HomeMy WebLinkAbout42 Crowes Purchase Road - Sewage Disposal System Design Upgrade DetailsCHAMBER INSTALLATION NOTES 1. EXCAVATE AND ' LEVEL INSTALLATION AREAS. 2. SMOOTH IRREGULARITIES IN THE EXCAVATION. A LEVEL, FLAT SURFACE IS REQUIRED. 3. INSTALL ARC LEACHING CHAMBERS IN ADJACENT ROWS TO COVER DESIRED AREA. 4. INSTALL UNIVERSAL END CAP AND SECURE IN PLACE WITH BACKFILL 5. INSTALL 4" PIPE TO EACH ROW OF ARC CHAMBER USING KNOCKOUTS PROVIDED IN THE UNIVERSAL END CAPS. 6. ENDS OF ROWS MAY BE CONNECTED WITH PIPING TO IMPROVE DISTRIBUTION. 7. FILL PERIMETER AND INTERIOR SIDEWALL AREAS TO TOP OF .CHAMBERS'AND WALK INTO PLACE. AVOID LARGE ROCKS OR DEBRIS IN COVER MATERIAL 8. COVER ARCLEACHING CHAMBERS TO A MINIMUM OF 12 OF GRANULAR COVER AFTER CONSOLIDATION FOR - H-10 APPLICATIONS. AVOID LARGE ROCKS OR DEBRIS IN COVER` MATERIAL. COVER HEIGHTS AND LIVE LOADING LIMITS ARE IMPACTED BY BOTH SOIL TYPE AND COMPACTION'EQUIREMENTS. CONTACT ADS WHEN POOR SOILS ARE ENCOUNTERED AND FOR MAXIMUM FILL HEIGHTS. LIVE LOAD CONDITIONS ARE NOT RECOMMENDED. ; OBSERVATION PORT NOT TO SCALE INSPECTION FRAME NEENAH R-1978 OR APPROVED EQUAL THREADED CAP FINISH GRADE 0 4- PERF. SCHD. 40 PVC 0 0� REVISIONS NO. DATE DESCRIPTION GENERAL` NOTES: 1. THIS PLAN IN ONLY INTENDED FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO 310 CMR' 15.000 AND YARMOUTH BOARD OF HEALTH REGULATIONS. 3. THERE ARE NO KNOWN OR PROPOSED PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY. `. 4..IF.AN OVERDIG IS SPECIFIED, REMOVE ALL TOPSOIL: SUBSOIL AND OTHER UNSUITABLE MATERIALS. 5. IF AN OVERDIG IS SPECIFIED, REPLACE ' ALL EXCAVATED MATERIALS WITHIN THE ..,,LIMIT OF EXCAVATION WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETRIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2 INCHES. A SIEVE ANALYSIS USING A #4 SIEVE SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL ` UP TO 45% BY WEIGHT MAY BE RETAINED ON THE #4 SIEVE. SUCH ANALYSES MUST. DEMONSTRATE THAT THE MATERIAL MEETS EACH OF. THE FOLLOWING SPECIFICATIONS: 100% MUST PASS #4 SIEVE 10% MUST PASS #50 SIEVE 0-20% MUST PASS #100 SIEVE 0-5Y MUST PASS #200 SIEVE 6. EXISTING UTILITIES WHERE SHOWN ON THE PLANS ARE APPROXIMATE. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY - OR THAT ALL SUBSURFACE STRUCTURES ARE SHOWN. CONTRACTOR SHALL VERIFY THE SIZE, LOCATION AND ELEVATION OF INVERTS OF UTILITIES AND STRUCTURES, 1MTHIN THE LIMIT OF WORK, PRIOR TO THE START OF CONSTRUCTION.` IF ANY DISCREPANCIES ARE DISCOVERED OR FIELD CHANGES REQUIRED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY COORDINATING THE PROPOSED CONSTRUCTION ACTIVITIES WITH OIG -SAFE AND THE APPLICABLE UTILITY COMPANIES, AND SHALL COMPLETE THE PROPOSED WORK WITHOUT ANY INTERUPTIONS IN SERVICE. 8. CONTRACTOR IS REQUIRED TO NOTIFY DIG—SAFE, PER MASS. STATUTE CHAPTER 82, SECTION 40 (1-888-344-7233) A MINIMUM OF 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 9. THIS SYSTEM IS NOT DESIGNED FOR THE ,,USE OF A GARBAGE GRINDER., THE OWNER IS REQUIRED TO REMOVE THE EXISTING GARBAGE GRINDER PRIOR TO THE START OF CONSTRUCTION. BSC G No V P 349 Route 28, Unit D W. Yarmouth, Massachusetts 02673 508 778 8919 2011 BSC Group, Inc. PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM UPGRADE' #42 CROWES PURCHASE' WEST YARMOUTH MASSACHUSETTS PREPARED FOR: RALPH BUONOPANE 443 OAK STREET'; WESTWOOD, MA 02090-3222 (781) 762-3078 RBUO@COMCAST.NET DATE: FEBRUARY 18, 2011 COMP. DESIGNS B. YERGATIAN CHECK: C. FIELD DRAWN: K. HEALY FIELD: P. HAGIST FILE NO. 49559-SEP.DWG DWG NO. 6040-02 8HEET 2 OF '2 JOB NO. 4-9559.00