HomeMy WebLinkAbout53 Desert Sands Lane - Sewage Disposal Design 2a
SOIL TEST PIT DATA: SEPTIC TANK DETAIL: 1,500 GALLON DISTRIBUTION BOX DETAIL: NOT TO SCALE LEACHING TRENCH DETAIL: NOT TO SCALE
NOT TO SCALE
5. INLET AND OUTLET TEES TO BE CAST IRON, NO. OF OUTLETS : 3
NOTES: 1. SEPTIC TANK SHALL BE STEEL
TEST PIT �_ TEST PIT �- TEESSCHED.T 40 PVC OR CAST -IN-PLACE CONCRETE.
REINFGRD. EL. 99.7 GRD. EL. 100.0 2. SEPTIC TANK�TOJ WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. FINISHED GRADE I ,
GW. EL. - p' GW. EL. - UNLESS UNDER PAVEMENT, DRIVES OR B. APPROVED EQUAL MENDED MANUFACTURER-ROTONDO OR REMOVABLE � 2' WALLS NOTES: 26.25
0 0 2 TRAVELED WAYS, WHEREIN H-20 LOADING COVER
SHALL APPLY.
E 10YR 5/2 6" is • '.i: F • `.i: p.... �::a.::.' 3• 1.'DIST. BOX TO WITHSTAND H-10 LOADING10
1 6" 1 3. ALL PIPE CONNECTIONS AND CONCRETE PVC BMRER
BW 10YR 5/6 SANDY LOAM Bw 10YR 5/6 - CONSTRUCTION SHALL BE WATERTIGHT. UNLESS UNDER PAVEMENT, DRIVES OR
2' 2' SANDY LOAM 4. FILL ALL UNUSED KNOCKOUTS WITH T TRAVELED WAYS WHEREIN H-20 LOADING 52" 12'
SANDY LOAM , 36" PERC MORTAR. -� 1a• SHALL APPLY.
3 3 oll
3-24' DIA C.I. (60 MIN.) MANHOLE COVERS � %. 8. 2. PROVIDE INLET 'TEE OR BAFFLE WHERE Oal
1 1
INDICATES TEE TO BE UNDER BROUGHT TO WITHIN 6' OF FINISHED GRADE 6' 3,5' OUTLETS
' PERC. 12' MIN. :�..., .
SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR
4 52" PERC 4 TEST OPENINGCOVER 3„ ean$�o $ate oe ea�eeQ T IN PUMPED SYSTEM.
51-5' C r ! 24" DIA. '� 4" BOTTOM ON LEVEL - L- 2' 3. FIRST TWO FEET OF PIPE OUT OF DIST. PLAN VIEW 35' LEACHING CHAMBERS
C MEDIUM SAND 10'-6" STABLE BASE 6" MIN. 3/4' TO BOX TO BE LAID LEVEL
6, 6+ =: e.-'. • - -'-e .:•:- . .. 1 1/2' CRUSHED d
MEDIUM SAND GRAVEL 10'-0 NORMAL WATER LEVEL 12' CROSS-SECTION STONE BASE 4. RECOMMENDED MANUFACTURER-ROTONDO 3' MAX. COMaACTED FILL 3' MAXIMUM
3" OR APPROVED EQUAL 0 0 0 0 0 0
7 7 00 0o co°o 00 oo°OoopO
W POCKETS OF 2.5 YR 5/6 10' 20' 5. ALL PIPE CONNECTIONS AND CONCRETE 0 0
$'
W/POCKETS / INDICATES PRECAST SEPTIC TANK CONSTRUCTION SHALL BE WATERTIGHT. O Q O O O O O
9, FINE SAND/SILT 9+ -� GROUND WATER _ - - " INLET TEE 4'-9' t5 1/2' 30.5" " OQ O QQ �Q REMOVE
6. FIT BREAKOUT BARRIER SNUG AROUND 24 O O O
jil
D -BOX AND USE EPDXY RESIN FOR WATER EFFEC. 0 O UNSUITABLE
5-2 4'-6' ` 4'-D" MIN. 90' MD ON `- 5'-4" 15 1/2' I TIGHT SEAL DEPTH Q O ( TEC 330 O O O MATERIAL FOR
2.5 YR 6/4 NO WATER EL 90.0' - - - i = LIQUID DEPTH ac Q
10 10 5'-8"ortaDL) " i 0 00 O O 5' ALL AROUND
11' NO WATER EL 88.T 11+ BOT. TEST HOLE PRECBOX AST DIST. 7. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. 1 O IF APPLICABLE
4j 1�t-L_
12, BOT. TEST HOLE 12<�:: R.: �<<u:.
. _a 46" 52" 46"
b c BOTTOM ON LEVEL STABLE BASE �u 3• �J 5' 12' f- 5'
PLAN VIEW ® �Iw��- 71/2F I 22
DATE: DATE: 6' MIN. 3/4" TO PLAN VIEW =S -SECTION OF CHAMBER 6/2/99 6/2/99 �_- ESTIMATED 1 1/2" STONE CROSS-SECTION VIEW
TEST BY: TEST BY: SEASONAL HIGH
THE BSC GROUP, INC. THE BSC GROUP, INC. GROUND WATER -----------------------
WITNESSED BY: WITNESSED BY: T EDGE OF PAVEMENT
(� I J� INVERT ELEVATIONS.
AMY VON HANE AMY VON HONE D E S E R I SANDS LAN E TOP OF FOUNDATION 102.0
PERC. RATE: PERC. RATE:
-MIN./INCH 5 MIN./INCH 4" INVERT AT BUILDING 98.7
SOIL EVALUATOR SOIL EVALUATOR G - �� -- - G7 �--` IN 92
JAY DONOVAN JAY DONOVAN _ 4" INVERT AT SEPTIC TANK IN 98.5
( )
W
SOIL CLASS: SOIL CLASS: 50N70 0'10"w 4n INVERT AT SEPTIC TANK (OUT) 98.2
i I I p
TRANSFORMER R \ I 4 INVERT AT DIST. BOX (IN) 98.0
L.T.A.R. L.T.A.R. ELE. METER + \ \\ �� 4" INVERT AT DIST. BOX (OUT) 97.8
0.74 G.P.D./SQ.FT. 0,74 G.P.D./SQ.FT. I LIGHT} �\'`p�
I POST + \ +,o�;y INVERTS AT LEACHING FACILITY:
DATUM: ^\I ! �' 4" INVERT AT BEGINNING
VERTICAL DATUM: ASSUMED \ OF LEACHING CHAMBER 97.6
BENCH MARK USED: NAIL SET IN 20" SCRUB PINE I i OELE. METER
1 1 \
1 \ _ ELEVATION AT BOTTOM
PROFILE: NOT TO SCALE 1; I OF LEACHING CHAMBER 95.6
EL -102.0 FIRST PIPE LENGTH , �' I i I N
TOP FOUNDATION CONCRETE COVERS TO WITHIN71TO BE SET LEVEL a?
EL=101 6' OF FINISHED GRADE. FOR MIN. 2' FINISH GRADE 1 �\ I`
2' MIN. 4" PVC (PERF) L=100.0 ; 1 1 ` \
VCS 2 1 D' I I DESIGN CRITERIA:
CHP40 \ 4" PVC SCH 4D LEACHING CHAMBER I i \ \ \ i
=86.7 I=sBs1=97.60� 1 \ DESIGN FLOW:
I `�' 4 BEDROOMS AT110G.P.B./D 440 G.P.D.
1=98.0 fi' BOTTOM ELEV = 95.6 U 1 1 '
e 1=98.5 30UTLET I=97.8 ' \I`� N/F r~� NEI GARBAGE GRINDER
DIST. Box ss' I I �� LOT 2 2 MAURICE & BERNADETTE
1500 GALLON I 1 MITCHELL -
SEPTIC TANK ASSESSORS MAP 93 i ;A
NO OBSERVED GROUNDWATER rn i I I I �7 REQUIRED SEPTIC TANK:
s" STONE BASE rn 1 I PARCEL 15 `! 440 X 200% 880 GAL.
88.7 BOTTOM OF TEST HOLE 1 I
SEPTIC TANK PROVIDED: = 1500 GAL.
SIZE OF LEACHING FACILITY REQUIRED:
574'25'50"E 147.43 I DESIGN PERC. RATE: < 5 MIN./ INCH
+#�xor LONG TERM APPL. RATE 0.74 G.P.D/S.F.
1 I 1 LOT 23 _� .
I '� 440GPD - 0.74GPD SF = 595 SF.
11 I 5' OVERDIGF NEEDED I 11'0 /^�\ 33,669± S.F. 0 8 w
C) I I I 3 35' /� fid' � \\ N usa SIZE OF LEACHING FACILITY PROVIDED:
LEGEND I I 1 Qa la
// /9Y4 CULTEC LEACHING CHAMBERS
TP#1 TEST PIT 1 I ' � ��� � �� � G� .'300" - 12'x35'x2'
NAIL SET IN 1 I I 91 �O. TP# \� 2 �� �. \�a)
103 PROPOSED CONTOUR 20' PINE'021 / _\ 2 \ �\ 6 \ `
LOT 24 I'1 SIDEWALL (35' X 12') X 2' X 2' = 188 SF:
- E- ELECTRIC LINE I �, \ \\� \\\ BOTTOM (35' X 12') = 420S.F.
\ \ N . / TOTAL = 608 SF.
/ - I
4L.
/'9g- TOP OF`FND 102'\ � �` �� / / /
-G- GAS LINE / // r �� 10 �� \ �` \ \\ �� I > /
W - WATER / o /� 4�0\ TOP OF
/ � 1 \ \ SLAB 100' \ \ / % / / L0 LOCUS PLAN: NO SCALE
/\\'f \ , I \\ 1� \ \\ \ \�� / , / O o
-DE\G / /
8.1 pop / /
7� it T / w 6A
Q-3\ J \ \\ \ !\ `
I\
..L �\\ UMMAQUID
GOLF z LLi
SI
9 W \ CLUB
\\ \ \\ 1 % \ \\ \148 `\ \\ �f ti Q
N/F\ o r OPEN SPACE
JOSEPH & BARBARA \ \\ , \ \ / 7 i 1 1 \ HAMSTEAD DESERT SAND
PLAN VIEW RODRICKs \ \ o o� I , s \ \ \ \
SCALE: 1' = 20 FEET ASSESSORS MAP 93 \\ \ °A �\ \ 1 I 16 12 �\ \ \ \\ \\ LANE LANE
PARCEL 17 �� \ \ � \� \\ \\ \ \ \ N LOCUS
/F
0 10 20 40 FT. • \ \ \ \ \ \ \ \ �\ �� 1 \ \ CUMMAQUID
\ \ ` \�� HEIGHTS II _ 6
\ .0 \\ \ \ \ \ ��\ �\ ---------- \\ ASSESSORS MAP 103 44
• \ \ \ \` 1 PARCEL 9 � ti EXIT 7
OPEN SPACE B \ - - -,�
\ 2
REVISIONS
N0. DATE DESCRIPTION
GENERAL NOTES:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE
DISPOSAL FACILITY ONLY.
2. ALL CONSTRUCTION METHODS AND
MATERIALS SHALL CONFORM TO MASS.
D.EP TITLE 5 AND LOCAL BOARD
OF HEALTH REGULATIONS.
3. ALL PIPES LOCATED UNDER PAVEMENT "
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL
4. THERE ARE NO KNOWN PRIVATE WELLS
LOCATED WITHIN 150 FT. OF THE
PROPOSED LEACHING FACILITY NOR
ANY KNOWN WELLS PROPOSED WITHIN
150' OF ANY KNOWN LEACHING FAgL1TY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL. SUBSOIL AND OTHER
IMPERVIOUS MATERIAL
fi. REPLACE WITH CLEAN WASHED SAND
OR OTHER CLEAN GRANULAR SOILS
CONFORMING TO THE FOLLOWING
SIEVE ANALYSIS:
10� (MAX) 8Y WT. SHALL
PASS No. 50 SIEVE
d0 X of No. 4 SIEVE S}IALL
PASS No. 100
c5 z OF No. #SIEVE SHALL
PASS No. 200
UNIFORMITY COEFFICIENT Q No. 4
SIEVE </=6.0
7. EXISTING UTILITIES WHERE SHOWN
1N THE DRAWINGS ARE APPROXIMATE
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY WITH DIG -SAFE
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING UTILITY SYSTEM IN SERVICE.
DIG -SAFE SHALL 8E NOTIFIED PER
THE STATE OF MASSACHUSETTS
STATUTE CHAPTER 82, SECTION 409
AT TEL 1 -SOD -322-4844. THE
ENGINEER DOES NOT GUARANTEE
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
I•
TAKEN FROM RECORD PLANS. THE
CONTRACTOR SHALL VERIFY SIZE,
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
REVISIONS
N0. DATE DESCRIPTION
GENERAL NOTES:
1. THIS PLAN IS FOR DESIGN AND
CONSTRUCTION OF THE SEWAGE
DISPOSAL FACILITY ONLY.
2. ALL CONSTRUCTION METHODS AND
MATERIALS SHALL CONFORM TO MASS.
D.EP TITLE 5 AND LOCAL BOARD
OF HEALTH REGULATIONS.
3. ALL PIPES LOCATED UNDER PAVEMENT "
OR TRAVELED WAY SHALL BE SCHEDULE
40 OR EQUAL
4. THERE ARE NO KNOWN PRIVATE WELLS
LOCATED WITHIN 150 FT. OF THE
PROPOSED LEACHING FACILITY NOR
ANY KNOWN WELLS PROPOSED WITHIN
150' OF ANY KNOWN LEACHING FAgL1TY.
5. WITHIN LIMIT OF EXCAVATION REMOVE
ALL TOPSOIL. SUBSOIL AND OTHER
IMPERVIOUS MATERIAL
fi. REPLACE WITH CLEAN WASHED SAND
OR OTHER CLEAN GRANULAR SOILS
CONFORMING TO THE FOLLOWING
SIEVE ANALYSIS:
10� (MAX) 8Y WT. SHALL
PASS No. 50 SIEVE
d0 X of No. 4 SIEVE S}IALL
PASS No. 100
c5 z OF No. #SIEVE SHALL
PASS No. 200
UNIFORMITY COEFFICIENT Q No. 4
SIEVE </=6.0
7. EXISTING UTILITIES WHERE SHOWN
1N THE DRAWINGS ARE APPROXIMATE
THE CONTRACTOR SHALL BE RESPON-
SIBLE FOR PROPERLY LOCATING AND
COORDINATING THE PROPOSED CON-
STRUCTION ACTIVITY WITH DIG -SAFE
AND THE APPLICABLE UTILITY
COMPANY AND MAINTAINING THE
EXISTING UTILITY SYSTEM IN SERVICE.
DIG -SAFE SHALL 8E NOTIFIED PER
THE STATE OF MASSACHUSETTS
STATUTE CHAPTER 82, SECTION 409
AT TEL 1 -SOD -322-4844. THE
ENGINEER DOES NOT GUARANTEE
THEIR ACCURACY OR THAT ALL
UTILITIES AND SUBSURFACE STRUCTURES
ARE SHOWN. LOCATIONS AND
ELEVATIONS OF UNDERGROUND UTILITIES
TAKEN FROM RECORD PLANS. THE
CONTRACTOR SHALL VERIFY SIZE,
LOCATION AND INVERTS OF UTILITIES
AND STRUCTURES AS REQUIRED PRIOR
TO THE START OF CONSTRUCTION.
8. THIS SYSTEM 15 NOT DESIGNED FOR
THE USE OF A GARBAGE GRINDER.
A GARBAGE GRINDER IS NOT
RECOMMENDED DUE TO RECOGNIZED
ADVERSE IMPACTS TO THE LEACHING
FACiU i {.
iY •Y: Y
The BSC Group, Inc
657 ROUTE 28, UNIT 6
WEST YARMOUTH, MA 02673
(508) 778-8919
PROJECT TITLE:
SEWAGE DISPOSAL
SYSTEM DESIGN
LOT 23
53 DESERT
SANDS LANE
YARMOUTH
MASSACHUSETTS
AUG n � isss
HEALTH DEPT.
PREPARED FOR: �y%'�
GRAND COVE LANDING, INC.
464 MAIN STREET
WEST DENNIS, MA 02670
DATE: JUNE 16, 1999
COMP. DESIGN: S. wlLsoN
CHECK: S. wlLsoN
DRAWN: K. HEALY
FIELD: A.D. / K.H.
FILE N0. 8078-sEP.Dwc
DWG N0. 5148-01
SHEET 1 OF 1
JOB N0.4-8079.00