Loading...
HomeMy WebLinkAbout125 Crowell Road - Framing 2LEGEND Bearing Wall Below Bearing Wall Above ------------ I- - - - - - - - - - - - - Non Bearing Wall Below Non -Bearing Wall Above L. - _ Post Below Post Above ® L Post Above & Below 25 Stagg Multiple Member Beams Side Loaded Connection 1/2" dia. Colt (b) We& Mertd �--3/4" .Bolt Spacing 12"dia. � —I :!i Bolt (b) 3 F50 ve 4 (a) Max Uniform Load (Ibs. perlin. ft.) 24 pc12"oc 6"o.c. Lam 500 11 1000 2000 375 750 1500 330 670 1330 min. (a) 7" w Me members must be boded from been sides. (b) Design values apply m common bots (grade 5 or higher) Use thtwashers each We and drill holes la'dui. (c) Allvalues inure bible above MY be increased 16% for snow Macao roofs al 25% for neo-. now roots w here code a lbw S. Member N.T Mufliple Member Beams Side Loaded Connection 1 3!4" Versa -Lam Nail Pattern 12"oc ,-16d common nails Max Uniform Load -- - See chart (lb., per In. ft. ) Number of 2rowsi3 rows Members _ 2" min. 2 52o 780 III—{I- II1, 3 (a)� 390 585 ( a ) Nail pattern for 3 - piece member must occur on both sides. Nail values may be Increased by 15% for snow - bad roofs and by 25% for non - snow roofs where building code allows. F49 Multiple Member Connection Nail N.T.S. Nail each edd with 1 -3" (10d) nail I� 1'h" minimum end bearing length at all floor and roof details. r_. Attachment Attachment at End N.T.S. 25 Load Bearir Wall AJS'" Blocking Panel. Use 3" (10d) nails at 6" o.c. F13-E'kin Panels at Interior Bearing N.T.S. Level 1 1/4 11 /411 = 1 1.011 Last Saved Date: 1/13/2005 4:40 PM Print Date: 1/14/2005 4:52 PM '--- Solid block allposts from above to bearing below. F08 Post Load Transfer N.T.S. Toe not rim board to plate w Ih 2%' (8d) nets at 6' o.c. or wth WS" (16d) nals at 12' o.c. or ........rvu•.-" e_ F14- Rim Board N.T.S. Joist LVL beam F19 LVL Header Opening N.T.S. Level 1 Framing Schedule - Nominalized Mark Qty Description Length 1 2 9 112" AJSTM 20 MSR 38'0" 2 1 9 1/2" AJSTm 20 MSR 360" 3 1 9 112" AJSTA4 20 MSR 34' 0" 4 12 9 1/2" AJSTM 20 MSR 32' 0" 5 8 9 1/2" AJSTM 20 MSR 28'0" 6 13 9 1/2" AJSTM 20 MSR 260" 7 1 9 1/2" AJSTMI 20 MSR 24'0" 8 3 9 112" AJSTm 20 MSR 14'0" 9 2 9 1/2" AJSTM 20 MSR 12' 0" 10 1 9 112" AJSTm 20 MSR 8101, 11 4 9 1/2" AJSTm 20 MSR 6' 0" 12 3 9 1/2" AJSTM 20 MSR 4'0" 13 1 5 1/4" x 11 1/4" VERSA -LAM@ 3080 OF 170" 14 1 51/4" x 117/8" VERSA-LAMO 3080 OF 28' 0" 15 1 5 1/4" x 117/8" VERSA -LAM@ 3080 OF 24'0" 16 1 5 1/4" x 11718" VERSA-LAMO3080 OF 22'0" 17 1 13/4" x 9 1/2" VERSA-LAMO 3100 SP 28' 0" 18 1 1 3/4" x 9 1/2" VERSA -LAM@ 3100 SP 24'0" 19 3 1 314" x 9 1/2" VERSA -LAM) 3100 SP 18-0" 20 4 1 3/4" x 9 1/2" VERSA-LAMO 3100 SP 16' 0" 21 1 1 3/4" x 9 1/2" VERSA -LAM® 3100 SP 14-0" 22 1 13/4" x 9 1/2" VERSA -LAM@ 3100 SP 8'0" 23 9 1 3/4" x 9 112" VERSA -LAM) 3100 SP 4' 0" 24 BLK 9 112" AJSTm 20 MSR 25 TL 1 1/8" x 91/2" BC OSB RIM BOARDTM Level Accessory Schedule Mark Qty Manufacturer Product Description H1 4 Simpson Strong -Tie Inc. HGUS410 3-1/2 x 9-114 to 14 V -Lam Face Mount H2 5 Simpson Strong -Tie Inc. ITT39.5 2-1/2 x 9-112 Top Flange F3rn board and AJS Nail rim board and rjmjo'st w th 2W (ad) mats at 6" o.c. F13 -C Exterior End Wall Support N.T.S. REVISIONS: z w w p 2L=J w uJ w Lu 11 LU zQw= Lu m t— g0Z J F— Q Notes: Shop drawings, typical details and framing plans, outlining installation procedures and unit identlficatlon marks, shall be submitted for approval by the project architect and/or engineer. Exact quantities and lengths are . the responsibility of the contractor. Contractor is to verify all beams and joists At their exact locations. The floor system (1 -Joist, LVL) are designed for floor loads only. Roof loads from rafters, bracing, and beams must bear on exterior' walls and interior walls with bearing straight through to a footing. Any roof loads carried by the floor system must be so Indicated on the framing Plan submitted to us for take -off. Product to be stored, handled and Installed in accordance with manufacturer's recommendations. U (D 7 N a)(' L L) Q.y — 0 N @iY �� L N aNJ L N @ L T BC FRAMER® 2002 SCALE: 114" = 1'-0" DATE: 1/1312005 BY: be FILE: Mcphee Assoc Fahey.bcf DWG: SHEET: 1 / 2