Loading...
HomeMy WebLinkAbout12 Doves Wing Road Proposed Septic DesignTOP OF FOUNDATION ELEV. - 38.90 --% .L. ELEV. = LEGEND: 24' MANHOLE COVER 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4 PER FT. ELEV. = 32.25 20 FT:. MINIMUM"FROth CELLAR OR CRAWL SPACE r t✓w+: ` 10 FT. MINIMUM FROM SLAB SINGULAIR®' 2" PRESSURE PIPE TREATMENT PLANT 150 PSI MINIMUM - MODEL 960 ON 24 COVERS', / 2" SCHEDULE 40 PVC PIPE MIN. PITCH 1/8" PER FT.1/2" HOLES ®5' O.C. ALTERNATING AT 2 AND 10 O'CLOCK 1\ 38.41 MAX. L 3/8" DRILL .LE V. _ •-^"::,, (� HOLE ELEV. 1L35_ - o CHECK CLEAN SAND LOAM AND SEED 2" LAYER OF CLEAN-OUT AND 1/8' TO 1/2' OBSERVATION TO .� WASHED STONE GRADE OR FILTER FABRIC 34.16 MIN. f REQUIRED c ELEV. __3120_ ° ° o❑❑❑❑❑❑❑❑❑❑ 40 Mt_ o ° ° 00000000000 ° 2' ° VINYL °° ° UNER ELEV. _ ° ° ° ❑0013❑❑❑❑❑❑❑ ° _12515_ ° ° ° ° ELEV. e _30.88 2 5GO GALLON GALLEYS WITH STONE IN AN zELEV. 13' X 25' X 2' TRENCH FORMATION 2 18,3B WELL A1W 230 (TO BE PLACED ON FIRM BASE) VALVE SOIL ABSORPTION ZONE C 3/4" TO i 1/2' CLEAN � INDEX 23.3 DOUBLE WASHED STONE ADJUST 2-0 SINGULAIR TREATMENT FREE OF FINES & SILT SYSTEM SAS PLANT PUMP SAMPLE CATCH AND CHAMBER RECIRCULATING PUMP ELEV. AT INVERT INLET ELEV. AT ALARM ON SEWAGE DISPOSAL S1 STEM PROFILE ELEV. AT PUMP '" ELEV. AT PUMP OFF _2253_ NOT TO SCALE BOTTOM OF INSIDE PUMP CHAMBER-27,QQ_ BCTTOM OF OUTSIDE PUMP CHAMBER _2dJ3_ USGS PROBABLE WATER TABLE ELEV. _ _12.39_ OBSERVED WATER TABLE (9/13/05) ELEV. = 9.50 _ TEST HOLE 2, .OT 9 BOTTOM OF TEST HOLE ELEV. = _IUQ- PUMP CHAMBER CALCULATIONS: REQUIRED FLOW PER CYCLE .25 X 330 82!_0 GAL./CYCLE VOLUME PER CYCLE 8250 GAL/CYCLE /7.48 GAL./CU. FT. - 11,0- CU. ET./CYC%E VOLUME OF WATER IN FEED 3.14 X 0.00694 X 38 - FT. _ _51.5.}_ CU. FT. TOTAL VOLUME OF WATER RETURNED ___QJ0_ CU. FT. TOTAL MINIMUM VOLUME PER CYCLE -lJJM- CU. FT. DISCHARGE 11.88 CU.FT. /34.6.' CU.Fn/FT. = _004_ FT. (1000 G.S.T.) STORAGE CAPACITY (_,lM_GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.) _ _ 1.27 ''T. _7.22_ REQUIRED _2.59_ PROVDED ~�32.8 / v oc I a io t R �}OAD 6 F 4.2 i3.5 1\k5o vJ �36.f ®33.7 .3 • 33.5 LOT 20 3, 3.0 17158 f SF 3 Cts 7 tt ,\ ru J 33.5 - �4.3 t. -(3J� 33.2 4. O int � 4.1tl 33.8 1 v >, 32.0 1 0CD c 3 34.9 m 1 31.5 c 1 ' �. ui \ ) 3 f -'-34.4 w 3u.2 W284� 1 � DRIVE _ . %tp-TEST :� � w w SiNGU'.AIR 9s1ZDN �REAT,,tLNT PLANt AM�PLEO SOIL�.4 i Liu�i _ vcg CATEST 1 �\�,\ 1 1 f 5. 35.5 rn I h' �� 1 1.T `2F';66, Ali1. PUMP ) '4/ / ' _-CFFAM5tR 9.8 / 0 y. 1 35 35.7 / f :)336.4 / 9612 J ;YG COAD -_ j �-- �ooErs�kN( EXISTING SPOT ELEVATION GO EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00. FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE -0- TOWN WATER -W W CATCH BASIN t® j GAS LINE CLEANOUT CESSPOOL C.P.0 CL a,. T SOIL TEST DATE OF $OIL TESTECEMBER 5 2007 SOIL TEST DONE BY WE SER I D RI JG WITNESSED BY A. YON HONE OBSERVATION HOLE 1 ELEV.= 30.2 OBSERVATION HOLE 2 ELEV.__ 30.6_ PERCOLATION RATE <_2 _ MIN./INCH AT 52 INCHES DEPTH HORI ZI TEXTURE COLOR MOTT- OTHER 0-7 A LOAMY SAND 10YR5/2 NO �/DAY 7-21 B LOAMY SAND 10YR6/6 SOIL CLASSIFICATION _ I 21-90 Cl MEDIUM SAND 2.5YB/2 LEACHING AREA 477,00 SQ. FT. 0-108 C2 SILT LOAM A285 GAL./DAY 477.00 X 0.74 108-13 C3 MEDIUM SAND 2.5Y8/2 NO WATER ENCOUNTERED AT _ 132" ELEV. = -J3.2 DEPTH I HORIZ I TEXTURE COLOR MOTT. I OTHER 0-6 A LOAMY SAND 10YR5/2 NO �/DAY 6-19 8 LOAMY SAND 10YR6/8 SOIL CLASSIFICATION _ I 19-90 Cl MEDIUM SAND 2.5Y7/4 LEACHING AREA 477,00 SQ. FT. 0-114 C2 SILT LOAM A285 GAL./DAY 477.00 X 0.74 114-161 C3 MEDIUM SAND 2.5Y7/4 NO WATER ENCOUNTERED AT _ IRR'_ ELEV. - DESIGN CALCULATIONS NUMBER OF BEDROOMS 3 GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW E GAL/13R./DAY EFBC/D �) �/DAY REQUIRED TINK CAPACITY -5- GAL ACTUAL SIZE OF SEPTIC TANK 1500_ GAL. SOIL CLASSIFICATION _ I DESIGN PERCOLATION RATE < 5_ MIN.AN. EFFLUENT LOADING RATE QZ4- GAL./DAY/S.r. LEACHING AREA 477,00 SQ. FT. 13X25 + (38=2) LEACHING CAPACITY (AREA X RATE) A285 GAL./DAY 477.00 X 0.74 RESERVE LEACHING CAPACITY =10. GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE, 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WIYHSTANDING H-20 LOADING, 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR__ _ IS TO CA=DIG=SAFE" AT 1=888-344-7233 AT LEAST 72 HOUR§ PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP 192_ AS PARCEL _3_ 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. 11. ALARM IS TO BE BOTH AUDIO AND VISUAL. 12. SEPTIC TANK AND PUMP CHAMBER ARE TO BE TESTED TO INSURE THAT THERE IS NO INFILTRATION OF GROUNDWATER INTO FACILITIES. 13 All UNSIIITAALE MATERIA' SNAU BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). 14. VARIANCE IS REQUIRED FOR FOUNDATION TO BE LEVEL WITH HIGH POINT. 15. THE SEPTIC TANKS AND PUMP CHAMBER ARE TO BE SET ON A FIRM BASE OR 3/4" TO 1 1/2" STONE 6" THICK. 16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE FOLLOWING MINIMUM INSPECTIONS: 1. STAKE OUT SYSTEM. 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. 3. IF BUILDING DEBRIS DR STUMPS ARE ENCOUNTERED DURING EXCAVATION, 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. 5. INSTALLATION OF ALL PIPING. 6. COMPLETION OF SEPTIC SYSTEM, PRIOR TO BACKFILL 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A SUITABLE DISPOSAL SITE. 18. PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY & 14.5' HEAD) OR EQUAL. Y8Mwuth He81th Department SbLo_hAl APPROVED APPROVED: BOARD OF HEALTH �q AGENT 11 LOCUS ? z z /v � c�F�r STF i R° U� 6 PROPOSED SEPTIC DESIGN FOR DUBLIN CONSTRUCTION, INC. PROJECT LOCATION LOT20 j DOVE'S WING ROAD, YARMOUTH 5 MR MG�GEwRN 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 DATE DEC. 11, 2007 ALE 1 " = 20' 17 REV. MAR. 12, 2008 JOB "D• 6250--00 [EL LOCATION MAP REv JUNE 9, 2008 SHEET 1 • GE 1 j 11