HomeMy WebLinkAbout135 Crowell Road - Pump Changer DetailsUIJDERC•,ROUND CABLE
TO CONTROL PANEL—
U46d CAST EPON tAAljri0;:'r
COVET: � 1=C.AmE e Cy�C,_
u
RELEASE
uN1:-N
OiS,;C TYPE
GAT; VALVE
`-2"Q SIG ISO PSI MAIM
TO 'P" 6QX
�-� WEEP HOLE
LEVE~,. COWTROL Awo
COE.INEGTEOEJ BOX
�� FVC CHECK VALVE
-FILCA-HIGH WATER 1,LAR:v1
COI, TROL MERCURY EwTCH
SUBMERSIBLE F-JECT02
PUMP
PUMP C.HAt_rSE-R
AS MANUFACTURED BY SNORE`; PK :ASA 11v::, On APPROVED EQUAL
- 1JO SCALE -
PUMP CHAMBER NOTES AND SPECIFICATIONS
SURVEYOR'S CERTIFICATION: -
ON THE =C OF LOY KN3V,7 BDG"- iNFORMAr,ON AND BELIEF,
I CERl1rY 70: LEONARD DiCARLO
j%A7 AS A RZ"SULT C7 A LOCAi,CN S=CA PERiu^RMED ON
T7 -:E GROUYD ON SEPT 11, 1998 IN A.CCOR.".MICZ WF7H
THE NOAAL SV %W RO CF CA.S'E EXERC,Sr w E' r PROl <SSIONAL
LAND CURE.' RS A! Rk=CING iN THE COMWC_r'r'S .7N OF
UCfACHUSE7 TS, i F7KD -jM7 THE 0=w ✓7,"uLamc
IS S17VATED ON LOCUS AS DELINEATED HErlrv,v,
I -
a�
DATE:
�i � .r y + i � •. � ' � I ,< fi � / P . FESSIONAL LAAU SURVEYOR ,
4'PrXF,6-") 2C6.PVC
PVC F51P6 i I ISO PSI MAIN l ,
1 �• STEPS 80K E 200.00
/- �FtDAT f. I
PU41P 7.0 LOT 1
" 4 LDAT 2
6.8
MANHOLE ,Y.
Ifid 66.4
e
SEGTIOtJ A -Ar � � �
59.1 3
- 140 SCALE - DECK 0
Ju
AL
MOM
wn mlift
'O
J i
� I
67.8 ---! OQ:
U I
x'0.8 i
1
+I
0 i
n �
ff1
5. LEVEL CONTROLS
1 � N
E ERAL
For
Two switches shall be supplied to control the sump level and alarm
'shall
S R A '
the pump chamber the contractor shall furnish and install a
sional. Adjustable Level Control be used to control the
WEST YARMOUTH, MA
r �✓
pump "off" and "on" conditions.. The mercury float switch shall be
and motor, discharge piping and valves, mercury switch level
provided with a power source separate from the pump power source
r)
PREPARED BY
controls, high water alarm, a simplex control panel, and a precast
'chamber
and shall be for the alarm unit. This switch shall be mercury
; �E Rr' ^r,
ROBERT M. PERRY, P.E.
concrete pump as shown on details. All equipment shall be
tube switch or approved equivalent. The float level controls
J
50 LELAND RD.
installed in accordance with the manufacturer's specifications and
shall be set to operate at the elevations indicated on the plans. '
4 jrS SCN
recommendations and shall be warranteed for at least one year. The
LEWIS BAY
STEPS
PVC, PIPE
'
508-896-4861
The two inch diameter pipe leaving the p;;mp chamber shalt have a
The panel shall be for simplex or duplex pump control as required
CERTIFIED
�•
ALARM ON
ind shall Le provided with a manual -off -automatic switch and run
PLOT PLAN OF LAND
The pump chamber shall he a precast reinforced concrete structure
light for the pump.,
able to withstand an H-Zc loading. .Construction joints and
PUMP ON • �•
IN
openings shall be sealed with a hydraulic cement or otherwise made
The control panel shall be housed in a NEMA -1 control box for
WEST YARMOUTH, MA
water tight. ST-IToo-H2ces manufactured by Shorey Manufacturing
115V, single phase operation. The panel shall be installed in a
�,
Company or a
p y approved equivalent.) Access opening into pump chamber
ELF'✓,
PUMP OFF c LJ ;
LEONARD DICARLO
7. ALARM
3. PUMP AND MOTOR
The alarm unit shall be supplied with both audible and visual
«'« � SCALE: Iin. - soft. SEPTEMBER T.S. 1904
11
Pump and motor shall be a Zoeller wt,? submersible sewage punip
indicators with a separate power supply.from the pump., The alarm
4 SCHOFIELDBROTHERS OF'NEW ENGLAND. rx.
-sc,_r
or approved equal, with a 2 -inch aye and capable of passing
shall be mounted in a NEMA -1 enclosure separate from, but adjacent
A06`"T REGISTERED
2 inch solids. Pump motor shall be he-matically sealed,
submersible type, operating in high lity
to, the pump control panel.
PEWY
i � PROFE'SSIONALENGINEERS AND LAND SU,R'.^-YDnS
~ l
o 167 CRANBERRY HIGHWAY - P.O. BOX "01
a qu dielectric oil for
cooling the windings and for lubrication of the motor bearings.
RELEASE
uN1:-N
OiS,;C TYPE
GAT; VALVE
`-2"Q SIG ISO PSI MAIM
TO 'P" 6QX
�-� WEEP HOLE
LEVE~,. COWTROL Awo
COE.INEGTEOEJ BOX
�� FVC CHECK VALVE
-FILCA-HIGH WATER 1,LAR:v1
COI, TROL MERCURY EwTCH
SUBMERSIBLE F-JECT02
PUMP
PUMP C.HAt_rSE-R
AS MANUFACTURED BY SNORE`; PK :ASA 11v::, On APPROVED EQUAL
- 1JO SCALE -
PUMP CHAMBER NOTES AND SPECIFICATIONS
SURVEYOR'S CERTIFICATION: -
ON THE =C OF LOY KN3V,7 BDG"- iNFORMAr,ON AND BELIEF,
I CERl1rY 70: LEONARD DiCARLO
j%A7 AS A RZ"SULT C7 A LOCAi,CN S=CA PERiu^RMED ON
T7 -:E GROUYD ON SEPT 11, 1998 IN A.CCOR.".MICZ WF7H
THE NOAAL SV %W RO CF CA.S'E EXERC,Sr w E' r PROl <SSIONAL
LAND CURE.' RS A! Rk=CING iN THE COMWC_r'r'S .7N OF
UCfACHUSE7 TS, i F7KD -jM7 THE 0=w ✓7,"uLamc
IS S17VATED ON LOCUS AS DELINEATED HErlrv,v,
I -
a�
DATE:
�i � .r y + i � •. � ' � I ,< fi � / P . FESSIONAL LAAU SURVEYOR ,
4'PrXF,6-") 2C6.PVC
PVC F51P6 i I ISO PSI MAIN l ,
1 �• STEPS 80K E 200.00
/- �FtDAT f. I
PU41P 7.0 LOT 1
" 4 LDAT 2
6.8
MANHOLE ,Y.
Ifid 66.4
e
SEGTIOtJ A -Ar � � �
59.1 3
- 140 SCALE - DECK 0
Ju
AL
MOM
wn mlift
'O
J i
� I
67.8 ---! OQ:
U I
x'0.8 i
1
+I
0 i
n �
ff1
5. LEVEL CONTROLS
1 � N
E ERAL
For
Two switches shall be supplied to control the sump level and alarm
'shall
S R A '
the pump chamber the contractor shall furnish and install a
sional. Adjustable Level Control be used to control the
WEST YARMOUTH, MA
complete pumping system consisting of a submersible sewage pump
pump "off" and "on" conditions.. The mercury float switch shall be
and motor, discharge piping and valves, mercury switch level
provided with a power source separate from the pump power source
r)
PREPARED BY
controls, high water alarm, a simplex control panel, and a precast
'chamber
and shall be for the alarm unit. This switch shall be mercury
; �E Rr' ^r,
ROBERT M. PERRY, P.E.
concrete pump as shown on details. All equipment shall be
tube switch or approved equivalent. The float level controls
J
50 LELAND RD.
installed in accordance with the manufacturer's specifications and
shall be set to operate at the elevations indicated on the plans. '
SG %^ i L . !^J N. ?}<�!Y/�! <1'
recommendations and shall be warranteed for at least one year. The
LEWIS BAY
BREWSTER,MA 02631
contractor shall conduct one pumpinc operation test.
6. CONTROL PANEL
508-896-4861
The two inch diameter pipe leaving the p;;mp chamber shalt have a
The panel shall be for simplex or duplex pump control as required
CERTIFIED
2. PUMP CHAMBER
ind shall Le provided with a manual -off -automatic switch and run
PLOT PLAN OF LAND
The pump chamber shall he a precast reinforced concrete structure
light for the pump.,
able to withstand an H-Zc loading. .Construction joints and
IN
openings shall be sealed with a hydraulic cement or otherwise made
The control panel shall be housed in a NEMA -1 control box for
WEST YARMOUTH, MA
water tight. ST-IToo-H2ces manufactured by Shorey Manufacturing
115V, single phase operation. The panel shall be installed in a
PREPARED FOR
Company or a
p y approved equivalent.) Access opening into pump chamber
suitable location inside the building.AS
shall be a minimum of 24 inches. (�Fc �� s ��Cr.vcTE�
LEONARD DICARLO
7. ALARM
3. PUMP AND MOTOR
The alarm unit shall be supplied with both audible and visual
«'« � SCALE: Iin. - soft. SEPTEMBER T.S. 1904
11
Pump and motor shall be a Zoeller wt,? submersible sewage punip
indicators with a separate power supply.from the pump., The alarm
4 SCHOFIELDBROTHERS OF'NEW ENGLAND. rx.
-sc,_r
or approved equal, with a 2 -inch aye and capable of passing
shall be mounted in a NEMA -1 enclosure separate from, but adjacent
A06`"T REGISTERED
2 inch solids. Pump motor shall be he-matically sealed,
submersible type, operating in high lity
to, the pump control panel.
PEWY
i � PROFE'SSIONALENGINEERS AND LAND SU,R'.^-YDnS
~ l
o 167 CRANBERRY HIGHWAY - P.O. BOX "01
a qu dielectric oil for
cooling the windings and for lubrication of the motor bearings.
PRECAST TANK BUOYANCY EVALUATION
! ORLEANS, WA 02653
(508)255-2098
single phase motor shall have internal automatically resetting,
'
0-6673
thermal overload protection. Construction shall be of cast iron.
FLOOD PIAN SEPTICTANKSANDPUMPDITIO rr;.',�•fE t=RGUn�O !.%Fivr"t
DH
•
I
A 1 1 fasteners and external metal parts shall a l l b e 0 f stainless e S S
MB R LONE 31 YAINTHE
CHAMBER MUST TY. TITS IS NEGATIVE BUOYANCY FOR FLOOD CONDITIONS
WITI! TANKS EMPTY. TTETS IS ACC03?PLtSHF.D AS FOLLOWS: n s i'<_ 1aiF2 /
7� 7.
P P CHAMBER DETAILS
steel. The pump motor shall be fully submersible and shalt
LV,
operate at 1,750 RPM, with a 115 volt single phase AC
+ 9 P power
� SF.PTTC TANKS: PROVIDE SlfOREY PRECAST ST -2000-H-20 (OR EQUAL) '—'--
Ii'QR
source. (NOTE: Electrical contractor to verify available Voltage
W/10INCHES OFPOURED CONCRETFSET UNIFORA[LYOVER LTSINTERIOR f p `�
at the -pump. control panel.) Pump shall be rated as follows: 0.5
horsepower; --gallons
BOTT0II. TANK %Vr.-25,0801.R., TANK DISPLACEMENT-31,0581,R.INSE.4•.
r rT{
ISPCJAL SYSTLi111
SEWAGE DISPOSAL
-.
-15 per minute; 12- feet Total Head.
B'E'ATER. THE DIFFERENCE, OR "BUOYANT FORCE" OF5978LB.IS COUNTERED
PREPARED FOR
-
RY TIIE 41.6 C.F. OF CONCRETE r 1501,13./CF= 6250I.B. THE 10^ LAYER OF
4. PIPING -
CONCRETE ALLOWS FOR LiQUID DFPTIE GREATER TIIAN 4 FT. IN THE,
LEONARDI]ICARLO
Pump chamber discharge "pipings and fittings, and sewage force main
TANKS. RESULTING TALAR CAPAClTI'1S APPROX. 1690 GAL
AT
i
Shall be 2 inch schedule 40 PVC - class 150 pressure tested. The
discharge line shall 4-1-4 2 1 h nit
';PU6tPCITASIRFR:PRO%TDESHOREYPRECASTST-1500-E1-20(OREQ[AL)Iv/ (�; :,fes S ,n ��rpacl
/
112 CROIITVT�L O D
e a n c L Swing type check valve
formounting in the vertical 2 inch
E INCHES OF POURED CONCRETE SET UNIFORMLY OYER FPS iNTF.RIOR
S R A '
position, a PVC disk -type gate
BOTTONLTANK WT. =21,236LB.. TANK DISPLACEMENT -26.144LD. INSEA,
WEST YARMOUTH, MA
valve, and a quick release Union .
WATER TUE Bl'ON'ANT FORCF. OF 4914 LB. IS COUtiTERED BY TTIE S^
-
-LAYER OF CONCRETE. LIQI'M D£PrFTIS ADFQL'ATE TO PRO"vTDE A
r)
PREPARED BY
Force main shall be laid in a "Class 8" trench beddingand shall
SUITABLE PUMP DRAW -DOWN LEVEL. THE RESULTINGTAIKCAPACFFS'
; �E Rr' ^r,
ROBERT M. PERRY, P.E.
have a minimum cover o f 2 f t . The ter ` i n u s n f the force main
IS APPROX. FNT. GALLONS, EXC£F.DiNG THE 24 HOUR FIAAY CAPACITY
50 LELAND RD.
discharge to the distribution box. The inlet shall be
REQUIRE.\SFNT.
SG %^ i L . !^J N. ?}<�!Y/�! <1'
fitted
fitted with an inlet tee shown on Sheet 1.
i-iiyr<_[3,9k�n.-�,� ,�-�,�,< i -E
BREWSTER,MA 02631
508-896-4861
The two inch diameter pipe leaving the p;;mp chamber shalt have a
1/8" weep hole'.
'r0 ,v