MULLEN ELEVATION AT BOTTOM PERC. RATE: PERC. RATE: ASSESSORS: MAP 119 " " . �`(+\/ 1 r _ p R y OF LEACHING CHAMBER 101.8 .H _MIN./INCH MIN./INCH PARCEL 2 - - / yyP / • �, ADJUSTEDSOIL EVALUATOR SOIL EVALUATOR (TOWN WATER) /' 1 � G G 93.5 J CRAIG FIELD CRAIG FIELD 131 CRANBERRY LANE / �N •/ . „ 5 GROUNDWATER / ��\5 / y PLAN VIEW SOIL CLASS: SOIL CLASS: '' • / i �.: - r/ / SCALE: 1' _ .20 FEET Q- VARIANCES REQUESTED: L.T.A.R. L.T.A.R. .� € Q.P.D./SQ.FT. 74 G.P.D,/SQ.FT. 1 / r / 40 FT. o NONE o 10 20 DESIGN! CRITERIA: DESIGN FLOW: '+ BEDROOMS AT110G.P.B./D 440 G.P.D. REQUIRED SEPTIC TANK: 440 X, 200% = P80 GAL. SEPTIC TANK PROVIDED: = 1_9_(?_GAL. SIZE OF LEACHING FACILITY REQUIRED: DESIGN PERC. RATE: <2 MIN./ INCH LONG TERM APPL. RATE 0,74 G.P-D/S.F. 440 GPD + 0.74 GPD/SF 595 S.F. SIZE OF LEACHING FACILITY PROVIDED: USE 500 GALLON CONCRETE LEACHING CHAMBERS(3 UNITS) 12,83'x2'x33.5' SIDEWALL = 2(12,83'+33,5') X 2' = 185.3 BOTTOM = 12.83' X 33.5' = 429,8 615S.F. _615 S,F x 0,74 GPD/SF 455GPD LOCUS INFORMATION CURRENT OWNER: STEPHEN L. & ANNMAP,IE D. " GAVIN L, DEED BOOK 14400, PAGE 244 PLAN REFERENCE: cn 6 q•_ MIN, 0 WCOUT 1_. 3 ZONING DISTRICT: R-40' _ V ' LQUID DEPTH TH TEL G°ONRL e' SIDE 20 b m a 40,000 S.F. :• 24,8261 S.F. OVERLAY DISTRICT: QT r h- , N \ r r <5 % OF Nc, 4 S!FVE SHALL ZONE: NOT A ZONE 11 FEMA FLOOD 7. EXISTING UT4JTES N, IERE SHO'AN ZONE DISTRICT: "C", DATED 7/2/92 SIBLE FOR PROPERLY LOCATING AND PANEL /€250015 0002 D STRUCTION ACTIVITY WITH, DIG -SAFE a BOTTOM ON LEVEL STABLE BASE b3' t3- EXISTING UTILITY SYSTEM IN-'SEP,MCE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS PLAN VIEW &" MIN; 3 a' .To �^�o9a - / CROSS-SECTION �rao/zc: VIEW ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSUPFACE STRUCTURES 1 1/2" STONE ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS THE - CONTRACTOR SHAH VERIFY SIZE, LOCATION AND INVERTS Or UTILITIES M TO THE START Or CONSTRUCT,,^N. '1 8. T-tS SYSTEM IS NOT DFSIG 7 r, F{Y-? { THE USF OF A GARPACE OrI -F'P A'GARDAOr' C2.1DDE'? IS NO _ P,ECOMIV-NDED auF TO PrCO{'*r•Zrn p . INVERT ELEVATIONS. FA1 i ct, Y. 1 9. EXITING INV 2TS ARE TO PT Cl -'l -r.5 r" THE CONTRACTOR P -'O4 TO CO rC, THE ENGNEER I^ TO C'. ttn C" ANY FIELD CHANGES TWAT t! t RL' REQU'^ED. BSC GROT JP 657 Main Street, (FT. 28) Unit 6 ' W. Yarmouth Massachusetts TOP OF FOUNDATION 107.2 A 508 778 8919 PROJECT TITLE: SEWAGE C DISPO SAL SYSTEM DESIGN N " 4 INVERT AT'BUILDING, ` 104.75 B CRANBERRY LADE SOUTH YARMOUTH 4" INVERT AT SEPTIC TANK . (IN) 104.49 C J 0 4'E. INVERT AT SEPTIC TANK `(OUT) 104.24 D PREPARED FOR:' A LOAMY SAND 2.5Y 4/3 B LOAMY SAND 2.5Y,7/4 . MEDIU SAND 2.5Y 7/2 . MEDIUM SAND 7.5YR 4/4 MEDIUM SAND 2.5Y 7/2 MEDIU A SAND. 7.5YR 4/2 MEDIUM SAND 2.5Y 7/2 12 36" : 60: 63 75" 128" 134" A LOAMY SAND ' 2:5Y 4/3 - B LOAMY SAND 2.5Y 7/4 ' I C-1 AN ED UM SAND 2.5Y 7/2 MEDIUM SAND 7.5YR 4/4, MEDIUM SAND 2.5Y 7/2 7 \ � r JiS. Y , F i G� Cj (� O '\ 4 1 • ,'r 00 ; TP 12" .. SEPTIC \• TP T, ANK , x V -\. -., 2d 36 S 10 i MIN \ 1, \ 7 �,. � 2 'PROPOSED <: 4 \ DECK •'GARAGE t + TOP OF'.SLAB 84" 04 , k l 1 EL 106:2 l r, t .PROPOSEDco 00 O, ` N `. �4BED0M1 o DWELLING TOF. 107.2 I F.F. 108.2Ap " t a _ I oo _ 192 � o � / " I 104.07 E EL = 91.0 EL = 91.6 1.4.'. 6• m 4 INVERT AT DIST. BOX ,( N) , p " �? 4 INVERT AT DIST.: BOX (OUT),103.90 F DATE. DATE: p \ �• i / a, 7/10/02 7/10/02 INVERTS AT LEACHING FACILITY: pr, 1; TEST BY. TEST. 8Y. p , :'_ ,,._ k0_- �., .r•� r - , 4" ;INVERT AT -BEGINNING THE BSC GROUP, INC. THE BSC GROUP: INC. OFLEACHING CHAMBER 103.8 G WITNESSED BY: WITNESSED BY: 5 / / cn V ''/'•' Jam., / J ... BRUCE MURPHY, RS BRUCE MURPHY. RS N/F, n ELSIE M. _MULLEN ELEVATION AT BOTTOM PERC. RATE: PERC. RATE: ASSESSORS: MAP 119 " " . �`(+\/ 1 r _ p R y OF LEACHING CHAMBER 101.8 .H _MIN./INCH MIN./INCH PARCEL 2 - - / yyP / • �, ADJUSTEDSOIL EVALUATOR SOIL EVALUATOR (TOWN WATER) /' 1 � G G 93.5 J CRAIG FIELD CRAIG FIELD 131 CRANBERRY LANE / �N •/ . „ 5 GROUNDWATER / ��\5 / y PLAN VIEW SOIL CLASS: SOIL CLASS: '' • / i �.: - r/ / SCALE: 1' _ .20 FEET Q- VARIANCES REQUESTED: L.T.A.R. L.T.A.R. .� € Q.P.D./SQ.FT. 74 G.P.D,/SQ.FT. 1 / r / 40 FT. o NONE o 10 20 DESIGN! CRITERIA: DESIGN FLOW: '+ BEDROOMS AT110G.P.B./D 440 G.P.D. REQUIRED SEPTIC TANK: 440 X, 200% = P80 GAL. SEPTIC TANK PROVIDED: = 1_9_(?_GAL. SIZE OF LEACHING FACILITY REQUIRED: DESIGN PERC. RATE: <2 MIN./ INCH LONG TERM APPL. RATE 0,74 G.P-D/S.F. 440 GPD + 0.74 GPD/SF 595 S.F. SIZE OF LEACHING FACILITY PROVIDED: USE 500 GALLON CONCRETE LEACHING CHAMBERS(3 UNITS) 12,83'x2'x33.5' SIDEWALL = 2(12,83'+33,5') X 2' = 185.3 BOTTOM = 12.83' X 33.5' = 429,8 615S.F. _615 S,F x 0,74 GPD/SF 455GPD LOCUS INFORMATION CURRENT OWNER: STEPHEN L. & ANNMAP,IE D. CONSTRUCTION OF Tt{E SEWAGE GAVIN TITLE REFERENCE: DEED BOOK 14400, PAGE 244 PLAN REFERENCE: PLAN BOOK 120, PAGE 119 ASSESSORS MAP: 119 PARCEL: 3 ZONING DISTRICT: R-40' SETBACKS: FRONT 30' 5 V�TH!N Llt,T 07 EX.,AVAT^I F'"0'T SIDE 20 b REAR 20' MINIMUM LOT SIZE: 40,000 S.F. EXIST TOTAL 0 AL LOT AREA: 24,8261 S.F. OVERLAY DISTRICT: NO NITROGEN SENSITIVE <5 % OF Nc, 4 S!FVE SHALL ZONE: NOT A ZONE 11 FEMA FLOOD 7. EXISTING UT4JTES N, IERE SHO'AN ZONE DISTRICT: "C", DATED 7/2/92 SIBLE FOR PROPERLY LOCATING AND PANEL /€250015 0002 D LOCUS PLAN: NO SCALE FOLLINS POND , 0 REVISIONS NO. DATE DESCR'n3PO i ,'Oy GENT -RA NO 1. THIS PLAN IS FOR DESIC'.' AND CONSTRUCTION OF Tt{E SEWAGE D'SPOSAL FACILITY C":LY. n MATERIALS SHALL CCNFORH TO MASS, D.E.P TITLE 5 AND LOCK L BOARD LOCUS 3. ALL PIPES LOCATED t'^:OLP PAV^t ZNT OR TRAVELED Vv'AY SHALL Pr SCHEDULE 40 OR EQ'JA'_. e z Z PROPOSED LEA CI Fo c, I -J l Y t. 150' G ANY KN')W LFF(,,lf FAGI'.ITY, 5 V�TH!N Llt,T 07 EX.,AVAT^I F'"0'T Fri 2D b 73 DINAHS OR OTHER CLEAN GRANULAR SOILS r POND Z SIEVE ANALYSIS: 10- (MAX) BY V.?. SHALL : 0 REVISIONS NO. DATE DESCR'n3PO i ,'Oy GENT -RA NO 1. THIS PLAN IS FOR DESIC'.' AND CONSTRUCTION OF Tt{E SEWAGE D'SPOSAL FACILITY C":LY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CCNFORH TO MASS, D.E.P TITLE 5 AND LOCK L BOARD Or HEALTH REGU ATQNS. 3. ALL PIPES LOCATED t'^:OLP PAV^t ZNT OR TRAVELED Vv'AY SHALL Pr SCHEDULE 40 OR EQ'JA'_. e 4 THERE ASF NO VN )kP:N Pr, Ve Y -t l '. LOCATED V"T'IN 150 FT CF' T+ PROPOSED LEA CI Fo c, I -J l Y t. 150' G ANY KN')W LFF(,,lf FAGI'.ITY, 5 V�TH!N Llt,T 07 EX.,AVAT^I F'"0'T ALL TOrS01' , EUESC!L AND OTHER, IM"ERVIOJS MATERIAL. 6. REPLACE WITH CLEAN WASI-IED SAND: OR OTHER CLEAN GRANULAR SOILS CONFORMING TO THE FO',_LOl!ING - SIEVE ANALYSIS: 10- (MAX) BY V.?. SHALL : PASS No. 50 SIEVE <10 % OF No. 4S!EVF. SHALL PASS No. 100 <5 % OF Nc, 4 S!FVE SHALL PASS No, 200 UNIFORMITY COEFFICIENT C No. 4 SIEVE </=6.0 - 7. EXISTING UT4JTES N, IERE SHO'AN IN THE DP,AW!NGS ARE APPROXIMATE. THE CON'MACTOR SHALL Fr RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINAT.NG THE PROPOSED CON- STRUCTION ACTIVITY WITH, DIG -SAFE AND THE APPLICABLE UT?UTY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN-'SEP,MCE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER E2, SECTION 409 AT TEL 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSUPFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS THE - CONTRACTOR SHAH VERIFY SIZE, LOCATION AND INVERTS Or UTILITIES AND STRUCTURES AS R7OU7 D Pit!^R TO THE START Or CONSTRUCT,,^N. '1 8. T-tS SYSTEM IS NOT DFSIG 7 r, F{Y-? { THE USF OF A GARPACE OrI -F'P A'GARDAOr' C2.1DDE'? IS NO _ P,ECOMIV-NDED auF TO PrCO{'*r•Zrn ADVERS' IMPACTS TO TF'r LEA l FA1 i ct, Y. 1 9. EXITING INV 2TS ARE TO PT Cl -'l -r.5 r" THE CONTRACTOR P -'O4 TO CO rC, THE ENGNEER I^ TO C'. ttn C" ANY FIELD CHANGES TWAT t! t RL' REQU'^ED. BSC GROT JP 657 Main Street, (FT. 28) Unit 6 ' W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: SEWAGE C DISPO SAL SYSTEM DESIGN -11137 Yr . CRANBERRY LADE SOUTH YARMOUTH MA 02664 J 0 PREPARED FOR:' I L' � Mr, TIM WILLIAMS 5 :'� WILLIAMS BUILDING CO ULC. _� P.O B0X 272 YARMOUTHPORT, MA 02675 DATE: 7/17/02 COMP. DESIGN: K. HEALY ` CHECK: D. CRISPIN DRAWN:.. P. HAGIST FIELD: D. GAZZOLO, / J. McCARTIN FILE NO. 8422•-SEP.DWG DWG NO.'5375-01 SHEET 1 OF 1 JOB NO. 4-8422.00 07-14/70