Loading...
HomeMy WebLinkAbout11 Doves Wing Road Proposed Septic Design 2TOP OF FOUNDATION ELEV. 37.30 10 FT. MINIMUM ADVANTEX -T- MODEL AX -20 6.00 LITCH T IRON PIPE I UAL) MINIMUM /4" PER FT. ELEV. _ _3L30- 20 FT. MINIMUM FROM CELLAR TEXTURE COLOR MOTT. CAP & 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE MANHOLEINSPECTICN COVERS CLEAN 'SAND ELEV. _ 2' LAYER OF 4-25 B LOAMY SAND PUMP PORT :. MANHOLVALVE .E 25-120 C _3L83_ 2" SCHEDULE PVC PIPE " 35.08 MAX 33.83 MIN. WASHED STONE' 1/8" TO 1/2" COVERS VENT REQUIRED USGS PROBABLE VATER TABLE ELEV. _-1230_ MEDIUM SAND M. PITCH 1/88 PER FT. �LOtzz d-- 2" PRESSURE PIPE �5iL TEST HOLE 2, LOT 9 (TO BE SET ON A FIRM�B�ASE) 150 PSI MINIMUM CAP & 2000 GALLON ELEV. AT INVERT INLET z PUMP CHAMBERCALCULATIONS: MANHOLE VALVE ELEV. AT ALARM ON ELEV. AT PUMP ON -27,.7 _27,18: REQUIRED FLOW PER CYCLE .25 X 330 `" s 82.50 GAL/CYCLE COVERS �t SEWAGE DISPOSAL SYSTEM PROFILE ELEV. AT PUMP OFF _26.83_ VOLUME PER CYCLE -8250 GAL/CYCLE /7.48 GAL./CU. FT. = 11.03 CU. FT./CYCLE NOT TO SCALE BOTTOM OF INSIDE PUMP CHAMBER 28.0 33.08 " I BOTTOM OF OUTSIDE PUMP CHAMBER 3" DIA. PVC. e 1-1/2 LATERAL LINE _ _2iZ5_ TOTAL VOLUME OF WATER RETURNED _ IM_ CU. FT. MANIFOLD' VALVE e . - = 4 c 7; 1, 'I2" HOLE TOTAL MINIMUM VOLUME PER CYCLE ' 12.04 CU. FT, ALTERNATE SIDES ELEV. - 32.00 (0 11 AND 1 O'CLOCK) - o ae eo ao o °a -6a ELEV. O _12Z REQUIRED _2M_ PROVIDED .eo 2" OLE 3 - 3/8" DRAINAGE HOLES PER LATERAL ELEV. '0 BEGINNING, MIDDLE & END (6 TOTAL) - a 2.00 3/8" DRILL 32.00,7//Z 14 STANDARD INFILTRATORS WITH MANIFOLD HOLE 3/4" TO 1 1/2" CLEAN STONE IN A_ TON LATERALS WELL A1W 230 1OW LINE PUMP DOUBLE WASHED STONE 10.33' X 46' X 6' FIELD FORMATION 5 19.50 ZONE C 23.3 N. PACKAGE • QZ� � FREE OF FINES & SILT CHECK SOIL ABSORPTION INDEX ADJUST 2e �" mm TET `\ 5 � � • 34.69 I - \ o \N \ } \ o " 1 rn ` LIMIT OF 5'OVERDIG I \ ♦ o SO'L` TES? 2\ TOP VIEW 33.25 .64 MANHOLES 1 \ u 1 2 \� \ 11 MA HOL S 103' -VENT, N_ Lar 1 � f 2F-1 TEST 1 L'A 1 34.48 - - - 1 AD ANTER t u \ AX -2 FILTER ,t 1 I 1 4ul ,LIMIT OF 5' / 2000 L LON ) \ VE IG 11 1 1 ' •� u� SEPTIC 'ANK 1 1 33.75 1 o CH !lBERA 1I I * s TEST '2 ,o I = 31 26 x 3" MANIFOLD \\ \ 3 62 ell MANHOLES \\ i 33.09 1 , 33.81 / I J n / I I I 31.23 I 1 ( 31c 35104 I % LOT 15 1, 19,660 t &F. 33.03 / 35.C5 ` 32.90 / 32.82- i r � SOIL TEST DATE OF SOIL TEST _13_2005 !" SOIL TEST DONE BYS EETSER ENGINEERING WITNESSED BY A._VON H.gNE_ s OBSERVATION HOLE 1 ELEV.= 33.90 OBSERVATION HOLE 2ELEV.�_33.�D PERCOLATION RATE _< �_ MIN./INCH AT 61__ INCHES PERCOLATION RATE MIN./NCH.1N LC HORIZON DEPTH 1500 TEXTURE COLOR MOTT. VALVE 0-4 SYSTEM (SAS) LOAMY SAND 10YR5/2 ELEV. _ GAL. 4-25 B LOAMY SAND PUMP 14-28 -.B 25-120 C _3L83_ 2.5Y7/4 9 CHAMBER 28-120 USGS PROBABLE VATER TABLE ELEV. _-1230_ MEDIUM SAND 2.5Y7/4 �LOtzz d-- . �TfON MAP � OBSERVED WATER TABL: (9/13/05) ELEV. _ �5iL TEST HOLE 2, LOT 9 (TO BE SET ON A FIRM�B�ASE) BOTTOM Or TEST HOLE ELEV. _ 2000 GALLON ELEV. AT INVERT INLET -3225_ PUMP CHAMBERCALCULATIONS: 7 SEPTIC T TANK ELEV. AT ALARM ON ELEV. AT PUMP ON -27,.7 _27,18: REQUIRED FLOW PER CYCLE .25 X 330 `" s 82.50 GAL/CYCLE �t SEWAGE DISPOSAL SYSTEM PROFILE ELEV. AT PUMP OFF _26.83_ VOLUME PER CYCLE -8250 GAL/CYCLE /7.48 GAL./CU. FT. = 11.03 CU. FT./CYCLE NOT TO SCALE BOTTOM OF INSIDE PUMP CHAMBER 28.0 VOLUME OF WATER IN FEED 3.14 X 0.00694 X 1 1311 FT. _ ,;.Q,ZS_ CU. FT. " I BOTTOM OF OUTSIDE PUMP CHAMBER VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X _,6A FT. _ __0M_ CU. FT, 1-1/2 LATERAL LINE _2iZ5_ TOTAL VOLUME OF WATER RETURNED _ IM_ CU. FT. - 3/8 HOLES 0 5 O.C. TOTAL MINIMUM VOLUME PER CYCLE ' 12.04 CU. FT, ALTERNATE SIDES DISCHARGE 12&4_ CU.FT. /34.67 CU.FT./FT. _ ,9,3.5_ FT. (1000 G.S.T. (0 11 AND 1 O'CLOCK) STORAGE CAPACITY (_330_GAL./DAY/7,48 GAL/CU.FT./34.67 CU.FT./FT.) - --tv_ 'T. O _12Z REQUIRED _2M_ PROVIDED 3 - 3/8" DRAINAGE HOLES PER LATERAL '0 BEGINNING, MIDDLE & END (6 TOTAL) - - - - MANIFOLD TON LATERALS O.C. SIDE VIEW FD 2" PRESSURE PIPE 25 5.0' FROV'PUMP CHAMBER �" mm TET `\ 5 � � • 34.69 I - \ o \N \ } \ o " 1 rn ` LIMIT OF 5'OVERDIG I \ ♦ o SO'L` TES? 2\ TOP VIEW 33.25 .64 MANHOLES 1 \ u 1 2 \� \ 11 MA HOL S 103' -VENT, N_ Lar 1 � f 2F-1 TEST 1 L'A 1 34.48 - - - 1 AD ANTER t u \ AX -2 FILTER ,t 1 I 1 4ul ,LIMIT OF 5' / 2000 L LON ) \ VE IG 11 1 1 ' •� u� SEPTIC 'ANK 1 1 33.75 1 o CH !lBERA 1I I * s TEST '2 ,o I = 31 26 x 3" MANIFOLD \\ \ 3 62 ell MANHOLES \\ i 33.09 1 , 33.81 / I J n / I I I 31.23 I 1 ( 31c 35104 I % LOT 15 1, 19,660 t &F. 33.03 / 35.C5 ` 32.90 / 32.82- i r � SOIL TEST DATE OF SOIL TEST _13_2005 !" SOIL TEST DONE BYS EETSER ENGINEERING WITNESSED BY A._VON H.gNE_ s OBSERVATION HOLE 1 ELEV.= 33.90 OBSERVATION HOLE 2ELEV.�_33.�D PERCOLATION RATE _< �_ MIN./INCH AT 61__ INCHES PERCOLATION RATE MIN./NCH.1N LC HORIZON DEPTH HOPI TEXTURE COLOR MOTT. OTHER 0-4 A LOAMY SAND 10YR5/2 NO LOAMY SAND 4-25 B LOAMY SAND 10YR7/8 14-28 -.B 25-120 C MEDIUM SAND 2.5Y7/4 9 NO WATER ENCOUNTERED AT _�20= ELEV. _ __23,90 NO WATER ENCOUNTERED AT 120" ELEV. _ _23 8.0 ' DESIGN CALCULATIONS NUMBER OF BEDROOMS 3 t GARBAGE' DISPOSAL UNIT , TOTAL ESTIMATED FLOW ( 110 GAL/8R./bAY X _ .3_ 8R.)_,i'�'0_ GAL/DAY REQUIRED SEPTIC TANK CAPACITY L960- GAL.. ; ACTUAL SIZE OF SEPTIC TANK 2900 GAL SOIL CLASSIFICATION 1- . DESIGN PERCOLATION RATE VIN./IN. j EFFLUENT LOADING RATE 9.7-4- GAL./DAY/S.F. LEACHING AREA .18 SQ. FT. 10.33 X 46 LEACHING CAPACITY (AREA X RATE) 35183 GAL/DAY 475.18 X 0.74 RESERVE LEACHING CAPACITY GAL -./DAY a END VIEW } NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO O.E.P. ` TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TOSANITARY -UNITS SHALL BE BROUGHT TO FINISHED GRADE. 3. ALLCOMPONENTSOF THE SANITARY SYSTEM SHALL BE CAPABLE 0r , WIYHSTANDING H-20 LOADING. ^ 4. ANY MASONARY UNITS USED TO'BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. - a a 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO 'OBTAIN SUCH DETERMINATIONFROMAPPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE 'ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 ;AT LEAST .72 HOURS PRIOR 70 COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES ANO ELEVATIONS AS WELL AS ' SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. S. PARCEL IS 114 FLOOD ZONE _G 9. LOT IS SHOWN ON ASSESSORS MAP _1Q9� AS PARCEL ___X . _ 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. 11. ALARM IS TO BE BOTH AUDIO AND VISUAL, 1 12. SEPTIC TANK AND PUMP CHAMBER ARE TO BE TESTED TO INSURE THAT THERE IS NN INFIt.TR ATION _. CSG ?r=b!_INC1WATFP VlTC1 FACJUTrS s 13. ALL UNSUITABLE MATFRIAL SHALL B> REMOVED FROM UNDEP AND ` FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). 14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED, 15, THE SEPTIC TANKS AND PUMP CHAMBER ARE TO BE SET ON A FIRM BASE OR 3/4" 1`0.1 1/2"STONE 6' THICK. 16. THE CONTRACTOR IS TO CONTACT THE .DESIGN ENGINEER FOR THE - FOLLOWING MINIMUM INSPECTIONS: 1. STAKE OUT SYSTEM. 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. 3. IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION. 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. S. INSTALLATION OF ALL PIPING. - - 6. COMPLETION OF SEPTIC SYSTEM, PRfOR TO BACKFILL. 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A 9 SUITABLE DISPOSAL SITE. 18. PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY & 14.5' HEAD) OR EQUAL 5 I? �j f .i.' `N �,( APPROVED: BOABy RD FMaHE�° ��OUsrka�o w1 �gv 4VITARIAN DATE AGENT DEPTH HORIZ TEXTURE COLOR MOTT. OTHER s PROJECT LOCATION LOT 1 y } JJU !p. DOVE'S G ROAD, sYARMOUTH 0-14 A LOAMY SAND 10YR5/2' NO a 14-28 -.B LOAMY SAND < 10YR7/8 SCALE it, _ 20' 9 28-120 C MEDIUM SAND 2.5Y7/4 �LOtzz . �TfON MAP � REV SSD �-... �� SNEER' .1 7,F 1 NO WATER ENCOUNTERED AT _�20= ELEV. _ __23,90 NO WATER ENCOUNTERED AT 120" ELEV. _ _23 8.0 ' DESIGN CALCULATIONS NUMBER OF BEDROOMS 3 t GARBAGE' DISPOSAL UNIT , TOTAL ESTIMATED FLOW ( 110 GAL/8R./bAY X _ .3_ 8R.)_,i'�'0_ GAL/DAY REQUIRED SEPTIC TANK CAPACITY L960- GAL.. ; ACTUAL SIZE OF SEPTIC TANK 2900 GAL SOIL CLASSIFICATION 1- . DESIGN PERCOLATION RATE VIN./IN. j EFFLUENT LOADING RATE 9.7-4- GAL./DAY/S.F. LEACHING AREA .18 SQ. FT. 10.33 X 46 LEACHING CAPACITY (AREA X RATE) 35183 GAL/DAY 475.18 X 0.74 RESERVE LEACHING CAPACITY GAL -./DAY a END VIEW } NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO O.E.P. ` TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TOSANITARY -UNITS SHALL BE BROUGHT TO FINISHED GRADE. 3. ALLCOMPONENTSOF THE SANITARY SYSTEM SHALL BE CAPABLE 0r , WIYHSTANDING H-20 LOADING. ^ 4. ANY MASONARY UNITS USED TO'BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. - a a 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO 'OBTAIN SUCH DETERMINATIONFROMAPPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE 'ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 ;AT LEAST .72 HOURS PRIOR 70 COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES ANO ELEVATIONS AS WELL AS ' SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. S. PARCEL IS 114 FLOOD ZONE _G 9. LOT IS SHOWN ON ASSESSORS MAP _1Q9� AS PARCEL ___X . _ 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. 11. ALARM IS TO BE BOTH AUDIO AND VISUAL, 1 12. SEPTIC TANK AND PUMP CHAMBER ARE TO BE TESTED TO INSURE THAT THERE IS NN INFIt.TR ATION _. CSG ?r=b!_INC1WATFP VlTC1 FACJUTrS s 13. ALL UNSUITABLE MATFRIAL SHALL B> REMOVED FROM UNDEP AND ` FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). 14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED, 15, THE SEPTIC TANKS AND PUMP CHAMBER ARE TO BE SET ON A FIRM BASE OR 3/4" 1`0.1 1/2"STONE 6' THICK. 16. THE CONTRACTOR IS TO CONTACT THE .DESIGN ENGINEER FOR THE - FOLLOWING MINIMUM INSPECTIONS: 1. STAKE OUT SYSTEM. 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. 3. IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION. 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. S. INSTALLATION OF ALL PIPING. - - 6. COMPLETION OF SEPTIC SYSTEM, PRfOR TO BACKFILL. 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A 9 SUITABLE DISPOSAL SITE. 18. PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY & 14.5' HEAD) OR EQUAL 5 I? �j f .i.' `N �,( APPROVED: BOABy RD FMaHE�° ��OUsrka�o w1 �gv 4VITARIAN DATE AGENT C. SB PROD 6250-00�dw 6250-OOSAS.ON'G 02006 SWEETS ERI ENGINEERINGJ _ _ 1 LOCUS ? O z ✓ Ssl o_ u, FSr ROVZ� 6 "a PROPOSED SEPTIC DESIGN FOR DUBLIN CONSTRUCTION, IVC. s PROJECT LOCATION LOT 1 y } JJU !p. DOVE'S G ROAD, sYARMOUTH I S� 235 mGREATm �S GR F m D G 508 P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. ` 02( ` a DATE JAN. 'l T , 2006 SCALE it, _ 20' JOB N0.' 6250- 60 ' REVISED �LOtzz . �TfON MAP � REV SSD �-... �� SNEER' .1 7,F 1 C. SB PROD 6250-00�dw 6250-OOSAS.ON'G 02006 SWEETS ERI ENGINEERINGJ _ _ 1 "a s I a I I C. SB PROD 6250-00�dw 6250-OOSAS.ON'G 02006 SWEETS ERI ENGINEERINGJ _ _ 1