Loading...
HomeMy WebLinkAbout11 Doves Wing Road Proposed Septic DesignTOP OF FOUNDATION ELEV. _ _37.30 --� FT. MINIMUM MODEL AX 5.00 4" CAST IRON PIPE (R EALMU PIOTCH 0 /4"") PEIRI FTM f77 ELEV. _�,3Q_ 20 FT. MINIMUM FROM CELLAR HORIZ SYSTEM (SAS) COLOR CAP & 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE MANHOLE COVERS CHAMBER CLEAN SAND N INSPECTION l VALVE 2. LAYER OF 4-25 OBSERVED WATER TABLE (9/13/05) ELEV. = _ 952 TEST HOLE 2, LOT 9 LOAMY SAND 10YR7/8 PORT MANHOLE -X425_ PUMP CHAMBER CALCULATIONS: 2" SCHEDULE 40 PVC PIPE -2�5- ¢-- 36,08 MAX. 33,63 MIN. 1k8" TO 1/2" COVERS WASHED STONE VENT REQUIRED BOTTOM OF INSIDE PUMP CHAMBER MIN, PITCH 1/8" PER FT. VOLUME OF WATER IN FEED 3.14 0.00694 35 FT. _ �,7l_ CU. FT. BOTTOM OF OUTSIDE PUMP CHAMBER _28_12_ _2@Z@_ VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X 5_ FT. - -DM- CU. FT. 16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE 2" PRESSURE PIPE REQUIRED SEPTIC TANK CAPACITY GAL. TOTAL MINIMUM VOLUME PER CYCLE 1204 CU. FT. , DISCHARGE 1204- CU.FT. /34.67 CU.FT./FT. _ AM- FT. (1000 G.S.T.) 2000 GAL. 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. STORAGE CAPACITY (,_3XQ_GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.) _ -1,27-- FT. SOIL CLASSIFICATION _1,27_ REQUIRED 3.54_ PROVIDED ` j / 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. 150 PSI MINIMUM CAP & 5 MIN,AN. 5.0' 6. COMPLETION OF SEPTIC SYSTEM;'PRIOR TO BACKFILL: EFFLUENT LOADING RATE _ J4_ GAL/DAY/S.F.. 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A LEACHING AREA 475.18 SQ, FT, VALVE 18. PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY } 10.33 X 46 & 14.5' HEAD) OR EQUAL. LEACHING CAPACITY (AREA X RATE) _3511; GAL/DAY MANHOLE 475.18 X 0.74 Yarmouth Health Department <� RESERVE LEACHING CAPACITY$L¢',E t 26 < 'I,E COPYoC 1 i ^° � END MEW n08 Na a Date m� 1 1 ,ya 3" DIA. PVC. ' J AOO J I°7- MANIFOLD VALVE e e aI e APPROVED: BOARD OF HEALTH e z" HOE d�BTf.� _ 4xITAa\*M DATE AGENT ELEV. = 32.00_ o o` o o e e o 6' o e o EEV.e 31.50 2" HOE LEV. ELEV. e 3/HO 14 STANDARD INFILTRATORS WITH BIOTUBE HOLE 3/4" TO 1 1/2" CLEAN STONE IN A z WELL A1W 230 NE�^ PUMP DOUBLEWASHED STONE 10.33' X 46' X 6* FIELD FORMATION 19.50 ZONE C INDEX 23.3 PACKAGE Q25 • i� FREE OF FINES & SILT CHECK SOIL ABSORPTION ADJUST 2-8 / ELEV. 1500GAL. �L63_ (TO BE SET ON A FIRM BASE) 2000 GALLON SEPTIC TANK SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE , \ t \ \ \ \ \ \ 32.1 A ca a 5 CIL. N VALVE HORIZ SYSTEM (SAS) COLOR PUMP OTHER 0-4 A CHAMBER t0YR5/2 USGS PROBABLE WATER TABLE ELEV. = 1230 4-25 OBSERVED WATER TABLE (9/13/05) ELEV. = _ 952 TEST HOLE 2, LOT 9 LOAMY SAND 10YR7/8 BOTTOM OF TEST HOLE ELEV. - 33.64_ ELEV. AT INVERT INET -X425_ PUMP CHAMBER CALCULATIONS: ELEV. AT ALARM ELEV. AT PUMP ONN -2�5- ¢-- REQUIRED FLOW PER CYCLE .25 X X330_ _ $2_530 GAL./CYCLE I ELEV. AT PUMP OFF -Z VOLUME PER CYCLE 82_50 GAL CYCLE 48 GA. FT. - 11.03 CU. FT./CYCLE L/CUX BOTTOM OF INSIDE PUMP CHAMBER -2t-83 - VOLUME OF WATER IN FEED 3.14 0.00694 35 FT. _ �,7l_ CU. FT. BOTTOM OF OUTSIDE PUMP CHAMBER _28_12_ _2@Z@_ VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X 5_ FT. - -DM- CU. FT. 16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE TOTAL VOLUME OF WATER RETURNED 1.01- CU. FT. REQUIRED SEPTIC TANK CAPACITY GAL. TOTAL MINIMUM VOLUME PER CYCLE 1204 CU. FT. , DISCHARGE 1204- CU.FT. /34.67 CU.FT./FT. _ AM- FT. (1000 G.S.T.) 2000 GAL. 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. STORAGE CAPACITY (,_3XQ_GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.) _ -1,27-- FT. SOIL CLASSIFICATION _1,27_ REQUIRED 3.54_ PROVIDED ` 1000 GALLON �EPT1C TANK O 3" MANIFOLD S - 'MANX " \ 10 / UMP AMBER SC, L A J TEaT 00 0 \\`` 1 5. \�� • 34.69 J \ I LIMIT OF 5' i SO'L ) Ak - \ 34. \ \ ) \� r 3.64 N Ao- • 33.37 • 33.26 z' Ff 3 - 3/8" DRAINAGE HOLES PER LATERAL 0 BEGINNING, MIDDLE & END (6 TOTAL) 3" PVC MANIFOLD DISTRIBUTION LATERALS AT 52" O.C. SIDE VIEW 1-1/2" LATERAL LINE 3/8" HOLES 0 5' O.C. ALTERNATE SIDES (0 11 AND 1 O'CLOCK) SOIL TEST DATE OF SOIL TEST SEPTEMBER 13, 2005 SOIL TEST DONE BY SWL E7SER ENGINEERING ` WITNESSED BY A,QN_jjg_NL___ . a OBSERVALnON HOLE i ELEV.=_3.3 90 OBSERVATION HOLE 2 EEV,=__33.80 PERCOLATION RATE < 2 MIN./INCH AT 61 INCHES PERCOLATION RATE _< _ MIN./INCH IN C HORIZON DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-4 A LOAMY SAND t0YR5/2 NO 4-25 8 LOAMY SAND 10YR7/8 3 - 25-120 C MEDIUM SAND 2.5Y7/4 DATE JAN. 11 006 14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED. i i I 15. THE SEPTIC TANKS AND PUMP CHAMBER ARE DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-14 A LOAMY SAND 10YR5/2 NO 14-28 8 LOAMY SAND 10YR7/8 3 28-120 C MEDIUM SAND 2.5Y7/4 DATE JAN. 11 006 NO WATER tNCOUNTERED AT 17n" ELEV. _ �3 90 NO WATER ENCOUNTERED AT _ 120=_ i ELEV. o.v 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. PROPOSED SEPTIC DESIGN FOR DUBLIN CONSTRUCTION, INC. 11. ALARM IS TO BE BOTH AUDIO AND VISUAL. ?OM•PUMP CHAMBER I DESIGN CALCULATIONS THAT T}4ERE IS NO_LN!FILTRATION OF CP.OUNOWATER.INTO FAGIUTIES. i a NUMBER OF BEDROOMS 3 FOR A MINIlIUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE ( 1 GARBAGE DISPOSAL UNIT REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). DATE JAN. 11 006 14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED. TOTAL ESTIMATED FLOW 15. THE SEPTIC TANKS AND PUMP CHAMBER ARE ( 110 GAL/BR./DAY X .3. BR.) _� _ GAL./DAY 16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE �I I REQUIRED SEPTIC TANK CAPACITY GAL. o , ACTUAL SIZE OF SEPTIC TANK 2000 GAL. 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. __LO'-QTION SOIL CLASSIFICATION MAP j / 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. 1 DESIGN PERCOLATION RATE 5 MIN,AN. 5.0' 6. COMPLETION OF SEPTIC SYSTEM;'PRIOR TO BACKFILL: EFFLUENT LOADING RATE _ J4_ GAL/DAY/S.F.. 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A LEACHING AREA 475.18 SQ, FT, 18. PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY } 10.33 X 46 & 14.5' HEAD) OR EQUAL. LEACHING CAPACITY (AREA X RATE) _3511; GAL/DAY 475.18 X 0.74 Yarmouth Health Department <� RESERVE LEACHING CAPACITY$L¢',E GAL./DAY < 'I,E COPYoC 1 i ^° � END MEW Na a Date m� 1 PRESSURE PIPE o.v 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. PROPOSED SEPTIC DESIGN FOR DUBLIN CONSTRUCTION, INC. 11. ALARM IS TO BE BOTH AUDIO AND VISUAL. ?OM•PUMP CHAMBER PROJECT LOCATION 1DT 14 DOVE'S TING ROAD, YAR OUTH THAT T}4ERE IS NO_LN!FILTRATION OF CP.OUNOWATER.INTO FAGIUTIES. i a 13. ALL UNSUITABLE MATERIAL SHALL BE REMOVED,=FROM UNDER AND FOR A MINIlIUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE ( REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). DATE JAN. 11 006 14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED. SCALE ill c 20' 15. THE SEPTIC TANKS AND PUMP CHAMBER ARE TO BE SET ON A FIRM BASE OR 3/4" TO 1 1/2` STONE 6' THICK. 16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE �I I s o o , 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. __LO'-QTION 3. IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION. MAP j / 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. 5.0' 5.0' 6. COMPLETION OF SEPTIC SYSTEM;'PRIOR TO BACKFILL: 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A \ __ •��3.0 0 \`\ M,4NHOES 1 / 131.2 MANHOLS _ '33 _VENT J � o \ t 1 ?• � / ' 3 i S. f:OIL 2�- w U. f TEST 1 �`> 34.48 / AD LATEX y ` ��" ( AX -2 FILTER`O?A TE afVA MY- r#2e' 1 \� 1 �\ �7 r Opo \ ',LIMIT OF 5' I 20 o LLON '{ -, \ ;OVERDIG 6 \ EP7!C ANKUVP r, V 1 w 33.75 H MBER ,\ v % \`33.Zn ,\ ' u1 26 n I _ \ 3" 62 MANIFOLD\\ J 1 )1 `) T 3, \$1 ` MANHOLES I " 33.09 z ,, DRIVE 33.61 / / A f I\ 31.2368 58. J 60.07, / 35104 LOT 15 l� 19,660 f SF. 33.03 / / 35.05 32.90 / 32.82 i LEGEND: - EXISTING SPOT ELEVATION 00„0 / EXISTING CONTOUR ----00---- 1 - FINAL SPOT ELEVATIONSi 000 FINAL CONTOUR J \ NC7f SOIL TEST LOCATION UTILITY POLE -o-- TOWN WATER -W W - CATCH BASIN GAS LINE CLEAN OUT CESSPOOL C.P. Q TOP VIEW NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO FINISHED GRADE. i 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF W YHSTANDING H-20 LOADING. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL a BE MORTARED IN PLACE. a 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH i DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE -AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT .1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE C 9. LOT IS SHOWN ON ASSESSORS MAP `109_ AS PARCEL 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. PROPOSED SEPTIC DESIGN FOR DUBLIN CONSTRUCTION, INC. 11. ALARM IS TO BE BOTH AUDIO AND VISUAL. 12. SEPTIC TANK AND PUMP CHAMBER=ARE TOBETESTED TO INSURE PROJECT LOCATION 1DT 14 DOVE'S TING ROAD, YAR OUTH THAT T}4ERE IS NO_LN!FILTRATION OF CP.OUNOWATER.INTO FAGIUTIES. i a 13. ALL UNSUITABLE MATERIAL SHALL BE REMOVED,=FROM UNDER AND FOR A MINIlIUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). DATE JAN. 11 006 14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED. SCALE ill c 20' 15. THE SEPTIC TANKS AND PUMP CHAMBER ARE TO BE SET ON A FIRM BASE OR 3/4" TO 1 1/2` STONE 6' THICK. 16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE REVISED o ,., FOLLOWING MINIMUM INSPECTIONS: t 1. STAKE OUT SYSTEM. 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. __LO'-QTION 3. IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION. MAP j / 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. 5. INSTALLATION OF ALL PIPING. 6. COMPLETION OF SEPTIC SYSTEM;'PRIOR TO BACKFILL: 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A SUITABLE DISPOSAL SITE. 18. PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY 7 & 14.5' HEAD) OR EQUAL. , Yarmouth Health Department <� APPROVED < 'I,E COPYoC ^° � Na a Date m� 1 ,ya J AOO T. e APPROVED: BOARD OF HEALTH ?, N d�BTf.� 4xITAa\*M DATE AGENT C• V8PROJ\6250-COdw6250-COSASDMlG 02006-SWEETSER £NGINEER'NG - ' i WCVi7 ? Z H U) cP�nST c� y� STS 6 RGV� PROPOSED SEPTIC DESIGN FOR DUBLIN CONSTRUCTION, INC. PROJECT LOCATION 1DT 14 DOVE'S TING ROAD, YAR OUTH \ i \ S :235 GER GRQ VBG REAT AD 508- SOUTH DEBNIS,7MASS. 398-3922 02660 DATE JAN. 11 006 SCALE ill c 20' A REVISED o ,., JO LA0. fi250-00 ., t -y __LO'-QTION SHEET ' 1 OF 1 MAP j / C• V8PROJ\6250-COdw6250-COSASDMlG 02006-SWEETSER £NGINEER'NG - \ i \ A A t -y C• V8PROJ\6250-COdw6250-COSASDMlG 02006-SWEETSER £NGINEER'NG -