Loading...
HomeMy WebLinkAbout150 Cranberry Lane Site and Sewage PlanFOLLINS POND ASSESSORS MAP: 107 PARCEL: B 26 *T CURRENT ZONING: R-40 (1954 SUBDIVISION) 1V KEY. EXISTING CONTOUR: — — — — PROPOSED CONTOUR. .•.•••••••••••••••••••••.••... EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: 4� UTILITY POLE: -0- FENCE o-FENCE LINE: — HYDRANT: -6 RETAINING WALL: TREE: DM # 97-024 (D24F15) -91 ST HOLE LOGS ENGINEER: DAVID MASON, R.S. WITNESS: AMY VON HONE, R.S. DATE: 12-5-96 _ PERCOLATION RATE. < 2 MIN/IN TH-1 TH-2 45.0 0 HORIZON ELEV 44.7 B1 HORIZON 4.. AMY AND >O 44.1 B2 HORIZON FINE LOAMY SAND LOAMY SAND IOYR 6/8 422 C HORIZON FINE SAND 25Y 7/2 ' T NO GROUNDWATER ENCOUNTERED 4310 ELEV 42.7 NOTES: 1. VERTICAL DATUM. ASSUMED FROM QUAD (NGVD +/-) 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0. 11. ALL UNSUITABLE SOIL (B2 AND C2 HORIZONS) WITHIN 5' OF LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. SEPTIC SYSTEM DESIGN FLOW ESTIMATE: -%q- BEDROOMS AT 110 GAL/DAY/BEDROOM = 330 CAL/DAY SEPTIC TANK: -Ok CAL/DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 INFILTRATORS (MAXIMIZER CHAMBERS WITH 4' OF STONE ALL AROUND (30' x If x 2' DEEP) SIDE AREA: (30 + 11)2 x 2 = 164 SF (.74) = 121 GAL/DAY BOTTOM AREA: 3O',a 1r = 3&0 St' (74) = 244 GAL/ DAY CAPACITY = 365 CAL/DAY SEPTIC SYSTEM SECTION 47.0 TOP OF FOUNDATION 41� 41.75 1500 GAL ELEV. SEPTIC TANK\ 42.0 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) DEMAREST—McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 HEST DENNIS, MASSACHUSETTS 02670 PHONE & FAX : (508) 398-7710 TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN AP w i LAw 01AL COVERS WITHIN 12" OF FINISHED GRADE 41.5 1;==;i ELEV. ` D -BOX 41.08 41.25 (6" OF ELEV. ELEV. STONE UNDER) THOMAS McLELLANTHOMAS McLELLAN, P.E. JOHN GAS BAFFLE AT OUTLET TEE 1�7 - i DATE. JOHN \ Z. DEMAREST.JR. No. 36859 MAREST JR.,-P.L.S ELEV. 42 EDWELLING ROPOSED BEDROOM445,Si16 GARAGE SS 26' PROPOSED DWELLING 2" PEASTONE 314--1 1/2" WASHED STONE ELEV: 40.0 37.5 <4 E ELEV. 30' 3 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (30' x 1P x 2' DEEP) SITE AND SEWAGE PLAN LOCATION 150 CRANBERRY LANE SOUTH YARMOUTH, MA PREPARED FOR- ROBERT ORROBERT & DIANE D'AGOSTINO SCALE: 1" = 30' DATE. 9/14/98 REFERENCE. PLAN BOOK 120 PAGE 119 Pl U/G/)rrll,- 4.. 0 HORIZON A HORIZON LOAMY SAND 10" 10YR 4/3 42. B HORIZON LOAMY SAND 26' 10YR 5/6 40A Cl HORIZON IU SAND MED48" 25Y 6 39, C2 HORIZON SANDY LOAM 50' 25Y 5/6 38. C3 HORIZON FINE SAND 32 25Y 7/2 32. NOTES: 1. VERTICAL DATUM. ASSUMED FROM QUAD (NGVD +/-) 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0. 11. ALL UNSUITABLE SOIL (B2 AND C2 HORIZONS) WITHIN 5' OF LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. SEPTIC SYSTEM DESIGN FLOW ESTIMATE: -%q- BEDROOMS AT 110 GAL/DAY/BEDROOM = 330 CAL/DAY SEPTIC TANK: -Ok CAL/DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 INFILTRATORS (MAXIMIZER CHAMBERS WITH 4' OF STONE ALL AROUND (30' x If x 2' DEEP) SIDE AREA: (30 + 11)2 x 2 = 164 SF (.74) = 121 GAL/DAY BOTTOM AREA: 3O',a 1r = 3&0 St' (74) = 244 GAL/ DAY CAPACITY = 365 CAL/DAY SEPTIC SYSTEM SECTION 47.0 TOP OF FOUNDATION 41� 41.75 1500 GAL ELEV. SEPTIC TANK\ 42.0 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) DEMAREST—McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 HEST DENNIS, MASSACHUSETTS 02670 PHONE & FAX : (508) 398-7710 TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN AP w i LAw 01AL COVERS WITHIN 12" OF FINISHED GRADE 41.5 1;==;i ELEV. ` D -BOX 41.08 41.25 (6" OF ELEV. ELEV. STONE UNDER) THOMAS McLELLANTHOMAS McLELLAN, P.E. JOHN GAS BAFFLE AT OUTLET TEE 1�7 - i DATE. JOHN \ Z. DEMAREST.JR. No. 36859 MAREST JR.,-P.L.S ELEV. 42 EDWELLING ROPOSED BEDROOM445,Si16 GARAGE SS 26' PROPOSED DWELLING 2" PEASTONE 314--1 1/2" WASHED STONE ELEV: 40.0 37.5 <4 E ELEV. 30' 3 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (30' x 1P x 2' DEEP) SITE AND SEWAGE PLAN LOCATION 150 CRANBERRY LANE SOUTH YARMOUTH, MA PREPARED FOR- ROBERT ORROBERT & DIANE D'AGOSTINO SCALE: 1" = 30' DATE. 9/14/98 REFERENCE. PLAN BOOK 120 PAGE 119 Pl U/G/)rrll,-