Loading...
HomeMy WebLinkAboutEngineered Plan - 2008LOCATION MAP ASSESSORS MAP: PARCEL: �.... r FLOOD ZONE_:..... A./��r REFERENCE: __.._ ......... _..�.._ ti TEST HOLE LOGS SOI L EVALUATOR'. WITNESS: wi-` \Xw-u-f Z� DATE: J-0 L-Lif 11 PERCOLATION RA"I•E : -G Z Uel Ito • I j TH-I TH-2 1 cn, 000 wry- . 0 EPTIC SYSTEM DESIGN FLOW ESTIMATE BEDROOMS AT GAL/DAY/BEDROOM -3,DGAL/DAY SEPTIC TANK 350 GAL/DAY x 2 DAYS - %6t)GAL USE 1'} GALLON SEPTIC TANK SOIL:=*'BSORPT I ON SYSTEM NOTES: ''SIDE AREA: Z�C. �l -r t � 'rC 3�, tm( . log,s�. BOTTOM AREA: 2 Y. A , SEPTIC SYSTEM SECTION DATE GAL SEPTIC TANK HEALTH AGENT 1) The installation shall comply with Title V and Town of Yarmouth Board of Health Regulations. 2) The installer shall verify the location of utilities, sewer inverts and septic components prior to installation and setting base elevations. 3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The first two feet out of the d -box to the leaching shall be level. 4) This plan is not to be utilized for property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. 6) Parking shall not be constructed over H10 septic components. 7) The property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based on the plan shall be deemed approval of the design flow by the owner. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from waterline. Sewer lines crossing the water line shall be sleeved with 4 inch SCH 40 PVC with ends grouted if applicable. The proposed SAS is being installed below the water service line, The line is to be sleeved as aforementioned and maintained in place. 11) If a garbage grinder exists it is to be removed and is the responsibility of the owner to ensure such. 12) The installer is to take caution in excavation around the gas line. 13) The installer shall verify the location, quantity and elevation of the sewer ; lines exiting the dwelling prior to the installation. 14) Excavate 5 feet around the SAS and below to a depth of approx. 62" (to Med. Sand ) and fill with clean sand per Title V specs. Excavation depth may vary. 15) Lot as depicted by Thomas Kelley, RLS indicates lot as two lots in common ownership creating one lot. If such is to the contrary the property owner is to notify this office for system relocation. Payment for plan indicates approval with lot interpretation. t�W'*, DAVID c SITE AND SEWAGE PLAN LOCATION : 4 X53 h 41,kicS1' // �f PREPARED FOR: DSIC —!-)e-Pe SCALE,� DAV I D B. MASON,Rt; DATE: DBC ENVIRONMENTAL DESIGNS EAST SANDWICH. MA (508) 833-2177 EE9LE0WFI 10 JUL 1 5 2008