Loading...
HomeMy WebLinkAbout2014 Mar 27 - Email from Engineering Works i - ! . vonHone, Amy ° From: PETER MCENTEE <peter.mcentee@gmail.com> Sent: . Thursday, March 27, 2014 9:25 AM To; vonHone, Amy Subject: 34 Sioux Rd Attachments: 34 SIOUX RD CRAWL.jpg �y, I have designed a septic system for the above referenced site. The site lies just within the Zone A line of Mashpee MIW=29 well. The adjustment is 1.7' (EL=97.6). Our observed GW was EL=95.9. The crawl space floor is at EL=96.7 and it doesn't appear that the GW rises extensively above the floor elevation but may, if fact,rise to, or slightly above the floor elevation(see attached photo). I have held the full 1.7' adjustment and will be requesting a 1' reduction in separation to the adjusted GW elevation. A 4 bedroom Deed Restriction will be filed. Please let me know if you have any concerns or comments. Peter Peter T. McEntee PE- Principal Engineering Works, Inc. 12 West Crossfield Road Forestdale, MA 02644 Tel/f� (508)477-5313 1 i �