Loading...
HomeMy WebLinkAbout17 Doves Wing Road Proposed Septic Design§� 20 FT. MINIMUM FROM CELLAR ' 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE 4 e TOP OF FOUNDATION 2" SCHEDULE 40 PVC PIPE ' ELEV, _ 38.00_ 10 FT. MINIMUM MIN, PITCH 1/8" PER FT. 2" PRESSURE PIPE MANHOLE COVERS S-M,°N, fj PACKAGE ELEV. L CHECK VALVE 1500 ELEV. ' GAL PUMP CHAMBER (TO BE SET ON A FIRM BASE) 2000 GALLON ELEV. AT INVERT INLET SEPTIC TANK ELEV. AT ALARM ON SEWAGE DISPOSAL SYSTEM PROFILE ELEV. AT PUMP O ELEV. AT PUMP OFF _3L•58 " NOT TO SCALE BOTTOM OF INSIDE PUMP CHAMBER _3i0•ZS_ BOTTOM OF OUTSIDE PUMP CHAMBER _3030_ r N 34� • 34,50 \ 36.53 36.81 x \ f 36.77 / 34.06 1 36.30 / SOIL 34.05 TEST Z �4 V - _ O SERE SA INSPECTION 2" LAYER OF CAP & CLEAN SAND PORT 1/8" TO 1/2" MANHOLE VALVE WASHED STONE COVERS VENT 38.00 MAX. 33.75 AIN. R FILTER FABRIC REQUIRED I \ Z 5 0 0 0 0 o e a o 0 e o a o o 14 STANDARD INFILTRATORS WITH STONE IN A 10.33" X 49' X 6• FIELD FORMATION SOIL ABSORPTION SYSTEM (SAS) PUMP CHAMBER CALCULATIONS: ELEV. - _31.42 19.12 WELL A1w 230C ZONE INDEX 23.3 ADJUST 28 USGS PROBABLE WATER TABLE ELEV. - 19 0_ OBSERVED WATER TABLE (9/13/05) ELEV.. 9-50_ TEST HOLE 2, LOT 9 BOTTOM OF TEST HOLE ELEV. = _24,44_ REQUIRED FLOW PER CYCLE .25 X _MO B a t GAL./CYCLE VOLUME PER CYCLE 8250 GAL/CYCLE /7.48 GAL./CU. FT. _ -] A3 CU. FT./CYCLE VOLUME OF WATER IN FEED 3.14 X 0.00694 X �FT. = _0 ]Z_ CU. FT. VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X -_5_ FT. = x.25_ CU. FT. TOTAL VOLUME OF WATER RETURNED 4>62_ CU. FT. TOTAL MINIMUM VOLUME PER CYCLE L. CU, FT. DISCHARGE CU.FT. /34.67 CU.FT./FT. _ _4,33_ FT. (1000 G.S.T.) STORAGE CAPACITY (_,i30_GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.) 1.27 FT. 1.27_ REQUIRED _254_ PROVIDED • 36.81 3. o -� \ \ 36.05 n4 3i \ ?o 2 .34.81 1 ` S 49.00' \3 • 36.35 LOT 13 17, 002 f S F. EX AX -20-20 FILTER • 34.35 GALLIC D TAN PUMP ' ADVANTEX MODEL AX -20 150 PSI MINIMUM VALVE MANHOLE COVERS 3" DIA. PVC. CHAMBER 1/ 4.00 4" CAST IRON PIPE MANIFOLD VALVE 0o NO (OR EQUAL) MINIMUM 7-12 B LOAMY SAND PITCH 1/4" PER FT. C MEDIUM SAND COBBLES ELEV. C 2" HOLE/ ELEV. m / V) COBBLES a 3/8" DRILL-_3_t92_J BIOTUBE HOLE 3/4" TO 1 1/2" CLEAN SOME LOCATION MAP 5.0' FLOW LINE PUMP DOUBLE WASHED STONE 5.0' LOAMY SAND FREE OF FINES & SILT S-M,°N, fj PACKAGE ELEV. L CHECK VALVE 1500 ELEV. ' GAL PUMP CHAMBER (TO BE SET ON A FIRM BASE) 2000 GALLON ELEV. AT INVERT INLET SEPTIC TANK ELEV. AT ALARM ON SEWAGE DISPOSAL SYSTEM PROFILE ELEV. AT PUMP O ELEV. AT PUMP OFF _3L•58 " NOT TO SCALE BOTTOM OF INSIDE PUMP CHAMBER _3i0•ZS_ BOTTOM OF OUTSIDE PUMP CHAMBER _3030_ r N 34� • 34,50 \ 36.53 36.81 x \ f 36.77 / 34.06 1 36.30 / SOIL 34.05 TEST Z �4 V - _ O SERE SA INSPECTION 2" LAYER OF CAP & CLEAN SAND PORT 1/8" TO 1/2" MANHOLE VALVE WASHED STONE COVERS VENT 38.00 MAX. 33.75 AIN. R FILTER FABRIC REQUIRED I \ Z 5 0 0 0 0 o e a o 0 e o a o o 14 STANDARD INFILTRATORS WITH STONE IN A 10.33" X 49' X 6• FIELD FORMATION SOIL ABSORPTION SYSTEM (SAS) PUMP CHAMBER CALCULATIONS: ELEV. - _31.42 19.12 WELL A1w 230C ZONE INDEX 23.3 ADJUST 28 USGS PROBABLE WATER TABLE ELEV. - 19 0_ OBSERVED WATER TABLE (9/13/05) ELEV.. 9-50_ TEST HOLE 2, LOT 9 BOTTOM OF TEST HOLE ELEV. = _24,44_ REQUIRED FLOW PER CYCLE .25 X _MO B a t GAL./CYCLE VOLUME PER CYCLE 8250 GAL/CYCLE /7.48 GAL./CU. FT. _ -] A3 CU. FT./CYCLE VOLUME OF WATER IN FEED 3.14 X 0.00694 X �FT. = _0 ]Z_ CU. FT. VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X -_5_ FT. = x.25_ CU. FT. TOTAL VOLUME OF WATER RETURNED 4>62_ CU. FT. TOTAL MINIMUM VOLUME PER CYCLE L. CU, FT. DISCHARGE CU.FT. /34.67 CU.FT./FT. _ _4,33_ FT. (1000 G.S.T.) STORAGE CAPACITY (_,i30_GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT.) 1.27 FT. 1.27_ REQUIRED _254_ PROVIDED • 36.81 3. o -� \ \ 36.05 n4 3i \ ?o 2 .34.81 1 ` S 49.00' \3 • 36.35 LOT 13 17, 002 f S F. EX AX -20-20 FILTER • 34.35 GALLIC D TAN 1 LOT L) I - N 1 \ 2" 1 FRO I 1-1/2" LATERAL LINE 3/8" HOLES 0 5' O.C. ALTERNATE SIDES (0 11 AND 1 O'CLOCK) 3 - 3/8" DRAINAGE HOLES PER LATERAL ® BEGINNING, MIDDLE & END (6 TOTAL) 3" PVC MANIFOLD DISTRIBUTION LATERALS AT 52" o.C. SIDE VIEW SOIL TEST DATE OF SOIL TEST MAY 18 2006 _ SOIL'JESTOONE• BY SWI ENGINEERING WITNESSED. BY 08SMA11011 HOLE 1 ELEV.= 34.00 03SMA110N HOLE 2 ELEV.=34.80 PERCOLATION RATE .-I M.N./INCH AT _LL-_ INCHES PERCOLATION RATE _«MIN./INCH IN C HORIZON DEPTH PUMP ' I TEXTURE a CHAMBER 1/ �` o A S Q! L 0o NO TE§1\ 1 7-12 B LOAMY SAND o C MEDIUM SAND COBBLES 12-120 C MEDIUM SAND V) COBBLES SOME LOCATION MAP 5.0' SHEET i OF 1 5.0' LOAMY SAND 1 LOT L) I - N 1 \ 2" 1 FRO I 1-1/2" LATERAL LINE 3/8" HOLES 0 5' O.C. ALTERNATE SIDES (0 11 AND 1 O'CLOCK) 3 - 3/8" DRAINAGE HOLES PER LATERAL ® BEGINNING, MIDDLE & END (6 TOTAL) 3" PVC MANIFOLD DISTRIBUTION LATERALS AT 52" o.C. SIDE VIEW SOIL TEST DATE OF SOIL TEST MAY 18 2006 _ SOIL'JESTOONE• BY SWI ENGINEERING WITNESSED. BY 08SMA11011 HOLE 1 ELEV.= 34.00 03SMA110N HOLE 2 ELEV.=34.80 PERCOLATION RATE .-I M.N./INCH AT _LL-_ INCHES PERCOLATION RATE _«MIN./INCH IN C HORIZON DEPTH I HORIZ I TEXTURE COLOR MOTT. OTHER 0-7 A LOAMY SAND 10YR4/2 NO ROOTS 7-12 B LOAMY SAND 10YR5/6 C MEDIUM SAND COBBLES 12-120 C MEDIUM SAND 2.5Y7/4 COBBLES SOME LOCATION MAP 5.0' SHEET i OF 1 5.0' LOAMY SAND NO WATER ENCOUNTERED AT ___121" ELEV. = __242D END VIEW 'RESSURE PIPE A PUMP CHAMBER \ HORIZ TEXTURE COLOR MOTT. OTHER 0-5 A LOAMY SAND 10YR4/2 NO 5-12 B LOAMY SAND IOYR6/4 Q o COBBLES 12-120 C MEDIUM SAND M M I 'O. � OF` HEALTH REVISED LOCATION MAP 5.0' SHEET i OF 1 5.0' -0 TOP VIEW DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-5 A LOAMY SAND 10YR4/2 NO 5-12 B LOAMY SAND IOYR6/4 Q o COBBLES 12-120 C MEDIUM SAND 2.5Y8/1 COBBLES NO WATER ENCOUNTERED AT 120" ELEV. = _24 80_ DESIGN CALCULATIONS NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW ( 110 GAL/M/DAY X 3_ 8R.) REQUIRED SEPTIC TANK CAPACITY ACTUAL SIZE OF SEPTIC TANK SOIL. CLASSIFICATION DESIGN PERCOLATION RATE EFFLUENT LOADING RATE LEACHING AREA 10.33 X 49 LEACHING CAPACITY (AREA X RATE) 506.17 X 0.66 RESERVE LEACHING CAPACITY M _330_ GAL./DAY --660_ GAL. _2000 GAL. MIN./IN. OX -0_ GAL./DAY/S.F. -506.17 SQ. FT. M4o7 GAL./DAY 334.OZ GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WIYHSTANDING H-20 LOADING. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. -6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION' IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY, 8. PARCEL IS IN FLOOD ZONE --C 9. LOT IS SHOWN ON ASSESSORS MAP --19-9- AS PARCEL _ X 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. 11. ALARM IS TO BE BOTH AUDIO AND VISUAL. 12. SEPTIC TANK AND PUMP CHAMBER ARE TO. BE TESTED TO INSURE THAT THERE IS NO INFILTRATION OF GROUNDWATER INTO FACILITIES. 13. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE' REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15,255:(3). 14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED. 15. THE SEPTIC TANKS AND PUMP CHAMBER ARE TO BE SET ON A FIRM BASE OR 3/4" TO 1 1/2" STONE 6" THICK. 16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOP THE FOLLOWING MINIMUM INSPECTIONS: 1. STAKE OUT SYSTEM. 2. PRIOR TO AND DURING THE SETTING OF THE TANKS. 3. IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION. 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. 5. INSTALLATION OF ALL PIPING. 6. COMPLETION OF SEPTIC SYSTEM, PRIOR TO BACKFILL. 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A SUITABLE DISPOSAL SITE. 18, PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY & 14.5' HEAD) OR EQUAL. DATE AGENT u/CVv ? Z Z If, N Gllp o ® STS Rti ROUjG 6 PROPOSED SEPTIC DESIGN FOR NEW ENGLAND CARPENTRY F cr- PROJECT LOCATION IDT 12 DOVE'S DING ROAD, YARMOUTH ?' ! 5 Q o DATE JULY 21, 2006 _ 1 i APPROVED: BOARD OF` HEALTH DATE AGENT C.- jS8,PRO✓,6250-00jdwgj6250-OOSASDWC ®2006 SWEETSER ENGINEERING 64111 u/CVv ? Z Z If, N Gllp o ® STS Rti ROUjG 6 PROPOSED SEPTIC DESIGN FOR NEW ENGLAND CARPENTRY PROJECT LOCATION IDT 12 DOVE'S DING ROAD, YARMOUTH S )=7? WG�7WG 235 GREAT WESTERN 508- P. 0. BOX 713 39B-3922 SOUTH DENNIS, MASS. 02660 DATE JULY 21, 2006 scALE 1 " = 20' JOB N0. 6250-00 REVISED LOCATION MAP REVISED SHEET i OF 1 C.- jS8,PRO✓,6250-00jdwgj6250-OOSASDWC ®2006 SWEETSER ENGINEERING 64111