Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
39 Dana's Path - Floor & Foundation Plan 2
im EXISTING FOUNDATION PLAN Scale: 1/8"=1'D" 60'-0" EXISTING FIRST FLOOR PLAN suspended cieling —j 1/2" sheet rock r-. i2x4 24" OC — 31/2" kraft face fiberglacs insul m UGL ®Drylock Masonry Waterproofer, two coats 2x4 pres. treated Shoe – P19 fiber glass in5ul. 2x10 floor conotuction existing 2x6 prey. treated sill W/ sill seal existing 8" concrete foundation concrete floor existing footing WALL DETAIL A 2 Scale: 1/2"=1'O" Existing base board heat output........ 39,000 BTU New conotuction heat output ............ 14,4O0 BTU ---------------------------------------------------------- 53,400 BTU Max required .....................................66,750 BTU Existing Boiler....................................100,000 BTU Caotano ConStructlon Co. Alterations for John and Debby Kreuorh 39 Dana's f ath West Yarmouth, MA 5calc:1/4"=1'0" Date: 3/19/02 J suspended cieling —j 1/2" sheet rock r-. i2x4 24" OC — 31/2" kraft face fiberglacs insul m UGL ®Drylock Masonry Waterproofer, two coats 2x4 pres. treated Shoe – P19 fiber glass in5ul. 2x10 floor conotuction existing 2x6 prey. treated sill W/ sill seal existing 8" concrete foundation concrete floor existing footing WALL DETAIL A 2 Scale: 1/2"=1'O" Existing base board heat output........ 39,000 BTU New conotuction heat output ............ 14,4O0 BTU ---------------------------------------------------------- 53,400 BTU Max required .....................................66,750 BTU Existing Boiler....................................100,000 BTU Caotano ConStructlon Co. Alterations for John and Debby Kreuorh 39 Dana's f ath West Yarmouth, MA 5calc:1/4"=1'0" Date: 3/19/02