Loading...
HomeMy WebLinkAbout176 Cranberry Lane Site and Sewage Plan (2)ASSESSORS MAP: 128 PARCEL: 14.2 CURRENT ZONING: R-40 MINIMUM BUILDING SETBACKS: FRONT: 30' SIDE: 20' REAR: 20' FLOOD ZONE: C LOCATION MAP LOT 2 (40,295 SF) 4P� w0�//98 0 / 96 BENCHMARK AT MAG NAIL / /94 ELEVATION = 100.0 98.8 4" , / / / / / / // // / /90 / 98.8 90 G \� 99.1 �e9 1 ii / / / I /X / / / I I 92 94 .5 �!too- /1012 4 / 99 100_ 102 m 1104 96 \ \ \ \ 98 \ 1 oQ S6 j / // 94 92 92 \ \ \ \ \ 104 - 94 96 102 / 1 \\" 98 / 100 KEY: EXISTING CONTOUR: - - - PROPOSED CONTOUR: ...................... EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOOELEVATION: 25.3 TEST HOLE: UTILITY POLE: -o- FENCE LINE: - - - HYDRANT: RETAINING WALL: JOB N M4-23 to N V4 e ld'.11% TEST HOLE LOGS NOTES: ENGINEER: THOMAS McLELI.AN, P.E. 1. VERTICAL DATUM: ASSUMED WITNESS: DAVID FLAHERTY, R.S. 2. MUNICAPAL WATER IS AVAILABLE. DATE: 1-12-05 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. PERCOLATION RATE: < 5 MW/ INCH 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH TSI -I 91.5 TH-2 86,0 AASHTO H-20 LOADING SPECIFICATIONS. ELEV. ELEV. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). O/A HORIZON LOAMY SAND O/.A HORIZON LOAMY SAND 6. OF OUT OF LEVEL. 6" IOYR 311 91.0 10" 10YR 3/1 85,2 FIRST 2' PIPE D-BOXTO BE SET 1 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE B HORIZON B 130RIZON USE OF A GARBAGE DISPOSAL. LOAMY ::AND LOAMY SAND 36" IOYR 5/6 88.5 48" IOYR 516 92.0 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL C HORIZON C HORIZON HEALTH REGULATIONS. LOAMY SAND LOAMY SAND 2.5Y 613 2.5Y 6/3 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 168-1 77.5 -144" 74.0 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3' NO GROUND WATER ENCOUNTERED 11. ALL UNSUITABLE SOIL. (B HORIZON, APPROX. 48" DEEP) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 5 BEDROOMS AT 110 GAL / DAY --MQ- GAL / DAY SEPTIC TANK: 550 GAL/ DAYS_ DAYS = 1100 GAL USE GALLON SEPTIC TANK LEACH;NG AREA: USE J INFILTRATOR CHAMBERS (MODEL 3050) WITH 4' OF STONE ALL AROUND (415'x 12.2'x 2' DEEP) Y ;E Pu ri: 143.5' + !2.2') x ., s 2 223 SF_ (0.7:) - 1,:5 CnuTiA i ZCTTOM AREA: 43.5' x 12.2' _• 531 SF (0.74) = 393 GAL./DAY t CAPACITY = 558 GAL/DAY SEPTIC SYSTEM SECTION COVERS WITHIN 12" OF 100.0 FINISED GRADE TOP OF FOUNDATION (ONE INSPECTION COVER �,'y�Q¢S� I O BE WITHIN 6" OF GRADE) X04 ` IT7 T7 T7 TEE AT IP7 87.75 ELEV. 84.7786.0 1500 GAL ELEV. ELEV. SEPTIC TANK D -B (6" OF STOP 90.0 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) (UNDER SLAB) GAS BAFFLE TEE SIZES: AT OUTLET TEE INLET: 6"M), 13" DOWN OUTLET: 6" UP, 14" DOWN '}i'vs,i ItiF..A a_G47t I L -, u �J y THOMAS McLELLAN, P.E.ENMS P.O. BOX 1163, EAST D, MA 02641 5M S-3426 s. LN" Mo. 37M MICHAEL LADUE, P 51 CAPTAINS VIUAGE LANE BRMTER, MA 02631 E UNDER" ELEV 14' kR 14'3.5 PCH DECK 24' 37'8.5" PROPOSED 5 BEDROOM 28' 131.5" DWELLING GARAGE 74'3.5" F 38' PROPOSED DWELLING 2"PEASTONE 3/4" -1 1/2" WASHED STONE V MAX. COVER (I'MIN) �ELEV.= 83.0 --L // m = 82.5 4 > ^E4 ELEV. E 43.5' 5 INFILTRATOR CHAMBERS (MODEL 3050) WITH 4' OF STONE ALL AROUND (43.5'x 12.2'x 2' DEEP)