HomeMy WebLinkAbout23 Doves Wing Road Proposed Septic DesignTOP OF FOUNDATION
ELEV. - 34.80 +
6.50
SLAB ELEV.
ELEV. =
FT. MINIMUM
24" MANHOLE
COVER
4" CAST IRON PIPE
(OR EQUAL) MINIMUM
PITCH 1/4 PER FT.
ELEV. . 24.80
20 FT. MINIMUM FROM CELLAR
10 FT. MINIMUM FROM SLAB OR CRAWL SPACE
® 2" PRESSURE PIPE
PLANT 150 PSI MINIMUM
ON 24COVAERS LE -\
i
MANHOLE
COVERS
2" SCHEDULE 40 PVC PIPE
MIN. PITCH 1/8" PER FT.
/ CAP &
VALVE
3" DIA. PVC.
MANIFOLD VALVE
3/8" DRILL
0 -HOLE
ELEV
Jrn
o
CHECK
2" HOLE/
ELEV. -_/
X �_��JJJ
3/4" TO 1 1/2" CLEAN
DOUBLE WASHED STONE
FREE OF FINES & SILT
(TO BE PLACED ON FIRM BASE) - VALVE
SINGULAIR TREATMENT PUMP
PLANT CHAMBER
SAMPLE CATCH AND
RECIRCULATING PUMP ELEV. AT INVERT INLET _24,011-
ELEV. AT ALARM ON _2L.%_
SEWAGE DISPOSAL SYSTEM PROFILE ELEV. AT PUMP ON _2123-
ELEV. AT PUMP OFF
NOT TO SCALE BOTTOM OF INSIDE PUMP CHAMBER
BOTTOM OF OUTSIDE PUMP CHAMBER _18,1f4_
INSPECTION CAP &
SOIL TEST
CLEAN SANDVALVE DATE OF SOIL TEST SEPTEMBER 13. 2005
PORT 2" LAYER Of MANHOLE SOIL TEST DONE BY $jSER ENGINES TNG t
i/8" TO 1/2" COVERS VENT WITNESSED BY A. VON HONE j^
35.00 MAX 32.75 I+IIN. WASHED STONE REQUIRED OBSERVATION HOLE ELEV.g_35.90
OBSI RVATION HOLE '2 ELEV.++�34.10 - I
PERCOLATION RATE
__4L_2_ MIN./INCH AT __L8L INCHES PERCOLATION RATE < 2
>
32.00
2" HOLE
ELEV. 30_62_
0 0 0 o.= .,0�, ...0 " o ELEV. 30.42
0 0 o 0 0 o e 0 0 0 0 0 0 0 0 060
14 STANDARD INFILTRATORS WITH
STONE IN A z WELL A1W 230
10.33' X 48' X 5" FIELD FORMATION ;i 18.12 ZONE C
1n INDEX 23.3
ADJUST 2B
DEPTH HORIZ
TEXTURE
COLOR
MOTT.
OTHER
0-30 B/C7
30-120 C2
LOAMY SAND
MEDIUM SAND
2.5Y7/4
NO
STRIPPED/MIXED
MIN./INCH IN C2 HORIZON I`
11 1
SOIL ABSORPTION
DEPTH
HORIZ
TEXTURE COLORMOTT.
NO WATER ENCOUNTERED AT pi
OTHER
0-66
66-150
B/C1
C2
LOAMY SAND
MEDIUM SAND 2.5Y7/4
NO
STRIPPED/MIXED
SYSTEM (SAS)
NO WATER ENCOUNTERED AT__12(1. ELEV. _ _ 95 qD
NO WATER ENCOUNTERED AT pi
2
ELEV, m 1 Af)
j
USGS PROBABLE WATER TABLE ELEV.
OBSERVED WATER TABLE (9/13/05) ELEV.
_ -1230
. 2-50 TEST HOLE 2, LOT s
DESIGN CALCULATIONS
I
PRO LOCATION LOT
Dii'S PIING ROAD, YARMOUTH
;.
BOTTOM OF TEST HOLE ELEV.
_ 21.60
NUMBER OF BEDROOMS
3
PUMP CHAMBER CALCULATIONS:
:a
SCALE 1" _ 20'
GARBAGEUNI T
-
I
REV. FEB. 29, 2008
IDB NO. 6250-00
TOTAL ESTIMATEDPOSAL
REQUIRED FLOW PER CYCLE .25 X 330 a 82 o CAL./CYCLE
REV.
SHEET 1. OF '1
( 110 GAL/BR./DAY X 3 BR.)
_;330_ GALDAY/
VOLUME PER CYCLE _92=_GAL/CYCLE /7.48 GAL./CU. FT. 03 11.CU. FT./CYCLE
REQUIRED SEPTIC TANK CAPACITY
--600---600- GAL
i;
VOLUME OF WATER IN FEED 3.14 X 0.00694 X 42_ FT. _ A.$2_ CU. FT.
ACTUAL SIZE OF SEPTIC TANKSOIL
GAL.
VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X _5FT. . 0.25 CU. FT.
1-1/2" LATERAL LINE
CLASSIFICATION
__�_
TOTAL VOLUME OF WATER RETURNED 1.17 CU..
3/8" HOLES D 5' O.C.
DESIGN PERCOLATION RATE
TOTAL MINIMUM VOLUME PER CYCLE 12.20_ CU. FT.
ALTERNATE SIDES
EFFLUENT LOADING RATE
GAL/DAY/S.F.
//DAY/S.F.
DISCHARGE 1220 CU.FT. /34.67 CU.FT./f T. _ 0.35_ FT. (1000 G.S.T.
(ID 11 AND 1 O'CLOCK)
LEACHING AREA
G A
8!14-
18 SQ. FT.
STORAGE CAPACITY (�3Q_GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./p - _1,27FT.
O
X48
33X4CAPACITY
{;
1.27 REQUIRED _2.54_ PROVIDED
c
LEACHING (AREA X RATE)
3S1.e GAL/DAY
475.18 X 0.74
3 - 3/e" DRAINAGE HOLES PER LATERAL
RESERVE LEACHING CAPACITY
.'�' LB,3 GAL A
/D Y
0 BEGINNING, MIDDLE & END (6 TOTAL)
I"
3" PVC MANIFOLD
DISTRIBUTION LATERALS
AT 5r G.G. SIDE VIEW
END VIEW
t'
r'
2 PRESSURE PIPE 2.5 5.0
FROM PUMP CHAMBER NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR °
THE SUBSURFACE DISPOSAL OF SEWAGE.
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
\ ; FINISHED GRADE.
w 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF +*
WIYHSTANDING H-20 LOADING.
pin
.* 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL i
Q ply BE MORTARED IN PLACE,
� 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
•134.5 .36.5 0. ..
t � DEEDED OR ZONING REGULATIONS. OWNER / :APPLICANT IS TO �
\ \ OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
589 7509' 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
IS TO CALL "DIG -SAFE" AT 1-688-344-7233 AT LEAST 72 HOURS {
PRIOR TO COMMENCING WORK ON SITE.
\ \ LOT 1 \ 9 36.8 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS ;
• 20.1
A MP 1 % 02 1 �0 �� �O / SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
I I CH MBER S.F. e e?� 3 RESERVE Sqs
I S�4, .06 1S TO 8E BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
• 1 J O Sol SOIL s 5.0' 5.0' IMMEDIATELY.
_ 19 7 °D S _1 TEST 2 '� �4�72' 8. PARCEL IS IN FLOOD ZONE C
I AMPLE � V �9. LOT IS SHOWN ON ASSESSORS MAP `
O 106 AS PARCEL x -
ATCH ,/�?� R SERVE $=S 10. PUMP 1. ALARM ISOTOLARM ARE TO BE BOTH AUDIO ON AND VISUAL. CIRCUITS.
¢{ _
+ I! V 12. SEPTIC TANK AND PUMP CHAMBER ARE TO BE TESTED TO INSURE
SOIL o n 3_ TOP VIEW THAT THERE IS NO INFILTRATION Of GROUNDWATER INTO FACILITIES I `
! y`' SIN ULEN 9 ODN \ TEST 2� 46.00• y o ; 13. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND j
TRE ENT PLANT \ Twp \ P2
I 34.8 _ / 2 I FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM . AND BE
f � / / �S fie\ REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3).
I > > 14. EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED. i
I 2 y �' 19-00' �y 15. THE SEPTIC TANKS AND PUMP CHAMBER ARE
1g,8 J / k 33.5 O TO BE SET ON A FIRM BASE OR 3/4" TO 1 1/2" STONE 6' THICK.
16. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE
I
' L h \ S IL Q
1 ij� � FOLLOWING MINIMUM INSPECTIONS:
�llrii� vTES 1 17,0(1. STAKE OUT SYSTEM. (
DECK , 2. PRIOR TO AND DURING THE SETTING OF THE TANKS.
�1 t
3. IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION. 1
a1 (14) jl`i�7r 1 ,rrl��, 2w "' �. 4. EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. -
r
/ ry �- ,II ��o O 5. INSTALLATION OF ALL PIPING.
( 6. COMPLETION OF SEPTIC SYSTEM, PRIOR TO BACKFILL.
I / `ry6 1111J /r �!( 'Irl � eo�ry GP�7J�Q7 \ � 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, .SAND, DEBRIS TOA I
r h o Q �P SUITABLE DISPOSAL SITE.
/ /+�o�•-�`_ ' 10 x ooQ'� � .
18. PUMP IS TO BE A MEYERS SRM 4 4 10 HP W 31 GPM CAPACITY
r
"�
• 20.8 / ��Irr� 35.6 DECK12 ry�4 \ / (/
/ jrljl� �ti 536.5 & 14.5' HEAD) OR EQUAL,
1 3�_ B.Ni.,9 1
pa j �38. ++.
OSED
3 B DR SLING ilh
r f
I( PORCH
Q18.5 PR -{ I
�• 26 / �-� ;! ?�/' POSE D
` ' I @S�. 3 §2DROOM LING
�� _ ` • 31.0 30.4 \ 33.5 h
+ 1
~ \ 35.2 1 / 5
-4- . 3 ., j •� _ \ N - Yaml9uth Health DeD
� rtment
M
•-_ �'
h ` \'/ • F"tMOF; % OF I�PROIIE
(Ik.s„
32.2 3.5 V �` y�Wp
• 32.8 k 32 3 T• A _ Data 1
�f DUMAS
D�1 v ` No 619��
Dom srYG ROS APPROVED: BOARD OF HEALTH '?
11.4
-(32) 'v PATE AGENT Ji
)T 18 _ !
34.2 � '� � � ! =� 33.5
4 ® 33.7 .3
` \ • 3.0
LOT 20 • 3 : o.
34.4
1 \ 1
\•� 35.0
LEGEND:
EXISTING SPOT ELEVATION 00x0
EXISTING CONTOUR y,--00---- 1
FINAL SPOT ELEVATIQN \
FINAL CONTOUR
SOIL TEST LOCATION \
UTILITY. POLE -0-
TOWN WATER -WSW
CATCH BASIN (®"k
GAS LINE -9-
CLEAN CLEAN OUT _.---�0
CESSPOOL C.P.0
17,158 # SF, A
N
r
_I
�r
t• 4.2 34.18
� ro
* 33.5 j4.3f \\
F�
C.' S8 PRO✓ 6250-00 dw 6250-OOSASDWC 02006 SWEETSER-ENGINEERING
0.
LOCUS ?
z
1Y N
Cp�gT y to
rS o
RO�ZE 6
.PROPOSED SEPTIC :DESIGN
FOR
DUBLIN CONSTRUCTION, INC,
f'
I
PRO LOCATION LOT
Dii'S PIING ROAD, YARMOUTH
S "r2� WESGRN ROAD G
398 03922 P. 0. BOX 713
SOUTH DENNIS, MASS, 02660
DATEAUG. 3, 2006
:a
SCALE 1" _ 20'
I
REV. FEB. 29, 2008
IDB NO. 6250-00
LOCATION MAP
REV.
SHEET 1. OF '1
,
C.' S8 PRO✓ 6250-00 dw 6250-OOSASDWC 02006 SWEETSER-ENGINEERING
Y`
f'
:a
I
,
C.' S8 PRO✓ 6250-00 dw 6250-OOSASDWC 02006 SWEETSER-ENGINEERING