Loading...
HomeMy WebLinkAbout29 Doves Wing Road Proposed Septic DesignTOP OF FOUNDATIQN I 6.5Q it I r $LAB ELEV, _TT I i i I� I I i i 20 FT. M NIMU FROM CELLAR OR CRAWL 5VACt 928 10 FT. INIMUM 10 . MINIMUM FRgM SLAB FSINGUULAIIR CLEAN SAND _T 24" MANHOLE ® 24" TREAIMeNT PLANT MA HOL COVERS �, LEGEND: I45PECTION PORT `.OAM AND SEEP EXISTING SPOT ELEVATION QO„0 COVE MOPEL 960 ON 4" SCHEDULE 40 PVC PIPE R' LgYLR OF 1/8" TC 1/2" FINAL CONTOUR �p 901L TEST LOCATION N MIM. PITCH 1�8" ER PT. WASHED STONE CATCH BASIN®j GAS LINE---r^-� CLEAN OUT 2809 M R FILTER FABRIC 2 75 MIN. TREQUIRED NOTT 4" CAST IRON PIPE MINIMUM z PI CH PFIRFT. PITCH 1/6' L TEE �pp � ELEV, LIN TWT— p❑❑❑❑0❑❑❑q❑ ELEV, — 10�wl, pp LEVEL °o° o p ❑ CO ❑ ❑ ❑ ❑ ❑ ❑ CT ❑ c °9 ° 140 ML. :2,0.75 ELEV. r � MIN. LE o ELEV, EL931q o fi" $LIMP ELEV.. + - ° °? p Cl ❑ ❑ ❑ ❑ ❑ ❑ O q ❑ . 0 20 ° VINYL UNPR DISTRIBUTION ELEV. °° q ° ° P ❑ l7 ❑ O ❑ ❑ ❑ ❑ q ❑ F o 0 o EI.EV. (TQ 84 PLgCED ON FIRM BASE) $OX -�� 509 GALLON OALLP,Ys 4TH ELEV. - —��— $INGULAIR TREATMENT (TO QE WATER TEST�D) STONE IN AN 1 X 25 X 2 TRENCH FORMATION ? WELL A1W 230 845 ZONE PLANT SAMPLE C� TOH AND 3/4' Tp 1 1/2" QLEAN DOUBLE WASHED STONE S � SOL ABSORPTION 4� INDEX_ ��_ ADJUST 268 RECIRC�ILATII�G PUMP FREE OF FINES & SILT SYS M AS S W.AGF DISPOSTAa SY TSM SPROBABLEGS . 0 SERYED WATER ABLE (' /13/D5) ELEVo TEST H3LE ELEV. - a -M 9TEST HOLE ;, LOT 9 TO BOTTOM QF Y`T ® 27,7 ZI1 7 � 7 M II22 2 r n.s 3d.6 00 j � 30.4 r960DN PLANT RTS 31.E �.,,r FILE DAT OF SOIL TEST JUN _21y�D0 SOIL TEST DOME BY $-W WITNESSED BY P. RrNAU � r O@SERV�TIPN HOLE 1 �LEV•r— l�- PERCOLATION RATE <_Z,._ MIN./INCH AT _69_r_ INCHES 3pSERvA'ngN HOLE 2 F�LEV.1=-2 DEPTH HORIZ TEXTURE DOLOR MOTT. OTHER 0-3" Ap LOAM SAD IOYRS/4 NQ 3-126" IC IMEDIUH SA 0 2.5Y7/4 f o WATER �NCOYNTERED RT ELEV. DESIGN OAI,CULATIONS 3 NUMMBER OF REDRgOMS GARBAGE DISPOSAL UNIT TOTAL EPTIMgTED. LOW ( 110 GAL/BR.AAY K .- — �R.) _ !ff_ GAL./DAY REQUIRED SERTIC TANK CAPACITY _.4 D_ GAL, ACTUAL SIZE 0F SPPTIC TAMC _LW GAL. SOIL CLASSIFIFATIQN —� DESIGN FERCQLATIQN RATE MIN./IN. 5-�-- EFFLUENT LOADING RAT �07Jq,-4p-p GAL./DAY/S.F. LEACHINQ AREA % "" 7"' SQ. PT. CHINO )+(38X?,X2t LEACHINQ CA ACITY AREA X RATE) ZQ PAL./DAY 477.00 X 0.7, 4 RESERVE LEACHING CAPACITY Z+j9L PAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND TOE TQWN'$ RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVEIRS TQ SANITARY UNITS STALL BE Q.ROUgHT TO WITHIN 6"OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAP66LE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING ARPAS. H-20 LOADING SHALL. BE USED UNDER OR WITHIN 10 FA OF DRIVES OR PARKING AREAS. 4. ANY MASQNARY UNITS USED TO BRING COVERS TQ GRANDE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS PEEN MADI AS TO COMPLIANCE WITH DEEQED OR ZONING REGQLATIQNS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMWATION FROM APPROPRIATE ALITF ORI 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION, CON ACTOR I5 TV GA4L 'OIG- 4f -FE- AT ,-888-3447233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS 10 VERIFY GRADE$ ANP ELEVATIONS qS WELL AS SITE CONQITIONS PRIOR TO COMMENCING WORK ON SITE, ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION QF THE DESIGN ENGINEER IMMEDIATELY. '•-- 8. PAROEL IS IN FLOOD ZONE C 9. LOT IS SHOWN ON ASSESSOR$ MAP 109_ AS PARCEL 5.12 10. THE INSTALLER IS TO GIVE THE ENGINEER A MINIMUM QF 48 HOURS (2 WORKING DAYS) NOTICE FOR THE FINAL INSPECTION (NUMBER PELOW). 11. ALL UNSUITABLE MATERIAL SHALL PE REMOVED FROM ANDER AND FOR A MINIMUM OF 5 AROUND SOIL ABSORPTION SYSTEM AND BE RERLACED ... WITH SAND AS SPEOIFIED IN 310 CMR 14.255;(3).' 12. THIS SITE HAS BEEN F1 4ED SINCE THE SOIL TEST WERE DONE, THE COMPOSITION OF THE FILL IS VNKNQWN, HENCE THE OVFRDIQ. pl 9l �sTF� LQCATION MAP APPROVED: BQARD OF HEALTH PATE AGENT ROPOSF,,D SUTIP PEPIPN FOR DAVOO DUILDER"S, LLC LOT 10 — #29 DOVE'S WING ROAD, YARMOUTH 508•- r. U. PUA i Is 5-69Q0 SOUTH DENNIS, MASS, 0; rE i DFC. 3, 2410 s�ALE 1 ° — 20` r r -r— -�---1 JQe "q 625Q-10 SHELT OF MOO P�� 928 29.7 LEGEND: EXISTING SPOT ELEVATION QO„0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATIONO. FINAL CONTOUR �p 901L TEST LOCATION N UTILITY POLE -0- TOWN WATER r-W�+q—SWT^" CATCH BASIN®j GAS LINE---r^-� CLEAN OUT CESSPOOL C.P. 0 00 j � 30.4 r960DN PLANT RTS 31.E �.,,r FILE DAT OF SOIL TEST JUN _21y�D0 SOIL TEST DOME BY $-W WITNESSED BY P. RrNAU � r O@SERV�TIPN HOLE 1 �LEV•r— l�- PERCOLATION RATE <_Z,._ MIN./INCH AT _69_r_ INCHES 3pSERvA'ngN HOLE 2 F�LEV.1=-2 DEPTH HORIZ TEXTURE DOLOR MOTT. OTHER 0-3" Ap LOAM SAD IOYRS/4 NQ 3-126" IC IMEDIUH SA 0 2.5Y7/4 f o WATER �NCOYNTERED RT ELEV. DESIGN OAI,CULATIONS 3 NUMMBER OF REDRgOMS GARBAGE DISPOSAL UNIT TOTAL EPTIMgTED. LOW ( 110 GAL/BR.AAY K .- — �R.) _ !ff_ GAL./DAY REQUIRED SERTIC TANK CAPACITY _.4 D_ GAL, ACTUAL SIZE 0F SPPTIC TAMC _LW GAL. SOIL CLASSIFIFATIQN —� DESIGN FERCQLATIQN RATE MIN./IN. 5-�-- EFFLUENT LOADING RAT �07Jq,-4p-p GAL./DAY/S.F. LEACHINQ AREA % "" 7"' SQ. PT. CHINO )+(38X?,X2t LEACHINQ CA ACITY AREA X RATE) ZQ PAL./DAY 477.00 X 0.7, 4 RESERVE LEACHING CAPACITY Z+j9L PAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND TOE TQWN'$ RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVEIRS TQ SANITARY UNITS STALL BE Q.ROUgHT TO WITHIN 6"OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAP66LE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING ARPAS. H-20 LOADING SHALL. BE USED UNDER OR WITHIN 10 FA OF DRIVES OR PARKING AREAS. 4. ANY MASQNARY UNITS USED TO BRING COVERS TQ GRANDE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS PEEN MADI AS TO COMPLIANCE WITH DEEQED OR ZONING REGQLATIQNS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMWATION FROM APPROPRIATE ALITF ORI 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION, CON ACTOR I5 TV GA4L 'OIG- 4f -FE- AT ,-888-3447233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS 10 VERIFY GRADE$ ANP ELEVATIONS qS WELL AS SITE CONQITIONS PRIOR TO COMMENCING WORK ON SITE, ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION QF THE DESIGN ENGINEER IMMEDIATELY. '•-- 8. PAROEL IS IN FLOOD ZONE C 9. LOT IS SHOWN ON ASSESSOR$ MAP 109_ AS PARCEL 5.12 10. THE INSTALLER IS TO GIVE THE ENGINEER A MINIMUM QF 48 HOURS (2 WORKING DAYS) NOTICE FOR THE FINAL INSPECTION (NUMBER PELOW). 11. ALL UNSUITABLE MATERIAL SHALL PE REMOVED FROM ANDER AND FOR A MINIMUM OF 5 AROUND SOIL ABSORPTION SYSTEM AND BE RERLACED ... WITH SAND AS SPEOIFIED IN 310 CMR 14.255;(3).' 12. THIS SITE HAS BEEN F1 4ED SINCE THE SOIL TEST WERE DONE, THE COMPOSITION OF THE FILL IS VNKNQWN, HENCE THE OVFRDIQ. pl 9l �sTF� LQCATION MAP APPROVED: BQARD OF HEALTH PATE AGENT ROPOSF,,D SUTIP PEPIPN FOR DAVOO DUILDER"S, LLC LOT 10 — #29 DOVE'S WING ROAD, YARMOUTH 508•- r. U. PUA i Is 5-69Q0 SOUTH DENNIS, MASS, 0; rE i DFC. 3, 2410 s�ALE 1 ° — 20` r r -r— -�---1 JQe "q 625Q-10 SHELT OF MOO P��