Loading...
HomeMy WebLinkAbout991 West Yarmouth Road Title 5 Site PlanALL SYSTEM COMPONENTS SHALL BE NOTES SYSTEM PROFILE MARKED WITH MAGNETIC TAPE -OR " (NOT To SCALE)„ COMPARABLE MEANS FOR FUTURE LOCATION. 1. DATUM IS APPROX. NGVD A'•. ' CONCRETE COVERS TO WITHIN 3" GRADE SYSTEM DESIGN: ACCESS COVERS TO WITHIN 6 OF FIN. GRADE 2" PEASTONE OR GEOTEXTILE 2. MUNICIPAL WATER IS AVAILABLE M FILTER FABRIC OVER STONE TOP FOUND. EL. 45.5' S NOT -ALLOWED 2% SLOPE REQUIRED OVER SYSTEM 43.0' 42.0' 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. GARBAGE DISPOSER I 44.0 ' MINIMUM .75' OF OVER PRECAST GPD " 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS LGN FLOW: 5 BEDROOMS ®110 GPD = 550 PRECAST N_to BLOCKS OR TO BE AASHO H-14 DESIGN _ PRECAST RISERS RISERS (TYP.) . •` - 4"05CH40 PVC MORTAR ALL 550 GPD DESIGN FLOW 4 -' 2f PROP. TEE PES LEVEL.IST 2 COMPONENTS H-10 - B. PIPE JOINTS 70 BE MADE WATERTIGHT. USE A ,. 'scrta0 PVC - PI 4' NV's E 39.1 4' CNP.) y. ENDS SIDES 40.0 6. CONSTRUCTION DETAILS TO BE IN. ACCORDANCE WITH, = 1100 ,o: ° of : ;. oe oo;o0 310 CMR 15.ODO TITLE 5. SEPTIC TANK: 550 GPD '(2) ( ) *42.5' 10. 0o GACa-to 14 ° o ° ° ®®® ®®®® ®®® ®®®® ;gogooag& t K TEE ., to TEE 41.75 °°°°°°°° . ®®®®®® ® ®®®®®®® ®®®°g°gog°o S OR PROPOSED WORK ONLY AND NOT TO USE A 1500 GAL. H-10 SEPTIC TAN (PROP) 42.0SEPTIC TANK °°° 7. THIS PLAN I F '`. 4' Dq. LEVEL. a opeaoa00000a n° - ;Qo°000000 ®®®®®�®®�jj�®®® ®®® ®®® °opoeoo BE USED FOR LOT LINE. STAKING OR ANY OTHER :. GAS BAFFLE.. n ,°,o°o°o°a�o°o o°,' ro°p°p°po ®®®®®®L®®®® ®®�®®®�®®®� ,00eQ0000 . " LEACHING: ACME oa Eoua °g°g°g°0 ° ,°°°°° 37.17 PURPOSE. 12 83 2 (74) - 162 GPC r 39.53' 39 36' ° SIDES. 2 (42 ) „t „ . .A•, •, , , , .,;. B. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. • WATER -TEST D BOX FOR LEVELNESS 42 X 1283 (74) 398 GPD . 0 0 0 o c - -, H-10 500 GAL LEACHING CHAMBER BY ACME` PRECAST OR EQUAL BOTTOM o°0°0°000000000000°0000c 3/4"-1-1/2" DOUBLE WASHED STONE 4 MIN. (4) UNITS REQUIRED : 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED onono°o„o�o o�o�o�o„o„o� ALL AROUND PRECAST STRUCTURES 756 S.F. 560 GPD WITHOUT INSPECTION BY BOARD OF HEALTH AND ..TOTAL.. - ". 6" CRUSHED STONE OR MECHANICAL ..OVERALL -DIMENSIONS TO OUTSIDE OF STONE: 42.0 X 12.83 5 BT -.. �:' `PERMISSION OBTAINED FROM BOARD OF HEALTH. -10 LEACHING CHAMBERS (ACME COMPACTION. (15.221[2)) AL OR EQUAL) 150' .. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING - - USE (4) 500 GAL. H 20' 26.5' DIGSAFE (1-898-34477233) AND VERIFYING THE LOCUS MAP E WITH 4 ST ONE ALL AROUND THE 8.7% LOCATION OF ALL UNDERGROUND &OVERHEAD UTILITIES _ _ PRIOR TO COMMENCEMENT .OF WORK..NOT TO SCALE D ALL..'31.3 BOTTOM TH-1 1 3 15 % SLOPE) (_7. SLOPE) (-R SLOPE) NO GROUNDWATER FOUND A COUNTERED SHALL BE 11. ANY UNSUITABLE MATERIAL EN JG ANY REMOVED 5' EENEATH AND AROUND THE PROPOSED ' ASSESSORS MAP 123 PARCEL 107 LEACHING MA 4 - -' BOX 21' FOUNDATION- . 17 SEPTIC TANK 15 D FACILITY ' LEACHING FACILITY.. LOCUS IS WITHIN FEMA FLOOD ZONE C APPROVED DATE BOA RD CF HEALTH 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED. 13. CONTRACTOR TO COORDINATE ALL UTILITY DISCONNECTS AND NEW SERVICES WITH APPROPRIATE VENDORS a Ry TRICT EXISTING 40,000 S.F. 35,513 S.F. 150' 180' 30' 118.3' 20' 26.5' 20' 28.6' 25% 8.7% IN AQUIFER ,ORD PROP. 140 SF SHED - 137.34 I x 7.91 37.5(3