HomeMy WebLinkAbout12 Doves Wing Road Proposed Septic Design 2S
W
20 FT. MINIMUM FROM CELLAR MANHOLE
10 FT, MINIMUM FROM SLAB OR CRAWL SPACE COVERS
` TOP OF FOUNDATION 2" SCHEDULE 40 PVC PIPE
ELEV.. _38.9 10 FT. MINIMUM =,E
v 2" PRESSURE PIPE
ADVAN'IEX MANHOLE 150 PSI MINIMUMEc
MODEL AX -20 covERs 32.25
'
CAP &
CLEAN SAND INSPECTION VALVE
PORT �/a LAYEOF R
COVERSE
35.25 MAX. 33.00 MIN. WASHED STONE
REQUIRED
. _IZz39-
ELEV. - 31.17 40ML
30.67 VINYL
\7ELEV.
a 29.30_
WELL A1W 230
5 18.36 ZONE C
n INDEX 23.3
ADJUST 28
„
3.00 4" CAST IRON PIPE
1500
COLOR
MOTT. OTHER
MANIFOLD VALVE
° ° ° °
G o o
LOAMY SAND
(OR EQUAL MINIMUM
!
7-21
EL
¢
gs U ry
t0YR6/6
n I
PUMP
PITCH 1/4 PER FT. G j1 11 "
USGS PROBABLE WATER TABLE ELEV. n 1230_
2.5Y8/2
4_Z'�18 SQ. FT.
o o o e e o
C2
SILT LOAM
I 9 i ', Ila iUi:
475.18 X 0.74
OBSERVED WATER TABLE (9/13/05) ELEV. - 9-50 TEST HOLE 2, LOT 9
.
(TO BE SET ON A FIRM BASE)
2.5Y8/2
BOTTOM OF TEST HOLE ELEV. - 16.64_
2000 GALLON
ELEV. AT INVERT INLET
2" HOLE
PUMP CHAMBER CALCULATIONS:
SEPTIC TANK
ELEV. a. _,�
LOCATION MAPREvsE°�
ELEV.
14 STANDARD INFILTRATORS WITH
-'41'46-
VOLUME PER CYCLE _Q.- GAL/CYCLE /7.48 GAL./CU. FT. �i,S'i� CU. FT./CYCLE
SEWAGE DISPOSAL STEM PROFILE
BIOTUBE
3/8" DRILL-''il`1L
HOLE 3j4' TO 1 tj2" CLEAN
STONE IN A
NOT TO SCALE
BOTTOM OF INSIDE PUMP CHAMBER
BOTTOM OF OUTSIDE PUMP CHAMBER
-2$g4-
VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X IS '5- FT. m _0.2CU. FT.
i'n
DOUBLE WASHED STONE
10.33'X46 X 6 FIELD FORMATION
TOTAL VOLUME OF WATER RETURNED IM- CU. FT.
°
FLOW UNE
PUMP
TOTAL MINIMUM VOLUME PER CYCLE 12.2.4.. CU. FT.
FREE OF FINES & SILT
F
N;
ELEV.
PACKAGE 0Q
CHECK
SOIL ABSORPTION
STORAGE CAPACITY (-'�y30_GAL/DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.) _ J.27 FT.
-PIN.
_1.27 REQUIRED _'I - PROVIDED
SYSTEM (SAS)
REQUIRED
. _IZz39-
ELEV. - 31.17 40ML
30.67 VINYL
\7ELEV.
a 29.30_
WELL A1W 230
5 18.36 ZONE C
n INDEX 23.3
ADJUST 28
I
I
2'
Fi
LEGEND:
EXISTING SPOT ELEVATION 00,0 1
EXISTING CONTOUR ----00----
FINAL SPOT ELEVATION 0.
FINAL CONTOUR
SOIL TEST LOCATION
UTILITY POLE -0-
TOWN WATER -WSW-
CATCH ;BASIN
3 - 3/8" DRAINAGE HOLES PER LATERAL
0 BEGINNING, MIDDLE & END (6 TOTAL)
3" PVCMANIFOLD
DISTRIBUTION LATERALS
AT 52" D.C. SIDE VIEW
1-1/2" LATERAL LINE
3/8" HOLES 0 5' O.C.
ALTERNATE SIDES
(O 11 AND 1 O'CLOCK;
SOIL TEST BILE C01
DATE OF SOIL TEST DECEMB U5y 2007-
SOIL TEST DONE BY 506..SER EN21NEU ING
WITNESSED BY -A�YQN-d0f-
OBSERVATION HOLE 1 ELEV.- 30.2 1 OBSERVATION HOLE 2 ELEV.- 30.6
PERCOLATION RATE L$__ MIN./INCH AT _52 - INCHES
DEPTH
HORIZ I
1500
COLOR
MOTT. OTHER
0-7
A
LOAMY SAND
10YR5/2
!
7-21
EL
¢
G AL.
t0YR6/6
n I
PUMP
C1
USGS PROBABLE WATER TABLE ELEV. n 1230_
2.5Y8/2
4_Z'�18 SQ. FT.
AE
C2
SILT LOAM
CHAMBER
475.18 X 0.74
OBSERVED WATER TABLE (9/13/05) ELEV. - 9-50 TEST HOLE 2, LOT 9
.
(TO BE SET ON A FIRM BASE)
2.5Y8/2
BOTTOM OF TEST HOLE ELEV. - 16.64_
2000 GALLON
ELEV. AT INVERT INLET
.33.84
PUMP CHAMBER CALCULATIONS:
SEPTIC TANK
ELEV. AT ALARM ON
REQUIRED Fl OW PER CYCLE 25 X ?�_ !S2 50 GAL,/CYCLE
LOCATION MAPREvsE°�
iC
ELEV. AT PUMP ON
-'41'46-
VOLUME PER CYCLE _Q.- GAL/CYCLE /7.48 GAL./CU. FT. �i,S'i� CU. FT./CYCLE
SEWAGE DISPOSAL STEM PROFILE
ELEV. AT PUMP OFF
VOLUME OF WATER IN FEED 3.14 X 0.00694 X 4_ FT. _ A.0- CU. FT.
NOT TO SCALE
BOTTOM OF INSIDE PUMP CHAMBER
BOTTOM OF OUTSIDE PUMP CHAMBER
-2$g4-
VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X IS '5- FT. m _0.2CU. FT.
_28.95-
TOTAL VOLUME OF WATER RETURNED IM- CU. FT.
TOTAL MINIMUM VOLUME PER CYCLE 12.2.4.. CU. FT.
DISCHARGE .12.14 CU.FT. /34.67 CU.FT./FT.Q.Sr4' � __ FT. (1000 G.S.T.
STORAGE CAPACITY (-'�y30_GAL/DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.) _ J.27 FT.
_1.27 REQUIRED _'I - PROVIDED
I
I
2'
Fi
LEGEND:
EXISTING SPOT ELEVATION 00,0 1
EXISTING CONTOUR ----00----
FINAL SPOT ELEVATION 0.
FINAL CONTOUR
SOIL TEST LOCATION
UTILITY POLE -0-
TOWN WATER -WSW-
CATCH ;BASIN
3 - 3/8" DRAINAGE HOLES PER LATERAL
0 BEGINNING, MIDDLE & END (6 TOTAL)
3" PVCMANIFOLD
DISTRIBUTION LATERALS
AT 52" D.C. SIDE VIEW
1-1/2" LATERAL LINE
3/8" HOLES 0 5' O.C.
ALTERNATE SIDES
(O 11 AND 1 O'CLOCK;
SOIL TEST BILE C01
DATE OF SOIL TEST DECEMB U5y 2007-
SOIL TEST DONE BY 506..SER EN21NEU ING
WITNESSED BY -A�YQN-d0f-
OBSERVATION HOLE 1 ELEV.- 30.2 1 OBSERVATION HOLE 2 ELEV.- 30.6
PERCOLATION RATE L$__ MIN./INCH AT _52 - INCHES
DEPTH
HORIZ I
TEXTURE
COLOR
MOTT. OTHER
0-7
A
LOAMY SAND
10YR5/2
NO
7-21
B
LOAMY SAND
t0YR6/6
n I
21-90
C1
MEDIUM SAND
2.5Y8/2
4_Z'�18 SQ. FT.
0-108
C2
SILT LOAM
3=.03 GAL/DAY
475.18 X 0.74
108-132
C3
MEDIUM SAND
2.5Y8/2
NO WATER ENCOUNTERED AT _137' ELEV, a 19 2
END VIEW
PRESSURE PIPE
OM PUMP CHAMBER
HORIZ I
TEXTURE
COLOR
MOTT. OTHER
0-6
A
LOAMY SAND
10YR5/2
NO
8-19
B
LOAMY SAND
10YR6/8
n I
19-90
'o.
o
2.5Y7/4
4_Z'�18 SQ. FT.
90-114
C2
SILT LOAM
3=.03 GAL/DAY
475.18 X 0.74
114-168
C3
MEDIUM SAND
5.0•
5.0'
JOB NO. 6250-00
REVISED I
TOP VIEW
JI[
DEPTH
HORIZ I
TEXTURE
COLOR
MOTT. OTHER
0-6
A
LOAMY SAND
10YR5/2
NO
8-19
B
LOAMY SAND
10YR6/8
DESIGN PERCOLATION RATE
19-90
C1
MEDIUM SAND
2.5Y7/4
4_Z'�18 SQ. FT.
90-114
C2
SILT LOAM
3=.03 GAL/DAY
475.18 X 0.74
114-168
C3
MEDIUM SAND
2,5Y7/4
NO WATER ENCOUNTERED AT _168-_ ELEV. - .16 6 -
DESIGN
_
DESIGN CALCULATIONS
NUMBER OF BEDROOMS
3
GARBAGE DISPOSAL UNIT
lr cu Z
z
z
ly �
QF9r O235
s�
6
TOTAL ESTIMATED FLOW
PROPOSED SEPTIC DESIGN
FOR
DUBLIN CONSTRUCTION, INC.
( 110 GAL/SR./DAY X.,i'. BR.)
--230- GAL./DAY
REQUIRED SEPTIC TANK CAPACITY
-MO GAL
ACTUAL SIZE OF SEPTIC TANK
2.M GAL
SOIL CLASSIFICATION
_I_
DESIGN PERCOLATION RATE
Ste_ MIN./IN.
EFFLUENT LOADING RATE
A.7-4 GAL/DAY/S.1
LEACHING AREA
4_Z'�18 SQ. FT.
10.33 X 46
LEACHING CAPACITY (AREA X RATE)
3=.03 GAL/DAY
475.18 X 0.74
DATE DEC. 11, 2007
RESERVE LEACHING CAPACITY
MUL GAL/DAY
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
TITLE 5 AND THE TOWNS RULES AND REGULATIONS FOR
THE SUBSURFACE DISPOSAL OF SEWAGE.
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
FINISHED GRADE.
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF
WIYHSTANOING H-20 LOADING.
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
BE MORTARED IN PLACE.
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
IS TO CALL D1G-SAFE AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE..
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION i
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
IMMEDIATELY. I
8. PARCEL IS IN FLOOD ZONE C
9. LOT IS SHOWN ON ASSESSORS MAP --E*_ AS PARCEL --- 1L_.
10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS.
11. ALARM IS TO BE BOTH AUDIO AND VISUAL,
12. SEPTIC TANK AND PUMP CHAMBER ARE TO BE TESTED TO INSURE
THAT THERE tS NO INFILTRATION OF GROUNDWATER INTO FACILITIES.
13. ALL UNSUITABLE. MATERIAL- SHALL. BE REMOVED FROM UNDER AND
FOR A MINIMUM OF 5' AROUND 'SOIL ABSORPTION SYSTEM AND BE
REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3).
14. VARIANCE IS REQUIRED FOR FOUNDATION TO BE LEVEL WITH HIGH POINT.
15. THE SEPTIC TANKS AND PUMP CHAMBER ARE
TO BE SET ON A FIRM BASE OR 3/4" TO 1 1/2- STONE 6" THICK.
16, THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE
FOLLOWING MINIMUM INSPECTIONS:
1. STAKE OUT SYSTEM.
2. PRIOR TO AND DURING THE SETTING OF THE TANKS,
3. IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION.
4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT.
5. INSTALLATION OF ALL PIPING,
6. COMPLETION OF SEPTIC SYSTEM, PRIOR TO BACKFILL.
17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A
SUITABLE DISPOSAL SITE.
18. PUMP IS TO BE A MEYERS SRM 4 4/16 HP (W/31 GPM CAPACITY
do 14.5• HEAD) OR EQUAL
vlci - ice . ✓ /W
Yarmouth Health Department
APPROVED
ma Date
APPROVED: BOARD OF HEALTH
DATE AGENT
a �S8\PROJ,6250-004dwg`6250-OOSAS.DKV 02007 SWEETSER ENGtNEERINGI r,
lr cu Z
z
z
ly �
QF9r O235
s�
6
PROPOSED SEPTIC DESIGN
FOR
DUBLIN CONSTRUCTION, INC.
PROJECT LOCATION T �T 20
DOVE'S VING ROAD, YARMOUTH
Sri ETSM?
GREAT WESTERN ROAD
508- P. 0. BOX 713
398-3922 SOUTH DENNIS, MASS. 02660
DATE DEC. 11, 2007
SCALE 1:> = 20'
JOB NO. 6250-00
REVISED I
LOCATION MAPREvsE°�
SHEET 1 OF 1
a �S8\PROJ,6250-004dwg`6250-OOSAS.DKV 02007 SWEETSER ENGtNEERINGI r,