HomeMy WebLinkAbout2014 Mar 27 - Email from Engineering Works i -
! .
vonHone, Amy
° From: PETER MCENTEE <peter.mcentee@gmail.com>
Sent: . Thursday, March 27, 2014 9:25 AM
To; vonHone, Amy
Subject: 34 Sioux Rd
Attachments: 34 SIOUX RD CRAWL.jpg
�y,
I have designed a septic system for the above referenced site. The site lies just within the Zone A line of
Mashpee MIW=29 well. The adjustment is 1.7' (EL=97.6).
Our observed GW was EL=95.9. The crawl space floor is at EL=96.7 and it doesn't appear that the GW rises
extensively above the floor elevation but may, if fact,rise to, or slightly above the floor elevation(see attached
photo). I have held the full 1.7' adjustment and will be requesting a 1' reduction in separation to the adjusted
GW elevation. A 4 bedroom Deed Restriction will be filed.
Please let me know if you have any concerns or comments.
Peter
Peter T. McEntee PE- Principal
Engineering Works, Inc.
12 West Crossfield Road
Forestdale, MA 02644
Tel/f� (508)477-5313
1
i
�