Loading...
HomeMy WebLinkAbout125 Crowell Road - FramingLEGEND Bearing Wall Below Bearing Wall Above L------------ Pon-Bearing ---- ----Non-Bearing Wall Below ..... e. .._...,.a....._ . ---7_17 __. __ ... 1__.p__ _... - Non -Bearing Wall Above Post Below Post Above Post Above & Below M 25 Last Saved Date: 1/13/2005 4:40 PM Print Date: 1/14/2005 4:52 PM Staggered Multiple Member Beams Side Loaded Connection 1/2" dia. Pott (b) Marne M2MlF 1314" —12" dia. 2 Bolt (b) 3 z Max Uniform Load �( lbs. per lin. f. ) 24" o.c. 12" o c.II 6" oe. 500 1 1000 2000 375 750 1500 330 670 1330 min. (a) 7' w Wo members must be loaded from both sides. (b) Design values appy to common bots (grade 5 or higher) Use natw ashers each side and drill holes Il ' do. (c) ARvotues In the table above maybe Increased 15% for snow loaded roofs a 25% for non -snow roots w here code allow s. Member Connection Bc N.1 Multiple Member Beams Side Loaded Connection 1 3/4" Versa -lam Nail Pattern 16d common nails. See chart Max. Uniform Load (lice. per in. ft) N umberof grows 3rows Members min. 2 520 790 3(.) I 390 ! _585 ( a ) Nail pattern for 3 - piece member must occur on both sides. Nail values may be Increased by 15% for snow - load roofs and by 25% for non - snow roofs where building code allows. Multiple Member Connection Nail 1 •' N.T.S. Nail each erid with 1 -3" (10d) nail , IMP minimum end bearing length at all floor and roof details. ::: ,� Attachment at End t( IJ1_.J, N.T.S. 25 Load AJS i. blocking Panet. Use 3" (too) nails at 6" o.c. `�',J�L/'iking Panels at Interior Bearing -E N.T.S. Level 1 1/4 11111 = 11.011 �--- Solid block all posts from above to bearing below. Post Load Transfer N,T.S. Toe nal rim board to plate w lh 2%1(6d) naffs at T o.c. or with 31A" (16d) nals at 12" ox. raw yen euig. Rim Board N.T.S. Joist VG1JG-1_0111 LVL beam ( c, LVL Header Opening r to N.T.S. Level 1 Framing Schedule - Nominalized Mark Qty Description Length 1 2 9 1/2" AJSTM 20 MSR 38'0" 2 1 9 1/2" AJSTM 20 MSR 36' 0" 3 1 9 1/2" AJSTm 20 MSR 34' 0" 4 12 9 1/2" AJSTM 20 MSR 32'0" 5 8 9 1/2" AJSTM 20 MSR 28' 0" 6 13 9 1/2" AJSTM 20 MSR 26'0" 7 1 9 1/2" AJSTM 20 MSR 24'0" 8 3 9 1/2" AJSTM 20 MSR 14'0" 9 2 9 112" AJSTM 20 MSR 12'0" 10 1 9 1/2" AJSTM 20 MSR 8' 0" 11 4 9 1/2" AJSTM 20 MSR 6-0" 12 3 9 1/2" AJSTM 20 MSR 4' 0" 13 1 5 1/4" x 11 1/4" VERSA -LAM@ 3080 DF 12' 0" 14 1 5 1/4" x 117/8" VERSA -LAME) 3080 DF 28'0" 15 1 5 1/4" x 11 7/8" VERSA -LAM@ 3080 DF 24' 0" 16 1 51/4" x 117/8" VERSA -LAM@ 3080 DF 22'0" 17 1 1 3/4" x 9 1/2" VERSA-LAMO 3100 SP 28'0" 18 1 1 3/4" x 9 1/2" VERSA -LAM@ 3100 SP 24'0" 19 3 1 2'4" x 9 1/2" VERSA-LA%'�_ 3100 SP 1E' 0" 20 4 1 314" x 9 1/2" VERSA-LAMJ 3100 SP 160" 21 1 1 3/4" x 9 1/2" VERSA -LAM@ 3100 SP 14'0" 22 1 1 3/4" x 9 1/2" VERSA -LAM@) 3100 SP 8'0" 23 9 1 3/4" x 9 1/2" VERSA -LAM@ 3100 SP 4'0" 24 BLK 9 1/2" AJSTM 20 MSR 84' 0" 25 TL 1 1/8" x 9 1/2" BC OSB RIM BOARDTM 96' 0" Level 1 Accessory Schedule Mark Qty Manufacturer Product Description H1 4 Simpson Strong -Tie Inc. HGUS410 3-1/2 x 9-1/4 to 14 V -Lam Face Mount H2 5 Simpson Strong -Tie Inc. ITT39.5 2-1/2 x 9-1/2 Top Flange Rmboerd and AJS "side-by-side. Will rir 2Y:" (t F13 -C Exterior End Wall Support N.T.S. REVISIONS: I rn Z0 wwo �LLJ LLI W W i—�wL. OCf)>w ZL¢m W �- gpZ J Q Notes: Shop drawings, typical and framing plans, oul Installation procedures Identification marks, s submitted for approval project architect and/ori Exact quantities and len the responsibility of the c Contractor Is to verify al and joists at their exact 1 The floor system (1 -Joist, designed for floor loads Roof loads from rafters, and beams must bear on walls and Interior walls wi straight through to a foot roof loads carried by the % must be so indicated on th Plan submitted to us for 1 Product to be stored, ban Installed In accordance manufacturer's recommei Vit to 7 U L) rn N dU con O r t0 d M 0 0 N N O N V- 4) 03 L T BC FRAMER@ 2002 SCALE: 1/4" = 11-011 DATE: 1/13/2005 BY: be FILE: Mcphee Assoc Fahey.t DWG: SHEET: 1 / 2