PUMP CHAMBER CALCULATIONS:
A
FILL
10YR3/3
NO
2000 GALLON
ELEV.
AT INVERT INET
ALARM N
_���_
-
REQUIRED FLOW PER CYCLE .25 X 330_ = 8250 GAL./CYCLE
s
•o.
ROOTS
41-60
B
SEPTIC TANK
3" DIA. PVC.
AT
AT PUMP ON
ROOTS
VOLUME PER CYCLE 8250 GAL/CYCLE /7.48 GAL./CU. FT. _ 1,0 CU.
FT./CYCLE
MEDIIUM/10YR7/8
2.5YB/3
SEWAGE DISPOSAL SYSTEM
PROFILE
ELEV. AT PUMP OFF
BOTTOM OF INSIDE PUMP CHAMBER
- � -
VOLUME OF WATER IN FEED 3.14 X O.OQ694 X __8__ FT. _ FT. CU. FT.
VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X ,�__ FT• _475-
CU. FT.
r
NOT TO SCALE
C3
BOTTOM O� OUTSIDE PUMP CHAMBER
MANIFOLD VALVE
TOTAL VOLUME OF WATER RETURNED _Q.42_ CU. FT.
20-168
C4
MEDIUM/
g,00
FINE SAND
4' CAST IRON PIPE
-FT.
STORAGE CAPACITY (__ 4_GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.; _
_ L27 FT.
e. o o` a a o 0 0 o o. ° e oBo o
EL
{OR EQUAL) MINIMUM j -:
_12Z_ REWIRED 5Q_ PROVIDED
' }
p°°
° o ° 0 0 0 0 0
,,.
PITCH 1/4" PER FT.
7SUPP
o o
15
35104
COT
19,660
2" HOLE
33.03
/ 35.05
+
/
32.90
/
ELEV.
14 STANDARD INFILTRATORS WITH
ELEV. _5�_
33.9_
3/8" DRILL
32.82
STONE INA
i
p
BIOTUBE
HOLE 3/4" TO 1 1 f 2" CLEAN
STONE
10.33" X 46' X So FIELD FORMATION
N
DOUBLE WASHED
FLOW LINE
PUMP
FREE OF FINES & SILT
SORPTION
ELEV. _ ^33.92 _
m 33_4
T -
WELL A1W 230
21.12 ZONE C
INDEX 23.3
ADJUST 2.8
ELEV. CHECK SOIL AB
TM°I. VALVE SYSTEM (SAS)
1500
USGS PROBABLE WATER TABLE ELEV.=
ELEV. GAL PUMP OBSERVED WATER TABLE (9/13/05) ELEV. _ �8 5Q_ TEST HOLE 2, LOT 9
CHAMBER BOTTOM OF, TEST HOLE ELEV. = _2&80 -
1-1/2" LATERAL LINE
3/8" HOLES 0 5' O.C.
ALTERNATE SIDES
(0 11 AND 1 O'CLOCK)
0 BEGIN8- DRAINAGE HOLES PER AL
BEGINNING, MIDDLE & END (6 TOTAL)
3" PVC MANIFOLD
DISTRIBUTION LATERALS
AT 52 O.C. SIDE VIEW
SOIL TEST
DATE OF SOIL -TEST SEPTEMBER 13
2005
SOIL TEST DONE BY SWEETER ENBINELRi' G
WITNESSED BY
ERVA11flN HOLE ELEV.= 36.00 OBSMA110N HOLE 2 ELEV.= 38.80
06S
0 Im, Aniru AT RO wCHPS PERCOLATION RATE �_2 MIN./INCH IN C4 HORIZON
DEPTH
HORIZ
(TO BE SET ON A FIRM BASE)
COLOR
MOTT.
OTHER
PUMP CHAMBER CALCULATIONS:
A
FILL
10YR3/3
NO
2000 GALLON
ELEV.
AT INVERT INET
ALARM N
_���_
-
REQUIRED FLOW PER CYCLE .25 X 330_ = 8250 GAL./CYCLE
s
•o.
ROOTS
41-60
B
SEPTIC TANK
ELEV.
ELEV.
AT
AT PUMP ON
ROOTS
VOLUME PER CYCLE 8250 GAL/CYCLE /7.48 GAL./CU. FT. _ 1,0 CU.
FT./CYCLE
MEDIIUM/10YR7/8
2.5YB/3
SEWAGE DISPOSAL SYSTEM
PROFILE
ELEV. AT PUMP OFF
BOTTOM OF INSIDE PUMP CHAMBER
- � -
VOLUME OF WATER IN FEED 3.14 X O.OQ694 X __8__ FT. _ FT. CU. FT.
VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X ,�__ FT• _475-
CU. FT.
y' i,i GALJDAY
NOT TO SCALE
C3
BOTTOM O� OUTSIDE PUMP CHAMBER
_ 054_
TOTAL VOLUME OF WATER RETURNED _Q.42_ CU. FT.
20-168
C4
MEDIUM/
TOTAL MINIMUM VOLUME PER CYCLE 1345- CU. £T.
DISCHARGE 1145- CU /34.67 CU.FT./FT. = _4.35_ FT. (1000 G.S.T.
FINE SAND
-FT.
STORAGE CAPACITY (__ 4_GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.; _
_ L27 FT.
_12Z_ REWIRED 5Q_ PROVIDED
' }
,,.
7SUPP
15
35104
COT
19,660
33.03
/ 35.05
+
/
32.90
/
32.82
i
1-1/2" LATERAL LINE
3/8" HOLES 0 5' O.C.
ALTERNATE SIDES
(0 11 AND 1 O'CLOCK)
0 BEGIN8- DRAINAGE HOLES PER AL
BEGINNING, MIDDLE & END (6 TOTAL)
3" PVC MANIFOLD
DISTRIBUTION LATERALS
AT 52 O.C. SIDE VIEW
SOIL TEST
DATE OF SOIL -TEST SEPTEMBER 13
2005
SOIL TEST DONE BY SWEETER ENBINELRi' G
WITNESSED BY
ERVA11flN HOLE ELEV.= 36.00 OBSMA110N HOLE 2 ELEV.= 38.80
06S
0 Im, Aniru AT RO wCHPS PERCOLATION RATE �_2 MIN./INCH IN C4 HORIZON
DEPTH
HORIZ
TEXTURE
COLOR
MOTT.
OTHER
0-34
A
FILL
10YR3/3
NO
ROOTS
34-41
A
LOAMY SAND
10YR3/2
s
•o.
ROOTS
41-60
B
LOAMY SAND
10YR5/8
ROOTS
60-120
C
MEDIIUM/10YR7/8
2.5YB/3
5.0'
COBBLES
5.0'
475.18 SO. FT.
FINE SAND
10.33 X 46
LEACHING CAPACITY (AREA X RATE)
y' i,i GALJDAY
NO WATER ENCOUNTERED AT __ 120. ELEV. _ 2 m
END VIEW
TOP MEW � s
DEPTH
z. o
TEXTURE
COLOR
MOTT,
OTHER
0-10
A
LOAMY SAND
10YR3/3
NO
ROOTS
10-16-
B
a
10YR5/6
s
•o.
O
h
16-66
Cl
LOAMY SAND
10YR7/6
66-84
C2
MEDIUM/
2.5YB/3
5.0'
COBBLES
5.0'
475.18 SO. FT.
FINE SAND
10.33 X 46
LEACHING CAPACITY (AREA X RATE)
y' i,i GALJDAY
TOP MEW � s
DEPTH
HORIZ
TEXTURE
COLOR
MOTT,
OTHER
0-10
A
LOAMY SAND
10YR3/3
NO
ROOTS
10-16-
B
LOAMY SAND
10YR5/6
16-66
Cl
LOAMY SAND
10YR7/6
66-84
C2
MEDIUM/
2.5YB/3
-03-4- GAL./DAY/S.F,
COBBLES
LEACHING AREA
475.18 SO. FT.
FINE SAND
10.33 X 46
LEACHING CAPACITY (AREA X RATE)
y' i,i GALJDAY
84-120
C3
SILT LOAM
20-168
C4
MEDIUM/
FINE SAND
i
NO WATER ENCOUNTERED AT _168"_
ELEV. _ ?a-80
i
j
DESIGN CALCULATIONS
NUMBER OF BEDROOMS
- 3
NO
GARBAGE DISPOSAL UNIT
TOTAL ESTIMATED FLOW
L/SSEPR �
REQU110 IRED NK CAPJACITYBR'
M IZ GAL./DAY
GAL.
ACTUAL SIZE OF SEPTIC TANK
SOIL CLASSIFICATION
DESIGN PERCOLATION RATE
--1-
<J¢_ MIN./(N.
EFFLUENT LOADING RATE
-03-4- GAL./DAY/S.F,
LEACHING AREA
475.18 SO. FT.
10.33 X 46
LEACHING CAPACITY (AREA X RATE)
y' i,i GALJDAY
475.18 X 0.74
RESERVE LEACHING CAPACITY
sL55 GAL./DAY
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR
THE SUBSURFACE DISPOSAL OF SEWAGE.
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
FINISHED GRADE.
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF
WIYHSTANDING H-20 LOADING.
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
BE MORTARED IN PLACE.
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. -
6. UTILITIES SHOWN ARE APPROXIMATE ONLY. EXCAVATION CONTRACTOR
IS TO CALL "DIG -SAFE". AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE.
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY -VARIATION
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
IMMEDIATELY,
8. PARCEL IS IN FLOOD ZONE C
9. LOT IS SHOWN ON ASSESSORS MAP _LO9_ AS PARCEL X
10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS.
11. ALARM IS TO BE BOTH AUDIO AND VISUAL
12. SEPTIC TANK AND PUMP CHAMBER ARE TO BE TESTED TO INSURE
THAT THERE IS NO'iNnLTRATION OF GROUNDWATER INTO FACILITIES.`
13. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND
FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE
REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3).
14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED.
15. THE SEPTIC TANKS AND PUMP CHAMBER ARE
TO BE SET ON A FIRM BASE OR 3/4" TO 1 1/2" STONE 6` THICK.
16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE
FOLLOWING MINIMUM INSPECTIONS:
1. STAKE OUT SYSTEM.
2. PRIOR TO AND DURING THE SETTING OF THE TANKS.
3. IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION.
4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT.
5. INSTALLATION OF ALL PIPING.
6. COMPLETION OF SEPTIC SYSTEM, PRIOR TO BACKFILL.
17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A
SUITABLE DISPOSAL SITE.
18, PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY
& 14.5' HEAD) OR EQUAL.
SEP 2 1 2006
_ I
. r
e, BU